Piping Engineer / Steel Structure/Piping Engineer / Construction Site Engineer / Supervisor / QAQC - Equator Engineering Sdn Bhd - Bintulu Sarawak, Malaysia
(2023-01 - 2026-03)
Worked on multiple projects including Rosmari Marjoram SHELL OGP Project and Sarawak Petchem Methanol Project.
- Liaising and coordinating work activities with other discipline engineers or vendors
- Advising on quality control procedures, methods and practices/actions
- Implement the Field Quality Control Plan/Procedures and construction specification for construction activities
- To resolve or facilitate any arise matter/conflict/issue in the project
- To complete on time and meet up with all the requirements with cost effective in the project
- Supervise erection of pipe spools and pipe supports as per latest issued construction drawing
- Monitoring and supervising the contractor to ensure that project engineering standards are applied and adhered to by reviewing the technical specification
- Provide engineering support to the site supervision team during installation, commissioning and start-up
- Ensures all activities are completed in accordance with company approved standards and procedures, local regulatory authority requirements, classification society and flag state requirements
- Completion of all applicable QA/QC and all other applicable documentation relating to closeout and completion specifically for the mechanical & piping engineering input required of the management of change or project work activities inclusive of Specifications and Standards
Piping Supervisor - Sapura Energy Berhad - Lumut, Perak
(2021-08 - 2022-09)
EPCC FOR FULL FIELD DEVELOPMENT (FFD) PHASE 4A FACILITIES NORTH MALAY BASIN (NMB) in Lumut Perak.
- Responsible to check the compliance with rules & procedures in force to the project
- Provide piping expertise to the Project from Detailed Engineering, Procurement, Installation & Commissioning phases including tendering exercise
- Oversee all piping and mechanical equipment works at site
- Assist site construction team for liaison with home office engineering support teams for piping technical issues
- Monitoring and supervising the contractor to ensure that project engineering standards are applied and adhered to by reviewing the technical specification
- Provide engineering support to the site supervision team during installation, commissioning and start-up
- Ensures all activities are completed in accordance with company approved standards and procedures, local regulatory authority requirements, classification society and flag state requirements
- Completion of all applicable QA/QC and all other applicable documentation relating to closeout and completion specifically for the mechanical & piping engineering input required of the management of change or project work activities inclusive of Specifications and Standards
- Liaising and coordinating work activities with other discipline engineers or vendors to achieve deadlines and target objectives as required for the operations team
- Advising on quality control procedures, methods and practices/actions
- Implement the Field Quality Control Plan/Procedures and construction specification for construction activities
- Conformity check during erection and installation of piping against Isometric drawing, P&ID and GA drawings
- To ensure that all site activities are performed in environmentally safe and responsible manner
- To perform punch listing at the relevant stage of completion and follow up clearance by subcontractor prior commencing of the hydrotest/pneumatic test. Witness the Hydrotest/Pneumatic test
- Ensure prepare and submit require report on time
- Attend final walkthrough of completed piping systems and verify clearing of all punch list prior to mechanical completion
- Reinstatement of piping activities with reference of test package. Preservation of pipe and close out check list after completion
Commissioning Site Supervisor - CTCI Engineering & Construction Sdn Bhd - Pasir Gudang, Johor
(2019-12 - 2021-05)
Track 4A 1440MW CCGT Power Plant Project in Pasir Gudang, Johor Malaysia.
