Projects
1-The Construction of The Hot Leaching Compaction Plant. (Arab potash company)
[Jan 2023, Current]:
- 11 KV GIS (Installation, Testing and commissioning).
- 11 KV Cables (Laying& Termination).
- MCC's Panels (Installation, Testing and commissioning).
- 11 KV Cables testing (Hi pot, Megger, Continuity).
- Control and instrument cables (Laying& Termination).
- Power Transformers (Installation& Testing and commissioning).
- Shop drawing and as-built for (Cable ladder, conduits, lighting system, Panels).
2-New main brine intake pumping stations (step up and stepdown station). (Arab Potash company).[June 2022,Jan 2023]:
- 66 KV GIS (Installation, Testing and Commissioning).
- MV&LV Cables Laying& Termination.
- Interion and Exterior (Lighting, Power socket, earthing) system installation.
- LV panels installation (MDB, LDB, DC charger, etc...).
- Making necessary manual and software calculations for LV&MV systems.
- As-Built Drawing
- Power Transformers Installation.