Skip to main content
Peter Onundo

Peter Onundo

AGRICULTURE OFFICER

Talent
NakuruMember since August 14, 2023
AGRICULTURE OFFICERBills of Quantities and material schedules
·

Hire this person

Send a job offer directly to this candidate

AGRICULTURE OFFICERBills of Quantities and material schedules

About

I am a motivated team leader with adverse experience in agriculture education and extension, environmental conservation, and a champion of climate smart agriculture and other functions. I am highly knowledgeable in various agricultural processes which include but are not limited to coordination, monitoring, controlling and evaluating various agriculture and environmental processes and programs with standard evaluative procedures and monitoring techniques. Further, I have top-notch skills in overseeing, implementation and the documentation of any activity within the programs to results and recommendations.

I have a thorough understanding of data collecting and analysis methods to determine prospective effects and project results from various assessment tactics. I am knowledgeable about ethical farming methods that take climate change into account, and creating evaluation techniques to identify the strengths and weaknesses of programs. I have a track record of building and maintaining high-performing teams that consistently provide exceptional services, and strong professional standards and a commitment to completing all jobs promptly and to a high grade.

Experience

Project Manager - RahShaan Constructions LTD

(2026-04)

  • Coordinate construction teams, site engineers and technicians; plan site activities and material requirements; prepare Bills of Quantities and material schedules; monitor costs, progress and workmanship; coordinate client requirements and project handover.

General Technician and Site Supervisor - Wright Trading and General Contractors

(2025-01 - 2026-04)

  • Undertook technical construction and refurbishment works and supervised site teams. Coordinated daily activities, labour and materials, monitored workmanship and supported delivery of building repairs, finishes and installations.

Site Technician - RahShaan Constructions LTD

(2022-09 - 2024-12)

  • Undertook site construction, maintenance and refurbishment activities. Supported setting out, installation works, material handling and coordination with supervisors and other trades.

General Technician and Site Supervisor - Wright Trading and General Contractors

(2024-02 - 2026-01)

From February 2024 to January 2026, I worked as a General Technician and a Site Supervisor at Wright Trading and General Contractors. During the period, I assessed and coordinated sites including but not limited to the information in the table below.

  • Equity Bank Oyugis — Technician: Supervised comprehensive office restructuring and refurbishment. Created two offices, opened the credit area for 10 workstations, expanded the Branch Manager’s office from 16 m² to 25 m², relocation of the mantrap and created a breakout area and its facilities. Coordinated seven additional workstations, aluminum partitions, repair of floor tiles, granite repairs, roof and gutter repairs, acoustic ceilings, painting, installation of window blinds and security gril
  • Equity Bank Litein — Site Supervisor: Assessed and supervised back-office floor rehabilitation, including removing loose tiles, floor screeding and tile replacement. Coordinated roof leak repairs, corporate teller door alignment and hinge replacement, ATM door closer replacement, steel-column and basement painting, teller glass dividers and acoustic ceiling repairs.

Completed

Satisfactorily.

  • Equity Bank Oyugis — Technician: Coordinated phased branch refurbishment involving lowering the corporate teller counter and merging the cubicles, access ramps, mother’s room and breakout facilities, kitchen and cabinet repairs, granite finishes and door hardware. Supervised the construction of gypsum partitions, repair of acoustic ceilings, and extensive paintings on the gypsum walls. Fixing a multilock security door works and making good affected area. Workstation and joinery alterations, soak
  • Equity Bank Keroka — Site Supervisor: Supervised internal restructuring, gypsum wall partitions, floor repairs, painting and emergency exit door installation with associated masonry and lock fitting. Coordinated mother’s room fit-out, cabinets, doors, skimming, tiling, desk assembly, Operations Manager’s desk repairs and shelving repairs.

Completed

Satisfactorily.

