I am telecommunications engineer
أرسل عرض عمل مباشرة لهذا المرشح
I am telecommunications engineer amI leave in kuwait
SHABAKKAT company Saudi Arabia – Jeddah - Rented to Ericsson
I worked as Maintenance Engineering ERICSSON and Front office Access managed service. Till 31 May
2019.
❖ Fo Access
➢ Checking all alarms and minoring site By Cetrix and NSN, NETECO, HUAWEI.
Open TTs Flowing contractors, open MDT, TCN, cutover,
…ex.
➢ Checking all Activity in BCM Remedy to confirm
❖ PMR &CM
➢ We do on a regular basis on the devices to reduce the likelihood of that failure. Preventive maintenance is performed while the equipment is still working, so they do not break down unexpectedly, higher performance reports Trouble shooting
Software. Configuration all Ericsson Equipment
DUG, DUS.DUW, SIU, MW
Hardware.
Checking all indoor & outdoor technology,
replace & swap spare, VSWR, POWER
❖ PAT
➢ Check & test new ore expiation site from roll out to handle over
➢ Conduct audits, including closing out audit findings, creating audits finding reports and determine proper corrective and preventive actions
➢ Checking maps and secure a good future vision before the project is approved
➢ Follow‐up meetings project with Vander & sub-
contractor vision and listen to the instructions provided Vander to the companies and the extent of their understanding contractor Safety discussion situation according to the type environment for the type of wire used in the
Ground.
➢ perfect analyzer for after installation testing and acceptance for all telecom equipment in both software and hardware.
➢ can work with many telecom equipment and measure devices such as (site master , OTDR, E1
Tester).
➢ Carry out on site approval of acceptance processes as per MTN standards
Feb 2010 –
First Link Communication – Khartoum, Sudan:
❖ projects coordinator / Site Engineering:
Modernization Project in Sudan (Project of: Sites Swap and
➢ Swap all old BTS of different venders in several cities is
Sudan to ZTE BTS Modernization all indoor sites to outdoor (Dismantle shelter and AC) to reduce power consumption
➢ MTN , Ericsson 3G (Madani & Portsudan) ▫ Follow up services teams working on field.
➢ Follow up Materials delivery
➢ Installation ZTE equipment ( wireless & transmission ).
➢ Installation and commissioning and testing (TN ,MNLE.
➢ Ericsson , HUAWEI RTN, ZTE Links).
➢ Installation & upgrade all HUAWEI BTS (CDMA, WCDMA &
GSM).
➢ Installation all type of Rectifier & connected all most of power in the site.
➢ Installation BTS APM30 HUAWEI Hybrid power system solution.
➢ swapping from Alcatel to HUAWEI BTS & MW LINK.
➢ swapping from Siemens to HUAWEI BTS &MW LINK.
➢ swapping& Modernization from ERICSSON & Alcatel TO ZTE
(BTS & LINK)
Feb 2011: B.Sc. Degree in Electronic Engineering (Honors)
El Mashreq Collage for Sciences and Technology – Khartoum, Sudan