SENIOR DESIGN ENGINEER AT LAUNCH at NYX MÉXICO PLASTICS (2024-11 – Present)
- In charge of fabric components for upholstery usage continuous improvement
- Saving improvements for USA plant at Levan
- Continuous support on design + cut process solutions for USA plant
- Periodically improvement savings reporting
- Usage configuration for fabric and vynil components
- In charge of ensuring fabric and vynil components usage efficiency
- Automotive upholstery design and development
- Feasibility for mass production studies performance
- Feedback for DFMEA development
- Dimensional variances analysis on plastic molded parts
- Collaboration on product specification development
- Collaboration on product line quotation
DESIGN ENGINEER AT LAUNCH at NYX MÉXICO PLASTICS (2019-12 – 2024-11)
- Launch participation on Honda interior parts project HR-V
- Automotive upholstery design and development
- New components development
- Feasibility for mass production studies performance
- Feedback for DFMA development
- Dimensional variances analysis on plastic molded parts
- Sequence operation development
- Collaboration on product specification development
- Collaboration on product line quotation
- Improvement and saving proposal, validation and implementation
- Active participation on internal audit, as certified IATF 16949 auditor
TECHNICAL PRODUCT MANAGEMENT ENGINEER at DRÄXLMAIER COMPONENTS AUTOMOTIVE SLE (2018-11 – 2019-12)
- Responsible for repair harness foamboards changes and immediate requirements
- Customer engineering changes implementation
- Support on Lagos de Moreno plant
- Create and update on 1:1 drawings used for harnesses production and based on client drawings, databases and BOMs
- Manufacturing stages analysis for electric harnesses components assembly
- Recognize potential improvement on production process that directly affects the product
- Production problem solving, related to 1:1 drawings based on ergonomic and technical characteristics
- Quality support on product line, performing root cause analysis by using fast problem solving method
INTERN AT PRODUCT ENGINEERING & CONFIGURATION at CUMMINS FILTRATION PLANT (2018-02 – 2018-08)
Leadership of 4 main projects:
- Validation for roller tooling on line 23 (small spin on, the biggest volume producer on filtration plant), which required to develop prototypes for two hydraulic filter models, as well as the request and tracking of performance tests
- Job data sheet, focused on the correct information moving and product specifications data management, in which the achievement was to set the base of how information format must be
- ECQ project, main approach was set as well as the process to obsolete around 600 saleable part numbers
- Printing plates and silk screens, focused on data correction for offset printing plates and silk screens drawings, used on the printed art process for finished filters
- Support on adhesive validation for air production lines
- Support on manufacturing process, product specification sheets update
INTERN AT PRODUCT ENGINEERING AND DESIGN at ONNERA GROUP (2017-08 – 2017-12)
- Prototypes re-design
- Elaboration of sample pieces validations
- Elaboration and tracking of purchasing orders requirements
- Document translation
- Elaboration and tracking of modified equipment assembled on production line
- Direct deal with production staff
- Support on prototypes assembly
- Solutions to engineering requirements were provided
- Render elaboration
- Modifications and improvements for FST 48 D4 prototype taken to USA for mass production
- Prototypes development for low refrigerated bases ACBR
- Realization of ASBER and Fagor drawers for low refrigerated bases
- Realization of diverse 3D model
- Constant support on fridge tables production line