  • Equity Bank Iten — Site Supervisor: Coordinated teller-cubicle merging and restructuring. Creation of mother’s room and breakout-area including plumbing works. Replacement of aluminum/MDF-clad partitions with gypsum walls. Installation of four aluminum doors, painting and associated cabinet, flooring and door-alignment works.

Completed

Satisfactorily.

  • Equity Bank Maralal — Technician: Fabricated and installed the ATN aluminum door, removed the existing aluminum door. Decommissioned the existing ATM machine and installed the new ATM machine and make good all the affected areas. Supervised ATM refurbishment involving replacement tiling, worktops and joinery, ATM door alterations, granite finishes and painting. Coordinated server-room door alignment, closer installation and remedial adjustments.

Completed

Satisfactorily.

  • Equity Bank Nandi Hills — Site Supervisor: Assessed and supervised refurbishment of the ATM lobby flooring, including removal of defective tiles, surface preparation, replacement tiling, grouting and cleaning.

Completed

Satisfactorily.

  • Equity Bank Marigat — Technician: Assessed defective partitions and joinery. Coordinated securing of glass partitions and repairs to drawers, kitchen cabinets and doors, with associated branch maintenance.

Completed

Satisfactorily.

  • Equity Bank Kisumu 1 (Main Branch) — Technician: Assessed, measured and coordinated replacement of three glass panels for the teller dividers, including material delivery, installation and sealing.

Completed

Satisfactorily.

  • Equity Bank Kabarnet — Site Supervisor: Coordinated external wall plaster repairs, drainage and pipe works addressing leakage. Repair and realignment of aluminum doors, maintenance and associated making good.

Completed

Satisfactorily.

  • Equity Bank Moi’s Bridge — Technician: Assessed and coordinated door realignment, handle repairs, door closer installation and subsequent joinery maintenance.

Completed

Satisfactorily.

  • Equity Bank Eldoret Archives — Site Supervisor: Coordinated generator housing infrastructure works, including concrete/masonry plinth construction, protective generator cage fabrication, material procurement and technician supervision.

Completed

Satisfactorily.

  • Equity Bank Eldoret 1 — Technician: Handled floor repairs, acoustic ceiling repairs, local repainting, door hardware maintenance, roller blind installation and making good after plumbing works.

Completed

Satisfactorily.

  • Equity Bank Gilgil — Site Supervisor: Assessed and coordinated remedial works to manhole covers, including adjustment, fabrication and installation. Supervised subsequent floor tile repairs.

Completed

Satisfactorily.

  • Equity Bank Bondo — Technician: Fabricated and installed a steel sliding gate, associated demolition, masonry repairs, making good and debris removal.

Completed

Satisfactorily.

  • Equity Bank Kericho — Site Supervisor: Coordinated replacement of defective floor tiles, local repainting, door realignment and subsequent maintenance repairs.

Completed

Satisfactorily.

  • Equity Bank Migori — Site Supervisor: Supervised skimming and repainting of the whole branch. Entrance security grill fabrication and installation. Lock adjustments and mother’s room aluminium door repairs. Coordinated executive desk assembly.

Completed

Satisfactorily.

  • Equity Bank Sondu — Technician: Coordinated teller-cubicle gypsum repairs, permanent sealing of kitchen/store aluminum windows, crack filling in the joinery wall, painting, security grille works and door repairs/realignment.

Completed

Satisfactorily.

  • Equity Bank Awendo — Site Supervisor: Supervised office and corporate-area alterations, aluminium works, painting, acoustic ceiling and grid repairs, water-bottle stand fabrication, ATM and exit door repairs, and joinery improvements. Coordinated cabro removal and trenching supporting electrical works.

Completed

Satisfactorily.

  • Equity Bank Bungoma — Technician: Assessed and coordinated door repairs, replacement of aluminum cylinder ball locks and hardware installation.

Completed

Satisfactorily.

  • Equity Bank Kimilili — Site Supervisor: Removed the steel emergency door and replaced with a multilock door, associated surface repairs, painting and making good.

Completed

Satisfactorily.

