Badri Bin Hassan
MANAGER (INDUSTRIAL ENGINEERING)
Sewa orang ini
Hantar tawaran kerja terus kepada calon ini
Tentang
Manages to cover 2 plants which is KWPE, Prai (PG1) and KWPE, Batu Kawan (PG2) Develop new Plant Layout with detailed configurations starting from Incoming Warehouse, Production & until Outgoing Warehouse by using AutoCAD software tools Responsible for Plant re-layout with Continual improvement, Efficiency and Optimization of processes
Pengalaman
MANAGER (INDUSTRIAL ENGINEERING) - KW PRECISION ENGINEERING SDN BHD - 2717, LORONG PERUSAHAAN 6B, PRAI INDUSTRIAL ESTATE, 13600 PRAI, PENANG
(2024-07 - 2026-02)
- Manages to cover 2 plants which is KWPE, Prai (PG1) and KWPE, Batu Kawan (PG2)
- Develop new Plant Layout with detailed configurations starting from Incoming Warehouse, Production & until Outgoing Warehouse by using AutoCAD software tools
- Responsible for Plant re-layout with Continual improvement, Efficiency and Optimization of processes
- Responsible for Proposal layout, new line set up, Time study, Production Line utilization, Capacity, Manpower Headcount analysis, etc
- Improvements activities & Kaizen with Statistical Tools such as Value Stream Mapping (VSM)/ Value Stream Design (VSD) in Lean Manufacturing Engineering
- Cost saving/reduction with high-capacity production line
- PG2 plant New Line Layout & Set-up for Control Room UHP CNC Bending Line with area 46.87m2 for Applied Materials (AMAT) customer products
- PG2 plant New Line Layout & Set-up for Clean Room C100 UHP Welding Line 8 stations with area 246.91m2 for Applied Materials (AMAT) customer products
- PG2 plant New Line Layout & Set-up for UHP Packaging with area 20.78m2 for Applied Materials (AMAT) customer products
- PG2 plant Re-layout consolidates the main office for all staff. Space saving was 239.20m2
- PG2 New Prod. CNC, Tool Room & Tool Workshop with area 488.20m2
- PG2 Warehouse relayout with area 423.17m2
- PG1 Resolved BOMBA, DOSH, and DOE audit through the new establishment of properly designated 8 locations area that comply with the relevant regulatory requirements and guidelines
MANAGER (INDUSTRIAL ENGINEERING) - INOKOM CORPORATION SDN BHD (Sime Darby Motor) - LOT 38, MUKIM PADANG MEHA, 09400 PADANG SERAI, KULIM, KEDAH DARUL AMAN
(2022-12 - 2024-06)
- Manages a team of engineers & technicians to establish work measurement programs/studies to develop standards for resources utilization and ensuring efficiency through all phases of production
- Optimize processes, systems, or organizations by developing, improving, and implementing integrated systems of people, money, knowledge, information, and equipment
- Designing production layout by applying AutoCad and processes that increase productivity, eliminate wastefulness, and reduce cost while maintaining quality standards
- Cycle time studies, line layout and process methodology to ensure the efficiency
- Analyse, and visualization of production systems parameters (Cycle time, utilization, change-over, lead types versions of each product) with efficiency
- Analyse the planning and implementing activities for process/product in order to reduce manufacturing costs
- Responsible of reporting improvements systematically and continuously as well as Kaizen cost reduction implementation
- MTM analyses (method of measuring time)
- Define and monitor the KPIs
- Support to establish business plan figures
- Involve in cost reduction projects
- MPlan HC (headcount) budget planning
- CAPEX & OPEX planning
- Line and machine capacity planning with workforce
ASSISTANT MANAGER / STAFF ENGINEER (INDUSTRIAL ENGINEERING) - CONTINENTAL AUTOMOTIVE COMPONENTS MALAYSIA SDN BHD - 2455, MK 1, TINGKAT PERUSHAAN 2A, PRAI INDUSTRIAL ESTATE, 13600 PRAI, PENANG
(2011-05 - 2020-07)
- Plant Layout, Plant Transformation Project & Floor Space Calculation & Reporting by applying Microsoft AutoCAD and VisTABLE touch tools
- Plant Strategy Project
- Production floor utilization and Line Layout improvement with flow optimization
- Predetermines Standard Time, Line Balancing, Process Cycle Time improvement with work content analysis
- Improvement activities with Statistical Tools and Value Stream Mapping (VSM) in Lean Manufacturing Engineering
- Assembly Technology, Processes and Method Time Study and Pre-Production cost calculation
- Production and quality activities with 5S awareness
- SAP system (Production Routing & Time Study)
- Production Capacity Planning (PCP) Implementation
- RFQ (Request for Quotation)
- Kaizen and etc
- Certified (Employee Lean Certificate) – Result: ELC (Silver)
- Certified (Employee Lean Certificate) – Result: ELC (Bronze)
- Plant Strategy Project - PCP (Production Capacity Planning) Implementation. Result: Implemented In-plant specific tool for Production Capacity Planning by using SAP system. Fully utilized on 25th May 2018
- Plant Strategy Project - Low Volume line and OES Consolidation line for space saving. Result: Achieved 516.28m2 free space @ (RM229,335.09) on Dec 2017
- Plant Strategy Project – Plant Relayout (Construction). Result: Manage to complete new building Warehouse & R&D extension, Multi-Level Car Park and Building 5 (Connection) as targeted by end of 2018
