Jose Verdugo
Ingeniero
Talento
El Naranjo, EnsenadaMiembro desde 7 de enero de 2025
·
Contratar a esta persona
Envía una oferta de trabajo directamente a este candidato
Sobre mí
Ingeniero con 8 años de experiencia, dirigiendo proyectos de mejora de calidad, reducción de costos y control de procesos, comprometido con los resultados, el éxito del negocio y los objetivos de la organización, el aprendizaje y la ciencia, siempre abierto al diálogo y al intercambio de ideas y conocimientos, generador de acuerdos y mentor de ingenieros.
Experiencia
2022 – 2025 Sr. Manufacturing engineer | 3Day Blinds - Ensenada.
Raw material optimization engineer
- Administration and execution of raw material optimization projects: Savings of $1,081,349 dlls on fabric for blinds during the 2023-2024 period.
- Management and execution of initiatives to reduce internal and external rejections. - Reduction of internal rejections from 2.65% to .70%
- Change agent in the development of problem-solving methodologies and the use of statistical tools.
- Nominated for Employee of the Year 2023
- Direct the team towards the fulfillment of goals and objectives, Control and Improvement of Productivity, Metrics FPY & %SCRAP
- Assurance of functionality, preventive and corrective maintenance of automatic and manual booths for the application of powder paint on cold rolled metal parts - Conveyor, ovens and curing processes
- Responsible for the area of Painting Re-certification ISO 9001 – 2022
- Direction of engineering activities
- Control and improvement of Quality and Productivity, Development of cost reduction projects
Finish Good Engineer – Paint – Sanding & Polish.
- 60% reduction in quality defects, generating approximately $ 500,000 in annual savings. (burns, texture, poly run, delamination, contamination)
- 2 years in charge of the Administration and direction of the engineering department in paint area.
- 2023-2024 3DayBlinds Reduction of fabric scrap from the area Roller Shades from 34.5% to 27.9%.
- 2023-2024 3DayBlinds Reduction of fabric scrap from the area Honeycomb shades from 23.7% to 18.9%
- 2022 Broan Nutone Increase and control of the FYP in the painting area, from 70% to 90%.
- 2021 Prime Wheel Consumption control and reduction of sandpaper and orbital.
- 2021 Prime Wheel Implementation of the quality management system- Control of the criticalvariables of the process.
- 2020 Fender Optimization Texture and gel time performance - Top coat Polyester pigmentado material
- 2018 Fender Optimization Thicknessperformance - Topcoat lacquer and urethane Material.
Educación
2024 | Tecnologico de Monterrey Professional project management Diploma
2018-2019 | CETYS University Lean Six sigma Black Belt Diploma ASQ Certification No. 21461

