Process validation of fixtures and equipment’s IQ, OQ, PQ, PPQ within clean room.
- Test method validation (TMV) in conjunction with quality team.
- Validation of Process Relocation.
- Generation and update of MPS (Manufacturing procedure sheet) under ECOs.
- Engineering changes under ECOs.
- Sustaining Engineer.
- Savings project planning and development.
- Presentation to management scrap and efficiency metrics (TIER III).
- Generation and follow-up of actions to maintain production metrics within the specified goal.
- Continuous improvement projects (Efficiency) and Scrap reduction projects.
- Update BOMs.
- Project presentation to staff (cost reduction and savings).
- Key team player in workshop for process documentation reduction (Forms).
- CAPA leader (RCA tools) • Follow-up and closure of NC, QN, NCR actions under methodology of brainstorming, RCA, 5 Whys, Ishikawa, 8Ds, A3, Etc.
- Follow-up of actions with the engineering team (Projects and sustaining activities)