- Plant Strategy Project – Plant Transformation Project. Result: Completed relocate and relayout all affected lines to new building 5 (Connection), new Warehouse (Electronic) and R & D Office, Lab, Facilities, etc
MANUFACTURING / PRODUCT ENGINEER - EATON ELECTRIC SWITCHGEAR SDN BHD (Formerly known as Delta Switchgear Sdn Bhd) - 2413, LORONG PERUSAHAAN 10, PRAI INDUSTRIAL ESTATE, 13600 PRAI, SEBERANG PERAI (U), PENANG
(2004-06 - 2009-05)
- Involved in area of Metal Stamping, Welding, Painting, Plastic Moulding, Metal Enclosures Assembly, Small Devices Assembly, Components & Parts Assembly, etc
- Design Distribution Board, Consumer Unit, Panel Board, etc, and plan economic production processes for the manufacture of products
- Provide engineering support in all areas of technical aspects such as, Drawings, GAD, New Items (parts), Costing, Quotation, etc
- Internal and external product audits
- Provide test samples for Certification such as SIRIM, KEMA, etc
- Handling project to provide samples to customers as requested to fulfill all their requirements
- Understand and anticipate customer needs and liaise with Sale/Marketing personnel to develop suitable products
- Oracle system (BOM). Implementation of Enterprise Common Platform (ECP) Project
- Lean Manufacturing
- Solve all customer complaint issues
- Process Cycle Time, Routing & Ergonomic improvements & MM System
- Provide Engineering & Technical to manufacturing in developing new process
- Continues improvement to process optimize yield, quality, productivity and cost
- Work study activities and optimize the efficiency of production
- Sustain/Support activities and documentation in new process developments and continues improvement through innovations
- Assist in updating and upgrading the manufacturing process and technology to keep ahead
- Enterprise Common Platform (ECP) project - Oracle Implementation. Result: Successful implementation of ECP project which is transition from old MM System to new Oracle System in July 2007
- Lean Manufacturing – Standardization Work (SW) Result: New implementation of Lean Manufacturing in Penang Plant and take part as tool champion of Standardization Work (SW)
PROCESS ENGINEER - FLEXTRONICS TECHNOLOGY (M) SDN BHD (Formerly known as Xerox Corporation (Penang) Sdn Bhd) - 1088 MK6, TINGKAT PERUSAHAAN PRAI IV, 13600 PRAI, PENANG, MALAYSIA
(2000-06 - 2004-05)
- Process, Product, Industrial Engineering (I.E)
- Projects
- New Product Transfer
- ISO14000, ISO 9001
- Bill of Material (BOM)
- Process flow & Work Instruction
- Process of Standard Time & Line Balancing
- Prod. Line Support & Product Defect Analysis
- SPC, FMEA & TPM Project
- Kaizen activities & Others, etc
- ISO14000 Certification – Contribution as member of ISO14000. Result: Achieved ISO14000 Certificate
- ISO14000 – Internal Auditor. Result: Officially appointed as Internal Environmental Auditor as dated effective 01st August 2002
- ISO9000 - Internal Auditor. Result: Officially
- Beyonics Relocation Project - Contribution as member of Project. Result: The machines was successfully relocated to actual location
- IPC-A-610 – Certificate of Acceptability of Electronic Assemblies. Result: Successfully completed the Worker Proficiency Training Course on 27th February 2003
MANUFACTURING ENGINEER - TIM ELECTRONICS SDN. BHD. - PLOT 111A, BAYAN LEPAS INDUSTRIAL ESTATE, 11900 PENANG, MALAYSIA
(1996-10 - 2000-06)
- Process
- Product
- Industrial Engineering (I.E)
- Production Line / Sub-Assembly Layout
- MOST, MTM
- Production Time Study & Line Balancing
- New Product Transfer
- Bill of Material (BOM)
- AS400 System
- Manufacturing Instruction (MI)
- Bar Code Printing
- Sub Material study & control
- SPC & FMEA
- Lead training as product transfer to production
- Quality Improvement Activities
- Projects
- Others, etc
- Turnkey 1 project (06rd February 1999) – Result: Quality Improvement Team Competition (Improvement activities)
- New Product Transfer (October 1998) – Result: AQ4/5 Model Facsimile machine
- New Product Transfer (March 2000) – Result: Developer for Facsimile machine
ENGINEERING ASSISTANT - PERNAS NEC (KEDAH) SDN. BHD. - LOT 9, TIKAM BATU IND. ESTATE, P.O. BOX 21, 08007 SUNGAI PETANI, KEDAH DARULAMAN, MALAYSIA
(1992-08 - 1994-08)
- Engineering Project for Network Systems
- Local Content Projects
- Installing Telecommunication Equipments
- Dealing with Suppliers about Parts
- Evaluation of Suppliers and Parts
- Supervise Engineering Technicians
TECHNICIAN - MOTOROLA MALAYSIA SDN. BHD. - BAYAN LEPAS FREE TRADE ZONE (FTZ), PENANG, MALAYSIA
(1991-05 - 1992-07)
- Set up Machines
- Calibrate Machines
- Repairing Machines
- Preventive Maintenance (PM)
- Modification Project for Machines
- Supervise Machines
Pendidikan
SIJIL PELAJARAN MALAYSIA – SPM - DATUK HJ. AHMAD BADAWI SECONDARY SCHOOL (1980 - 1984)
Diploma - MECHANICAL ENGINEERING - SULTAN ABDUL HALIM POLYTECHNIC (1988 - 1990)
BTEC IN MECHANICAL & MANUFACTURING ENGINEERING - MECHANICAL & MANUFACTURING ENGINEERING - SWINDON COLLEGE (1994 - 1996)