  • Equity Bank Eldoret Supreme — Site Supervisor: Built and supervised mother’s room fit-out comprising reinforced gypsum partitions, cabinet/worktop joinery, flooring and decorative finishes, and plumbing works with subsequent maintenance and making good.

Completed

Satisfactorily.

  • Equity Bank Eldoret Market — Site Supervisor: Coordinated mother’s room and staff-facility improvements, gypsum partitions, cabinets, door installation, skimming, painting and reinstatement following plumbing works.

Completed

Satisfactorily.

  • Equity Bank Kisii Main — Technician: Supervised floor repairs within ATM, the branch veranda and sections of the corporate, Branch Manager office and prestige banking areas. Coordinated granite repairs, teller dividers, window locks and alignment, glass replacement, drawers, cabinets, painting and wall repairs.

Completed

Satisfactorily.

  • Equity Bank Kisii Stage Plaza — Technician: Coordinated drawer and runner repairs, teller-divider works and acoustic ceiling refurbishment, including panel replacement and grid repairs around air-conditioning installations. Coordinated granite repairs, teller dividers, window locks and alignment, glass replacement, drawers, cabinets, painting and wall repairs.

Completed

Satisfactorily.

  • Equity Bank Njoro — Site Supervisor: Assessed and supervised gypsum repairs, repainting, replacement of broken and loose glass teller dividers and holders.

Branch

Manager’s door-handle maintenance, roller blind installation and associated minor repairs.

Completed

Satisfactorily.

  • Equity Bank Busia — Technician: Assessed defective and loose floor tiles; coordinated replacement tiling in offices and banking areas, including additional repairs and reinstatement of affected finishes.

Completed

Satisfactorily.

  • Equity Bank Kapsowar — Site Supervisor: Assessed and coordinated mantrap door and closer repairs, remedial adjustments and branch layout/restructuring assessment and drawing work. Removed the steel emergency door and replaced with a multilock door, associated surface repairs, painting and making good.

Completed

Satisfactorily.

  • Equity Bank Mai Mahiu — Technician: Assessed roof leakage and coordinated the repairs which included installing translucent roofing sheet works, waterproofing the leaking walls, painting and reinstatement of affected finishes.

Completed

Satisfactorily.

  • Equity Bank Ol Kalou — Technician: Assessed and coordinated security grill and door improvement works, including fabrication and installation arrangements.

Completed

Satisfactorily.

  • Equity Bank Malaba — Site Supervisor: Undertook assessment and coordinated repainting, waterproofing, plaster repairs and surface reinstatement addressing extensive deterioration.

Completed

Satisfactorily.

  • Equity Bank Siaya — Site Supervisor: Coordinated building a gentler ramp at the entrance of the bank. Replacement of the CDM machine and related finishing, painting, access and lock rectification, and making good of affected areas.

Completed

Satisfactorily.

  • NCBA Bank Busia — Site Supervisor: Assessed and supervised internal repainting of kitchen areas, teller sections, banking hall and mantrap. Coordinated surface preparation, matching grey and white finishes, color rectification and final touch-ups.

Completed

Satisfactorily.

  • NCBA Bank Naivasha — Site Supervisor: Assessed moisture-related paint deterioration and coordinated waterproofing, surface preparation, repainting of approximately 38 m² and associated tile repairs.

Completed

Satisfactorily.

  • KCB Bank Kisumu Advantage — Site Supervisor: Participated in project meetings and follow-up planning; coordinated site personnel and painter mobilization for the Advantage refurbishment project.

Completed

Satisfactorily.

  • KCB Bank Kisumu Advantage — Technician: Coordinated gypsum partitioning works, technician mobilization, material pricing and site meetings. Supported first-floor ceiling material take-offs for an approximately 300 m² area, including studs, channels, screws and sundries.

Completed

Satisfactorily.

