Project Qa/qc Manager Oil & Gas
Invia una proposta di lavoro direttamente a questo candidato
I am a PQM with more 30 years of experience in oil and gas business in EPC offshore project and the major pat of my career has been spent with Saipem spaof ENI Group Italy
Joining Saipem S.p.A. (Oil & Gas contractor company of ENI group Italy) in 1992 allowed me to have a variety of work experiences abroad in construction projects both offshore and onshore.In 2000 I was Quality System Engineer in Saipem Corporate Head Office in Milan with the responsibility to manage and develop the quality system pertinent to the Offshore Business Unit.This then developed, in the period 2005-2009, into a Project QA/QC Manager role in various offshore EPIC pipelines projects.I concluded my work carrier at Saipem in October 2011 as “Company Quality Manager in Saipem UK in London.
Joining CMT Company (Copenhagen Metro Team) as Project Quality Manager from November 2011 to December 2012 as part of the project team in Copenhagen to design and develop the construction of the city ringen underground of Copenhagen.
Joining in Pipe Team Company from January 2013 to August 2016 (Design, Engineering & Quality Management services) in Milan – Italy as responsible of Quality Management in this company operating in the oil and gas business and mainly dedicated to material & corrosion Engineering activities, Technical evaluation of Suppliers, Assistance to Procurement and Post Order activities, Project QA/QC Management and Manufacturing & Fabrication supervision/inspection activities.
Joining in Bonatti S.p.A. – Italy in September 2016 to cover the position in Greece as Project QA/ QC Manager onshore 48 inches pipeline construction Trans Adriatic Pipeline (TAP Project) total length approx. 370 Km, This activity has been concluded with the full satisfaction of Bonatti and TAP Management at the end of December 2019.
Joining Subsea 7 company – in July 2020 to April 2022 with the role of QA/QC Lead and located in Lamprel Yard in Dubai to manage the fabrication of 30 Jackets of 114 planned in Seagreen Project. The scope is to manage the Subcontractor Lamprell and relevant Suppliers for the fabrication of 30 Jackets and topsides structures to install the WGT (wind turbine generators) in compliance with quality requirements of the project and preparation of the as built documentation for the final transportation and installation of the Jackets in the Nord Sea (offshore Dundee).Relocated in Subsea7 Paris from June to October 2022 with the position of Project Quality Manager for SLGC Project platform installation, hook up and commissioning in Angola .
I have achieved several years of experience in Project Quality Management mainly in oil & gas EPC Projects abroad in different contests and environmental situations as per my CV details.
I point out the following personal characteristics: