Alphonse Modi
Civil Engineer
Hire this person
Send a job offer directly to this candidate
About
Dedicated Civil Engineer with demonstrated expertise in structural engineering, highway (pavement) design, materials testing, and linear infrastructure construction. Proven ability to supervise quality control on major projects, conduct materials testing (concrete cube tests, compaction verification), and coordinate multi-contractor teams across complex construction environments. Seeking to contribute technical expertise and project management skills to road and bridge construction projects, with particular focus on structural integrity, materials quality assurance, and stakeholder coordination.
Experience
Intern – Civil & Structural Engineering Supervision at Kenya Railways Corporation (2024-02 – 2024-04)
Intensive Field Attachment. Main Contractor: China Road and Bridge Corporation (CRBC) | Engineering Consultant: APEC Consultancy. Project: Rehabilitation of Mombasa Island-Miritini MGR Line & Construction of Mombasa MGR Station Complex.
- Supervised construction of 4-storey regional office complex with reinforced concrete frame structure system and pad foundations
- Monitored a 2-storey Mombasa Island station building construction with 50-year architectural design service life and second-level fire resistance rating
- Verified concrete casting operations for structural floor slabs and confirmed frame assembly and load-bearing column installation
- Monitored foundation-to-superstructure connections and ensured compliance with structural specifications
- Supervised subgrade preparation and compaction verification across 2.63 km alignment with ongoing quality assessments
- Directed construction of 3-5 concrete retaining walls (DK9+161.70 to DK9+314) with detailed bearing capacity specifications and verification testing
- Oversaw installation of 6 frame culverts + 2 pipe culverts (8 total drainage structures) across full alignment with documented completion
- Managed drainage ditch construction (3.2 km+) and implemented herringbone slope protection (DK8+196.70 to DK8+500)
- Supervised excavation and blasting operations in cut sections (DK8+200 to DK8+600) to subgrade level with safety compliance
- Coordinated backfilling and compaction works on completed embankment slopes with documented compaction verification results
- Conducted levelling surveys using total station equipment across 2.63 km MGR alignment and established permanent vertical control points
- Performed staff readings and elevation measurements at 20+ critical sections (DK8+200 to DK9+622) to inform design and construction layout
- Verified center line setting out and excavation extents (DK8+200 to DK9+410) with accurate topographical data collection
- Checked back slope ratios before slope protection work implementation and monitored retaining wall positioning (DK9+200)
- Generated site profiles and cross-sectional data from levelling measurements to ensure subgrade and embankment compliance with design specifications
- Maintained survey documentation and benchmark references throughout all construction phases
- Conducted compaction bearing coefficient tests (K30) on subgrade sections (K9+211.7 to K9+270.7) using field testing procedures with documented results
- Supervised concrete cube testing (C40 concrete specification) for structural floor slabs, retaining walls, and drainage structures
- Verified bearing capacity test results for retaining wall pad foundations and ensured compliance with design requirements
- Ensured material specifications and test protocols met CRBC contractor SOPs (Standard Operating Procedures) and quality requirements
- Coordinated work across multiple specialized contractors (CRBC, CCCC, CALE) to ensure specification compliance and schedule adherence
- Participated in stakeholder meetings (April 14, 2024) with Mombasa Women Empowerment Network Hospital and project-affected persons regarding land acquisition and compensation
- Collaborated with APEC Consultancy engineering team on hazard identification and continuous safety protocol implementation
- Communicated identified risks, non-conformances, and work-related hazards to CRBC contractor; tracked corrective action implementation
- Participated in site safety checks and risk assessment meetings across multiple project sections with CRBC and APEC teams
- Coordinated 14-personnel team (84% local workforce, 16% expatriate staff) across concurrent work activities and multiple sections
- Prepared daily work logs and progress reports with detailed chainage references and completed work quantities
- Documented structural work completion: 4-storey office (1883.5 m²), 2-storey station, 6 culverts, 5-6 retaining walls, footbridge
- Maintained material test records (K30 compaction tests, C40 concrete cube tests, bearing capacity tests) per international standards
- Created technical documentation per TB railway engineering standards for compliance verification
- Generated field inspection reports documenting adherence to specifications, quality standards, and industry requirements
- Supervised New Miritini MGR Station (main building, platform, canopy)
- Supervised Mombasa Terminus footbridge with pedestrian safety barriers
- Coordinated concrete sleeper production facility coordination
Engineering Intern at Kenya Pipeline Company (2023-01 – 2023-12)
Participated in drainage construction and civil infrastructure installation. Gained practical understanding of site-level quality control procedures and documentation. Assisted in material inspections and quality assurance activities.
Internal Attachment – Workshop Practice at Technical University of Mombasa (2022-01 – 2022-12)
Practical training in masonry, carpentry, and welding. Developed foundational construction skills applicable to site conditions and field problem-solving.
Education
Bachelor of Science in Civil Engineering – Technical University of Mombasa (2019-01 – 2025-12)
International Computer Driving License in Advanced – Institute of Certified Studies (2019-01 – 2019-12)
Secondary Education in KCSE – Maranda Boys High School (2015-01 – 2018-12)