  • KCB Bank Menengai — Site Supervisor: Wall repairs: Assessed approximately 98 m² of water-damaged plaster; coordinated hacking and removal of defective plaster, sand and cement procurement, re-plastering and preparation for subsequent painting. Supervised masons and helpers.

Terrazzo assessment: Inspected weak and defective ground-floor terrazzo; assessed the entrance steps and watchman’s office; prepared measurements, repair recommendations and material/labour quotations. Gatehouse waterproofing

  • Standard Chartered Bank Nakuru — Site Supervisor: Electrical repairs involving the replacement of 8 downlights and 3 LED gypsum lights; installation of 2 front security floodlights; repositioning of a rear security light and replacement of its photocell. Coordinated cabling, conduits, materials and access equipment. General maintenance assessment and repairs for the loose reception tiles, a defective entrance-step tile, slippery entrance stairs, back-office door-frame defects, entrance-door lubr
  • Co-operative Bank Rongo — Site Supervisor: Assessed and measured defective tiled areas; sourced replacement tiles and coordinated material requirements. Supervised hacking, tile replacement, adhesive and grout works, including the back office; coordinated cleaning, waste-tile removal and debris disposal.

Completed

Satisfactorily.

  • Co-operative Bank Kisii Main — Site Supervisor: Assessed exterior painting and tile replacement; mobilized a six-person team. Supervised surface preparation, undercoating, exterior and balcony painting, metal/grille finishing, ATM internal-wall and ceiling painting, and tile repairs. Coordinated scaffolding, materials, final cleaning and debris disposal.

Completed

Satisfactorily.

  • Co-operative Bank Offsite ATM Kisii — Site Supervisor: Assessed and coordinated offsite ATM lobby repainting and replacement-tile works under request. Supported material planning, refurbishment supervision, progress photographs and close-out activities.

Completed

Satisfactorily.

  • Co-operative Bank Kisii — Site Supervisor: Assessed and coordinated ATM painting and replacement-tile works under request. Supported material planning, refurbishment supervision, progress photographs and close-out activities.

Completed

Satisfactorily.

  • I&M Bank Kisii — Site Supervisor: Assessed and coordinated the repainting of the entire branch and the replacement of broken tiles in the veranda.

Completed

Satisfactorily.

  • ICEA Lion Nakuru — Technician: Coordinated office maintenance involving drawer locks, curtain rails, drawer runners/sliders, kitchen cabinet repairs, door hardware and a door closer installation, together with lighting repairs. Managed material procurement, technicians and job-card submission.

Completed

Satisfactorily.

  • ICEA Lion Kericho — Site Supervisor: Supervised plumbing and joinery maintenance involving a handwash basin, basin tap and other tap requirements, drawer locks and knobs, door closer and door-hardware requirements. Coordinated plumber, carpenter and helpers; submitted the completed job card.

Completed

Satisfactorily.

  • ICEA Lion Kisii — Site Supervisor: Assessed flickering downlights, failed blue flexible LED lighting and spotlights; coordinated replacement of damaged bulbs and additional reception-light requirements. Assessed locker/shelf-lock defects and a broken washroom-door handle. Identified and oversaw the repair of damaged wiring above the reception ceiling requiring further access and reinstatement work.

Completed

Satisfactorily.

  • BATA Kisumu — Site Supervisor: Floor-tile repairs: Assessed and coordinated replacement-tile sourcing, technicians and work outside trading hours. Supervised removal of existing tiles, re-screeding, replacement tiling and job-card preparation. — tile installation. Coordinated identification, quantification and repair of defective lights, together with photographic assessment of damaged floor tiles.

Completed

Satisfactorily.

  • Sunking Kehancha — Site Supervisor: Supervised skimming, sanding, undercoating and repainting of the reception/main office, stores and approved external walls. Applied specified yellow and grey finishes to doors, louvers and associated surfaces; coordinated final coats, cleaning and before/after photographs.

Reported painting area: 283 m².

Completed

Satisfactorily.

