May 2016 to Date: Self EmployedPosition: Worked in different roles with different Organizations as below
Responsibilities:
- Safaricom BTS Rollout Project (2017-2019) – AlanDick East Africa LTD/ Oasis Technical/ Altec Africa LTD
- Technical Site Surveys for BTS
- Preparation of site BTS Civil Works, Structural and Electrical Drawings
- Preparation of Final As-Built Drawings
- Safaricom Fiber Project (2018-2019) – Geonet Technologies/ Masaba Services/ Nubly Tech
- FTTS Survey, Planning and Design, HLD and LLD
- FTTB Survey, Planning and Design, HLD and LLD
- FTTH Survey, Planning and Design, HLD and LLD
- Final As-Built Documentation, (AutoCAD, MapInfo and Google Earth)
- American Tower Project BTS and Solar Rollout Project (2019-2021) – Altec East Africa ltd/ Oasis Technical ltd
- Technical Site Surveys for BTS and Solar Power to BTS
- Preparation of site BTS Civil Works, Structural and Electrical Drawings
- Undertake Site civil works and Installations
- Document final completion reports
- As Built Documentation
- Safricom Solar Rollout Project (2021-Date) – Optimax Group ltd/ Delta Energy Systems ltd/ Spectrum Engineering
- Technical Site Surveys for Solar Power to existing BTS
- Carry out power analysis and Power requirements on site
- Preparation of related CAD Drawings and Implementation manuals
- Participate in Actual implementation
Jan 2016 to April 2016 Huawei Technologies South Africa Position: FTTX Planning and Design Engineer
Project: MTN GPON (South Africa)
Responsibilities:
- FTTH High Level (HLD) designs (map info, Google earth and CAD)
- FTTH Low Level (LLD) designs (Map info, CAD, and Google Earth)
- FTTH As-Built Documentation (Map info, CAD, and Google Earth)
- Implementation Time and Recourse Scheduling
- BOQ preparation
- GPON Site Survey
Oct 2013 to Dec 2015 Ericsson Kenya Ltd Position: OSP & ISP Planner
Projects:
- Safaricom Digital City Metro
- Nairobi Safaricom FTTB
- Nairobi Safaricom FTTS
- Safaricom IBS
- NPS Security Project
Responsibilities:
- High level OSP Planning.
- Carry out OSP AND ISP Surveys.
- Preparation of OSP and ISP High Level and Low-Level planning CAD designs.
- Preparation of working Schedules
- Supervise the preparation of designs by sub-contractors.
- Preparation of final As Built Documentation.
- Preparation of BOQs
- OSP and ISP Quality Supervision.
- Site quality checks and acceptance
- Ensuring Adherence to site health and safety regulations.
May - Sept 2013 ZTE South Sudan Position: BTS
Rollout Site Supervisor
Project: MTN BTS Rollout (New Sites Deployment)
Responsibilities:
- Technical Site Surveys
- Preparation of site Civil Works, Structural and Electrical Drawings
- Preparation of BOQs
- Preparation of Site safety manuals
- BTS Site Civil works supervision and preparation of site daily and weekly progress reports.
- Site Quality Checks and acceptance
- Site As-Built Documentation
Jan - April 2013 Self EmployedPosition: Consultant Civil works Implementation supervisor
Project: Multichoice/ Broadband Communications
Responsibilities:
- Supervise civil works on sites.
- Ensure designs specifications are adhered to
- Ensuring site quality standards are adhered to
- Prepare Daily Site Progress Reports.
- Inspect quality of Materials delivered to site.
- Attend site meetings with clients.
May - Sept 2012 Brolaz East Africa Position: Civil Works/ Site Design Engineer
Responsibilities:
- Carry out Safaricom MSV site survey.
- Prepare Site Designs, (planning and Structural working designs).
- Preparation of working schedules
- Prepare bill of quantities and bill of materials.
- Supervision of structural concrete works.
- Supervision of structural steel works.
- Supervision for safe handling and installation of equipment (BTS, Power Back up system and Generators).
- Preparation of As Built Drawings.
- Base Stations Civil Works Site Audits/Inspection and preparation of maintenance Reports
Aug 2010 - April 2012 Elris Communication Services LTD Position: Site Design Engineer
Responsibilities:
Safaricom Rollout Project
- Carry out Safaricom MSV site survey.
- Prepare Site Designs
- Prepare bill of quantities and bill of materials.
- Preparation of working schedules
- Preparation of As Built Drawings.
Orange/ Alcatel Lucent Kenya Rollout Project
- Carry out Safaricom Technical Site surveys.
- Prepare Site Designs and Prepare TSSR
- Prepare bill of quantities and bill of materials.
- Preparation of working schedules
- Preparation of As Built Drawings and Documentation.
Essar Telecom/ Eaton Towers Kenya
- Site Audits
- Prepare Site status reports and recommendations for maintenance
- Prepare Site Build Designs and Documentations
Warid Telecom/ Eaton Towers Uganda
- Site Audits
- Prepare Site status reports and recommendations for maintenance
- Prepare Site Build Designs and Documentations
Jan 2009 - Jul 2010 Comtec Networks LTD Position: Civil Works/ Site Design Engineer
Responsibilities:
Orange/ Alcatel Lucent Uganda Rollout
- Participate in Technical site survey.
- Prepare Site Designs and Prepare TSSR
- Prepare bill of quantities and bill of materials.
- Civil Works Supervision
- Preparation of working schedules
- Preparation of As Built Drawings.
- Base Stations Civil Works Site Audits/Inspection and preparation of maintenance Reports
Yu/ ZTE Kenya Rollout
- Participate in Technical site survey.
- Prepare Site Designs and TSSR
- Prepare bill of quantities and bill of materials.
- Civil Works Supervision
- Preparation of working schedules
- Preparation of As Built Drawings.
Safaricom Rollout Project
- Carry out Safaricom MSV (Multi Skilled Site Visits) survey.
- Prepare Site Designs and Survey Reports
- Prepare bill of quantities and bill of materials.
- Preparation of working schedules
- Preparation of As Built Drawings.
Jan 2008 - Dec 2008 Pentacon LTD Position: Site Design Engineer
Responsibilities:
Orange/ Ericsson New Sites Rollout
- Participate in Technical site survey.
- Prepare Site Designs and TSSR (Technical Site Survey Reports)
- Prepare bill of quantities and bill of materials
- Preparation of As Built Drawings and Documentation
Econet/ Ericsson New Sites Rollout
- Participate in Technical site survey.
- Prepare Site Designs and TSSR (Technical Site Survey Reports)
- Prepare bill of quantities and bill of materials
- Preparation of As Built Drawings and Documentation
Other Positions Held - Dec 2007: Trained and worked with Wright Adams co. LTD in AutoCAD, Prokon, ArchiCAD applications.
- April 2005: Assisting in the construction of Rotik Secondary School.
- Jan - March 2005: Assistant Supervisor in Murram Road Construction Attached with Bomet County council. { Ndanai-Kahawa Road}.