تخطي إلى المحتوى الرئيسي
Saeed Eng.

Saeed Eng.

الويب

كفاءة
Rūbah, البصرة15 USD/ساعة0عضو منذ ١٦ أبريل ٢٠٢٣
·

استعن بخدماته

اطلب عرض سعر بدون التزام

hydrogen generationpower plantmechanical site engineersteam turbineinstallationwaste water treatment

نبذة

Title: Mechanical site Engineer.2019- till now

Supervision Work to Installation the AL-RUMAILAH COMBINED CYCLE 730

MW POWER

PLANT PROJECT-BASRA With RAZ Company for General Contracting The equipment is provided by Siemens in Germany& TFA SIEMENS & Sin hydro Corporation Ltd –CHINA & KAR Electrical Power Production Trading FZE – OWNER:

a-Responsible of Installation for all:-

1-Installation MAIN POWER BUILDING – STEAM TURBINE GENERATOR

EQUIP. STEAM TURBINE HP/IP & LP & GENERATOR

A-Installation AUXILIARY EQUIPMENT IN STG HOUSE.

B-Installation TURBINE PROPER AUXILIARY EQUIPMENT.

2-Installation Heat Recovery Steam Generation – 5 HRSG UNIT. A-

Installation Feed Water Pump HP & IP & Re Circ. Water. B-Installation Inlet & Outlet Duct & Chimney Stack. 3-Installation CW.PUMP HOUSE & Cooling Tower SYS. 4-Installation Raw Water Treatment SYS.

5-Installation Fire Fighting SYS.

6-Installation Central Control Building EQUIP. 7-Installation Hydrogen Generation SYS.

8-Installation Air Compressor EQUIPMENT SYS. 9-Installation Industrial Waste Water Treatment Room. 10-Installation Common Pipe Rack Steel Structurers. 11-Installation Condensate Polishing Equipment Shed.

B-Responsible of PR-commissioning of all

1- HRSG Hydrostatic test sys (HP&LP&IP SYS.)

2- HRSG Chemical cleaning of (HP&LP&IP SYS.)

3- Steam blowing

4- Oil flushing of (lube oil & seal oil & Hydraulic oil) sys.

الخبرة

Title: Mechanical site Engineer.2019- till now

Supervision Work to Installation the AL-RUMAILAH COMBINED CYCLE 730

MW POWER

PLANT PROJECT-BASRA With RAZ Company for General Contracting The equipment is provided by Siemens in Germany& TFA SIEMENS & Sin hydro Corporation Ltd –CHINA & KAR Electrical Power Production Trading FZE – OWNER:

a-Responsible of Installation for all:-

1-Installation MAIN POWER BUILDING – STEAM TURBINE GENERATOR

EQUIP. STEAM TURBINE HP/IP & LP & GENERATOR

A-Installation AUXILIARY EQUIPMENT IN STG HOUSE.

B-Installation TURBINE PROPER AUXILIARY EQUIPMENT.

2-Installation Heat Recovery Steam Generation – 5 HRSG UNIT. A-

Installation Feed Water Pump HP & IP & Re Circ. Water. B-Installation Inlet & Outlet Duct & Chimney Stack. 3-Installation CW.PUMP HOUSE & Cooling Tower SYS. 4-Installation Raw Water Treatment SYS.

5-Installation Fire Fighting SYS.

6-Installation Central Control Building EQUIP. 7-Installation Hydrogen Generation SYS.

8-Installation Air Compressor EQUIPMENT SYS. 9-Installation Industrial Waste Water Treatment Room. 10-Installation Common Pipe Rack Steel Structurers. 11-Installation Condensate Polishing Equipment Shed.

B-Responsible of PR-commissioning of all

1- HRSG Hydrostatic test sys (HP&LP&IP SYS.)

2- HRSG Chemical cleaning of (HP&LP&IP SYS.)

3- Steam blowing

4- Oil flushing of (lube oil & seal oil & Hydraulic oil) sys.

التعليم

B.Sc Mechanical Engineering - University of Technology 2000-IRAQ

التقييمات