  • Sunking Keroka — Site Supervisor: Supervised façade and internal-surface preparation, skimming, sanding, painting of front-office and store areas, ceiling surfaces and main doors. Coordinated signage removal, photographic records and a follow-up technician visit.

Reported painting area: 456 m², subject to the measurement reconciliation discussed in the chat.

Completed

Satisfactorily.

  • Sunking Litein — Site Supervisor: Coordinated surface-preparation materials, skimming and repainting, technician mobilization, final finishes and before/after photographic records.

Completed

Satisfactorily.

  • Sunking Mau Narok — Site Supervisor: Supervised surface preparation, undercoating and painting of office, store, ceiling, toilet-ceiling and approved external-wall surfaces. Coordinated final wall finishes and steel-door painting.

Completed

Satisfactorily.

  • Equity Bank Mumias — Site Supervisor: Supervised phased refurbishment comprising replacement flooring, branch painting, gypsum partitions, teller glass dividers, glass/aluminium alterations, mantrap door repairs, mother’s room facilities, worktops, cabinets, drawers, ceiling repairs and workstation improvements.

Completed

Satisfactorily.

  • Equity Bank Mbita — Site Supervisor: Supervised phased refurbishment comprising replacement flooring, branch painting, gypsum partitions, teller glass dividers, glass/aluminium alterations, mantrap door repairs, mother’s room facilities, worktops, cabinets, drawers, ceiling repairs and workstation improvements.

Completed

Satisfactorily.

  • Equity Bank Isebania — Site Supervisor: Coordinated branch repainting, surface preparation, waterproofing, mother’s room gypsum patch repairs and water-bottle rack works. Installation of an aluminum cubicle for the CDM machine and its installation.

Completed

Satisfactorily.

  • Equity Bank Sotik — Site Supervisor: Supervised branch repainting, surface preparation, waterproofing, mother’s room improvements, door hardware and closer replacement, floor repairs and finishing touch-ups.

Completed

Satisfactorily.

  • Equity Bank Homabay — Site Supervisor: Coordinated first-floor office refurbishment, gypsum/aluminium partition alterations, acoustic ceiling panels and grids, waterproofing, painting and associated finishing works. Complete removal and replacement of floor tiles at the first floor.

Completed

Satisfactorily.

  • CIB Bank Eldoret — Site Supervisor: Assessed a defective wall and coordinated demolition, reconstruction, making good and branch repainting. Prepared the scope, quantities and quotation and coordinated technical delivery.

Completed

Satisfactorily.

  • CIB Bank Nairobi — Site Supervisor: Assessed and coordinated restructuring involving demolition-related gypsum walling, flooring and ceiling alterations, and repairs to leak-affected ceiling areas.

Completed

Satisfactorily.

  • CIB Bank Nyali — Site Supervisor: Assessed and coordinated the repainting of the branch, replacement of dirty and torn acoustic panels and the realignment of acoustic ceiling metallic grids.

Completed

Satisfactorily.

  • CIB Bank Nkrumah — Site Supervisor: Assessed and coordinated the repainting of the branch, replacement of dirty and torn acoustic panels and the realignment of acoustic ceiling metallic grids.

Completed

Satisfactorily.

Project Manager and Site Supervisor - RahShaan Constructions LTD

(2026-04)

From April 2026 to date, I have been working as the Project Manager and Site Supervisor for RahShaan Constructions LTD. I coordinate assessment, repairs, design and build services, drafting proposals and material estimates, labour and material schedules and coordinated the running sites. Some of my ongoing and successfully completed projects include:

  • CIB Bank Eldoret — Site Supervisor: Assessed a defective wall and coordinated demolition, reconstruction, making good and branch repainting. Prepared the scope, quantities and quotation and coordinated technical delivery.

Completed

Satisfactorily.

  • CIB Bank Nairobi — Site Supervisor: Assessed and coordinated restructuring involving demolition-related gypsum walling, flooring and ceiling alterations, and repairs to leak-affected ceiling areas.

