Alfredo Aguilar
SENIOR PROJECT PLANNER | DATA CENTER CONSTRUCTION | PROJECT CONTROLS
Contratar a esta persona
Envía una oferta de trabajo directamente a este candidato
Sobre mí
Senior EPC/EPCIC Project Planner with 21 years of experience in industrial construction and power generation projects, seeking to transfer established planning and project-controls capabilities to data center construction and critical digital infrastructure. Experienced in Primavera P3 and P6, CPM and CCPM scheduling, progress measurement, and multidisciplinary coordination. Additionally brings 12 years of Information Technology experience, specifically in programming and LAN - WAN network administration.
Experiencia
Senior Planner / Technical Office Manager - Termotécnica Coindustrial México - Valladolid, Yucatán
(2023-10 - 2025-07)
1,020 MW Combined-Cycle Power Plant
- Updated and controlled an integrated Primavera P6 schedule comprising 890 activities for a 1,020 MW combined-cycle power plant, covering civil structures, mechanical works, and process and utility piping.
- Performed critical path analysis, forecasts, short-term planning, physical progress measurement, S-curves, manpower histograms, and change control; planning activities were linked to 238 mechanical equipment items.
- Led a two-person project planning and controls team and supported Document Control and Cost/Estimating teams in documenting additional work and rework.
Head of Planning - Dragados Offshore / Micoperi
(2013-11 - 2015-09)
36-inch Subsea Pipeline
- Reviewed schedule logic, sequencing, and logistics in Primavera P6 for approximately 38 km of 36-inch subsea pipeline and two landfall tie-ins.
- Coordinated the detailed schedule for 1 km of directional drilling with Engineering, Procurement and Construction, contractors, and project management; monitored inspection, cleaning, and preservation activities.
Planning Engineer - Dragados Offshore México
(2005-04 - 2008-02)
PB-KU-A2 Offshore Platform
- Developed and updated the offshore Primavera P3 schedule, comprising 2,545 activities, coordinating planning inputs from a team of approximately four to five people.
- Tracked progress, deviations, man-hours, and material quantities; developed Microsoft Access databases and updated the schedule and weekly and monthly progress reports.
Senior Project Planner - TECHINT
(2021-07 - 2022-11)
Dos Bocas Refinery
- Scheduled and monitored the effluent wastewater treatment module at the Dos Bocas Refinery using Primavera P6; supported acceleration plans and progress reporting.
Senior Project Controls - Sapura Energy
(2018-08 - 2020-08)
MIZTON / HOKCHI Offshore Projects
- Developed and controlled schedules, baselines, S-curves, resources, and progress for the MIZTON and HOKCHI offshore projects; supported recovery schedules and pre-commissioning.
Planner - BASF México
(2017-09 - 2018-08)
Chemical Plant Expansion
- Updated the EPCIC schedule for a chemical plant expansion and monitored contractor performance and commissioning activities.
Planning Engineer - Avanzia
(2015-10 - 2017-08)
450 MW Power Generation Plant
- Planned a 450 MW power generation project, including EPC schedules, critical path analysis, progress tracking, forecasts, subcontractor monitoring, and support for monthly estimates.
Master Planner - McDermott
(2012-10 - 2013-11)
Mafumeira Project
- Planned project milestones and resources for the Mafumeira EPC project; monitored critical materials, man-hours, and schedule risks.
Planning Engineer - SPISA / Saipem
(2010-04 - 2012-10)
Tula and Salamanca Refinery Projects
- Prepared contractual schedules and monitored procurement, construction, additional work, and scope changes.
Project Controls and IT - Alexandres y Asociados / Holcim Cement Industry
(2002 - 2005)
IT Management - Grupo Obras Portuarias / Ballast Nedam
(1998 - 2002)
Combined-Cycle Power Plant project
LAN & WAN Network Administration - Rheem Industries
(1994 - 1998)
ERP Front-End Programming - Consultores en Informática Empresarial
(1992 - 1994)
Educación
B.S. - Computer Systems Engineering (Ingeniería en Sistemas Computacionales) (1988 - 1993)