Arif Farhan
Electrical Project Manager
Sewa orang ini
Hantar tawaran kerja terus kepada calon ini
Tentang
An accomplished and dedicated Electrical Project Manager with over 13 years of experience delivering complex electrical installations across high-voltage (HV) and low-voltage (LV) systems. Proven track record of successfully managing projects for megastructures, including MRT underground tunnels, gas plants, factories, and commercial healthcare facilities. Adept at leading cross-functional teams, managing subcontractor claims, and delivering fast-track projects up to 33kV within strict timelines and approved budgets.
Highly motivated to leverage strong project management and high-voltage technical experience to transition into utility-scale 132/275kV systems.
Pengalaman
Electrical Project Manager - Carpeton Industries Sdn Bhd - Kuala Lumpur
(2022-12)
Project: Sunway Medical Center, Ipoh (Scope: Electrical services from incoming TNB 11kV infrastructure up to final sub-circuits).
- Lead overall project execution as Project Manager, overseeing budgeting, material planning, and developing work programs.
- Establish structural project tools, including monthly management dashboards and organization charts, to track deliverables.
- Manage engineering teams by defining tasks and deadlines to ensure all site documentation (drawings, material approvals, Method Statements) complies with client specifications.
- Chair weekly site progress and coordination meetings; systematically record site delays and handover dates to mitigate risks and prepare Extension of Time (EOT) documentation if necessary.
Head of Electrical Project Management / Project Manager - Carpeton Industries Sdn Bhd - Kuala Lumpur
(2020-02 - 2022-12)
Projects: MRT Line 2 TTWS Station & Underground Tunnel, Kuala Lumpur (Scope: Electrical & Mechanical services for a 24km tunnel, including tunnel lighting, line heat detection, wet riser systems, and cabling bracketing work).
- Successfully achieved early handover to the client despite a 3-month mandatory site shutdown due to the COVID-19 pandemic.
- Optimized project timelines by revising existing work programs and reallocating manpower and subcontractor resources to eliminate progress bottlenecks.
- Formulated micro-work programs to align execution with the client's targeted milestones.
- Issued site instructions and official memos to suppliers and subcontractors to strictly control and monitor additional work scopes.
- Evaluated and verified subcontractor monthly claims while preparing accurate company claims for client billing.
Assistant Project Manager - Carpeton Industries Sdn Bhd - Johor
(2019-01 - 2019-07)
Project 1: Rapid Petronas, Pengerang, Johor (Scope: 11kV switchgear relocation from existing to new SSU, including 2 RMUs for temporary plant power supply, pulling/jointing new cables, and testing/commissioning). Project 2: Linde Malaysia, Pasir Gudang, Johor (Scope: Installation of HV 33kV system for an extended gas plant, including 33kV switchgear, transformers, cables to 11kV motors, and NER testing/commissioning).
- Successfully executed and completed both high-stakes projects within the required factory shutdown windows with zero disruption to continuous plant operations.
- Delivered both projects within the approved budget, maintaining company profit margins through stringent cost control.
- Prepared critical submission documentation, including material technical specifications, shop drawings, and specialized Method of Statements for high-voltage works.
- Managed project budgeting and fed procurement data to the contracts and commercial departments to streamline material delivery.
Senior Project Engineer - Carpeton Industries Sdn Bhd - Malaysia
(2013-05 - 2018-12)
Managed multiple electrical projects across various industries and scales.
- Gamuda IBS 2, Banting (Jan 2018 – Dec 2018): Managed M&E installations for 2 factories, a 2-story office, worker homestays, and a stockyard. Delivered the project successfully alongside 1 junior engineer.
- Linde Malaysia (Freescale), Petaling Jaya (Sept 2017 – Dec 2017): HV 11kV electrical system installation to supply an 11kV motor for a gas plant expansion.
- Renesas, Teluk Panglima Garang (Feb 2016 – Oct 2016): Cabling work for an 11kV electrical system involving 2 new RMUs.
- AEON, Kempas, Johor Bahru (Jan 2015 – Nov 2015): Installation of 33kV system for a new shopping complex, including relay coordination settings on switchgear and Main Switchboards (MSB).
- MRT Depot, Sungai Buloh (Jun 2013 – Dec 2014)
- AEON, Kulaijaya, Johor Bahru (May 2013 – Oct 2013)
- Sewerage Treatment Plant, Klang (Jan 2013 – Dec 2013)
Pendidikan
Master Degree - Electrical Engineering (Power) - Universiti Teknologi Malaysia (UTM)
Bachelor's Degree - Electrical Engineering (Power) - Universiti Teknologi Malaysia (UTM)