Completed

Satisfactorily.

  • CIB Bank Nyali — Site Supervisor: Assessed and coordinated the repainting of the branch, replacement of dirty and torn acoustic panels and the realignment of acoustic ceiling metallic grids.

Completed

Satisfactorily.

  • CIB Bank Nkrumah — Site Supervisor: Assessed and coordinated the repainting of the branch, replacement of dirty and torn acoustic panels and the realignment of acoustic ceiling metallic grids.

Completed

Satisfactorily.

  • CIB Bank Nairobi — Site Supervisor: Repair of the floor spring and realignment of the entrance door for the Bank.

Completed

Satisfactorily.

  • Kageno School CBO Mbita — Site Supervisor: Managed and executed landscaping and security improvement works at a school, including ground levelling and backfilling, pathway design and setting out, drainage and culvert construction, and establishment of grass cover and tree planting. Installed a water piping system from the lake to the school and fabricated and installed metal security grilles to enhance site security.

Project

Ongoing.

  • Riariote Sacco Offices Ogembo, Kisii — Site Supervisor: Managed and completed the full refurbishment of Riariote Sacco, Ogembo Branch, including roof repairs and replacement of defective iron sheets; installation of gypsum wall partitions and ceilings; and internal and external wall preparation, skimming, sanding, undercoating and repainting. Undertook electrical system repairs, installed CCTV and alarm systems, and fabricated and installed steel sliding and folding doors. Coordinated testing, c
  • Dayspring Pentecostal Church Mbita — Site Supervisor: Managed and completed the pulpit refurbishment at Dayspring Pentecostal Church, including demolition of the existing pulpit finishes, removal of cotton drapes, and installation of a gypsum backdrop and ceiling. Executed skimming, sanding, undercoating and painting, alongside electrical wiring, setting out and installation of downlights and wall bracket lights.

Completed

Satisfactorily.

  • Personal Residence Namba Okana Kisumu — Project Manager: Led the design and construction of a six-bedroom mansion, coordinating the site engineer, technicians and construction teams. Prepared the Bill of Quantities and material schedules for budgeting, procurement and resource planning. Supervised site activities across structural works, masonry, roofing, plumbing, electrical installations and finishes. Managed work sequencing, material deliveries, labour allocation and cost monitoring. Reviewed
  • Personal Residence Rabuor Kisumu — Project Manager: Led the design and construction of a four-bedroom bungalow, coordinating the site engineer, technicians and construction teams. Prepared the Bill of Quantities and material schedules to guide budgeting, procurement and resource allocation. Supervised foundation works, walling, roofing, plumbing, electrical installations and finishes. Planned work sequences, coordinated labour and material deliveries, and monitored project costs and progress. En
  • Personal Residence Sindo Homabay — Project Manager: Led the design and construction of a four-bedroom maisonette in Sindo, coordinating the site engineer, technicians and construction teams. Prepared the Bill of Quantities and material schedules for budgeting, procurement and resource planning. Supervised foundations, structural framing, upper-floor slab construction, masonry, roofing, plumbing, electrical installations and finishes. Coordinated labour, material deliveries and work sequencing wh
  • Christ Gift Academy Mbita — Project Manager: Managing the ongoing construction and fit-out of a Grade 10 science laboratory, coordinating building works and installation of laboratory fittings and accessories. Supervising structural works, roofing, finishes, plumbing, drainage and electrical installations, alongside fitting laboratory benches, worktops, sinks, taps and storage cabinets. Coordinating technicians, labour and material deliveries while monitoring workmanship, costs and progress agai

Education

Master of Science - Project Management - Kabarak University (2026-09)

Bachelor of Science - Egerton University (2021)

Kenya Certificate of Secondary Education - Ramba Secondary School (2014)

Kenya Certificate of Primary Education - Our Lady of Orore (2010)

Skills

AGRICULTURE OFFICER

Reviews