- Plan, manage and ensure smooth implementation and monitor of projects assigned from inception to completion on time and of desired quality
- Pre-commissioning main activities, water flushing, diesel oil flushing, air/steam blowing, leak test, flushing lube oil system, operational test run of pumps
- Ensure standards and requirements are met through conducting quality assurance tests
- Responsible for organizing, assigning and supervising pre-commissioning activities such as installation, fabrication, modification, rectifying, inspection, cleaning/housekeeping etc. performed by commissioning team members as well as subcontractor and vendors
- Responsible for commissioning packages and operation such as: fire protection system-jokey pump, electric pump and diesel engine driven fire pump, water treatment plant, demineralized water system, service water system, waste water transfer systems, submersible pumps, diesel oil unloading & forwarding system, cooling closed water system for GTG and STG condenser, hot well tube cleaning system
- Responsible for permit application, safety matters, daily control, record and monitoring of plant operation
- Participate with client organization to obtain final acceptance of ready for start-up from local authorities
Quality Technician - Chep Pallecon Solutions - Melbourne, Australia
(2017-12 - 2019-11)
- Developing and maintaining company inspection reports
- Inspecting products according to quality and safety standards
- Ensuring products comply with company standard
- Reporting quality anomalies to the supervisor and arrange to send for repair accordingly
Inspection/Quality Control and Site Coordinator (NDT and Painting works) - Carbon Energy Inspection Sdn Bhd - Pasir Gudang, Johor and Bintulu, Sarawak
(2013-12 - 2017-12)
Flare Turn Around - Lotte Chemical Titan, Pasir Gudang, Johor. Site Coordinator (NDT and Painting works) June – July 2017.
- To perform NDT inspection and painting works on flare stack
- Liaise with clients to identify and define requirements, scope and objectives
- Assign tasks to internal teams - NDT inspectors and rope access team for painting works and assist with schedule management
- Analyze risks and opportunities
- Monitor project progress and handle any issues that arise
- Act as the point of contact and communicate project status to all participants
NDT Technician/Inspector/Coordinator and Site Supervisor (NDT) - Multiple Operators - SHELL, Petronas, Tokuyama, etc. - Bintulu, Sarawak and Brunei Darussalam
(2013-12 - 2017-03)
SHELL MDS Maintenance Project, Bintulu Sarawak. Train 9 Project Petronas MLNG, Bintulu Sarawak. Cogen 2 Project, LNG, Brunei Darussalam. Sarawak Hydro Bakun Dam. Plant shutdown – Tokuyama (M) SB, Samalaju, Bintulu, Sarawak.
- Conducting material tests using a variety of non-destructive methods such as dye penetrant testing, magnetic particle testing, ultrasonic test/thickness gauge and radiography test to identify material flaws including hardness test, PMI and borescope inspection
- Interpret and analyze test results to assess materials
- Ensure the accuracy of test results and prevent damage to materials by properly calibrating and maintaining equipment
- Examines equipment settings prior to conducting tests and adjusts settings depending on the type of material being tested
- Planning of NDT activities
- Verification of NDT documentation
- Co-ordination of NDT verifications / qualifications
- Co-ordination of inspection activities
- Supervising and instructing NDT inspection team
- Educating site workers on safety regulations and accident protocol
- Inspecting sites regularly to identify and eliminate potential safety hazards
- Operate inspection machinery and tools such as upgraded boroscope with wheels
- Ensure the quality and cleanliness of internal piping according to quality specification/client's requirements
- Act as a specialist for piping internal cleanliness
- Responsible for permit application
- To perform NDT inspection such as dye penetrant test and magnetic particle test on all turbine blades and borescope inspection on rotating equipment such as rotor
- Preparation of close out reports
- Interact and coordinate with client's representative personnel regarding daily activities and inspection reports
- To conduct visual inspection and witness third party NDT inspection being performed on behalf of client
- Monitor and coordinate all NDT related activities on the project
- Attend client's quality management meetings and contribute ideas and solutions on NDT related issues
- Controls all achieve documentation upon the completion of the project
Site Supervisor (Mech/Piping) - Multiple Operators - Samalaju, Bintulu, Sarawak
(2014-11 - 2014-12)
Tokuyama Plant Shutdown, Samalaju Sarawak.
- Supervise a team of welders, skilled and semi-skilled workers on site carrying out installation of pipe, commissioning & testing in accordance with established schedules & procedures to ensure they are operating safely and meets company standards
- In charge of coordinating all works related to equipment and pipe material delivery and unloading and storage area
- Responsible for permit application