Senior Technician (Painting & Insulation) - Brunei Rotary Engineering Sdn Bhd - Brunei
(2025-04)
Project: Maintenance Department (Workshop). Client: Brunei Fertilizer Industry (BFI), Brunei.
- Responsible for the daily execution of Work Order for painting and insulation work.
- Prepare and apply Permit to Work (PTW) for daily work execution.
- Plan and troubleshoot any problems that arise during work execution.
- Ensure that the work is executed in accordance with BFI specifications.
- Supervise and consult on both painting and insulation work.
- Ensure that high safety standards are met.
Senior Technician (Painting & Insulation) - Brunei Fertilizer Industrial Sdn Bhd - Brunei
(2021-12 - 2025-03)
Project: Maintenance Department (Workshop). Client: Brunei Fertilizer Industry (BFI), Brunei.
- Responsible for the daily execution of Work Order for painting and insulation work.
- Prepare and apply Permit to Work (PTW) for daily work execution.
- Plan and troubleshoot any problems that arise during work execution.
- Ensure that the work is executed in accordance with BFI specifications.
- Supervise and consult on both painting and insulation work.
- Ensure that high safety standards are met.
Lead Site Supervisor (Painting & Insulation) - Thyssenkrupp Industrial Solutions AG - Sg Liang, Brunei
(2019-07 - 2021-11)
Project: Ammonia/Urea Fertilizer Plant, Sg Liang, Brunei. Client: Brunei Fertilizer Industry (BFI), Brunei.
- Responsible for the daily interface with construction supervision; monitoring, verifying, and documenting.
- Monitor contractor work activities and ensure the quality of work performed.
- Review and update the quality control checklist and inspection and test plan (ITP)
- Ensure the most current design document is used to complete the work and that all design changes are approved prior to implementation.
- Troubleshoot any problem arises during work execution
- Ensure that the project is executed in accordance with the Project Specification.
- Ensuring the implementation of approved work procedures.
Painting & Insulation Supervisor - Samsung Engineering Company Limited (SECL) - Pengerang, Johor, Malaysia
(2017-08 - 2018-11)
Project: Petronas Rapid Project, Pengerang, Johor, Malaysia. Client: Petronas, Malaysia.
- Responsible for the daily interface with construction supervision; monitoring, verifying, and documenting.
- Monitor contractor work activities and ensure the quality of work performed.
- Review and update the quality control checklist and inspection and test plan (ITP)
- Ensure the most current design document is used to complete the work and that all design changes are approved prior to implementation.
- Troubleshoot any problems arising during work execution.
- Ensure that the project is executed in accordance with the Project Specification.
- Ensuring the implementation of approved work procedures.
Topside Insulation Inspector - Shell Pacific Enterprise Limited - Geoje, South Korea
(2015-12 - 2017-04)
Project: Shell Prelude FLNG Project, Geoje, South Korea. Client: Shell, Australia.
- Responsible for the daily interface with construction supervision; monitoring, verifying, and documenting
- Quality control, tracking and accurately reporting installed quantities, and ensuring that work is performed according to the latest design revisions.
- Monitor contractor work activities and ensure the quality of work performed.
- Review and update the quality control checklist and inspection and test plan (ITP)
- Ensure the most current design document is used to complete the work and that all design changes are approved prior to implementation.
- Troubleshoot any problems arising during work execution
- Ensure that the project is executed in accordance with the Project Specification.
- Ensuring the implementation of approved work procedures.
- Ensure document control and traceability.
Field Engineer (Insulation, Coating, and Fireproofing) - Bechtel Corporation Inc - Lumut, Perak, Malaysia
(2014-05 - 2015-11)
Project: Wheatstone LNG Plant Project, Lumut, Perak, Malaysia. Client: Chevron, Onslow, Australia.
- Responsible for the daily interface with construction supervision; monitoring, verifying, and documenting
- Quality control, tracking, and accurately reporting installed quantities, and ensuring that work is performed according to the latest design revisions.
- Involved in field verification of materials.
- Create Field Material Requisitions as required to fulfill the site requirements for construction materials according to the Materials Responsibility Matrix.
- Monitor contractor work activities and ensure the quality of work performed.
- Review and update the quality control checklist and inspection and test plan (ITP)
- Ensure the most current design document is used to complete the work and that all design changes are approved prior to implementation.
- Troubleshoot any problems arising during work execution.
- Ensure that the project is executed in accordance with the Project Specification.
- Coordinate, maintain and update all documentations.
- Ensuring the implementation of approved work procedures.
- Ensure document control and traceability.
- Reviewing material certification and test data from suppliers/subcontractors - report to the Lead Field Engineer for insulation, Coating & Fireproofing.
Insulation Supervisor - Chiyoda Malaysia Sdn Bhd - Bintulu, Sarawak, Malaysia
(2012-05 - 2014-04)
Project: TMP 1 & 2 Project, Bintulu, Sarawak, Malaysia. Client: Tokuyama Polycrystalline Silicon (TMP), Malaysia.
- Monitor insulation contractor work activities and ensure the quality of work performed.
- Review and update the quality control checklist and inspection and test plan (ITP)
- Ensure the most current design document is used to complete the work and that all design changes are approved prior to implementation.
- Troubleshoot any problems arising during work execution.
- Ensure that the project is executed in accordance with the Project Specification.
- Coordinate, maintain, and update all documentation.
- Ensuring the implementation of approved work procedures.
- Ensure document control and traceability.
- Reviewing material certification and test data from suppliers/subcontractors - report to the Scaffolding, Painting & Insulation Lead.
Painting & Insulation Supervisor - Foster Wheeler Worley Parsons (FWW) - Karratha, WA, Australia
(2010-08 - 2011-12)
Project: Pluto LNG Project, Karratha, WA, Australia. Client: Woodside Burrup Pty Ltd, Australia.
- Monitor paint & insulation contractor performances.
- Troubleshoot any problems arising during work execution.
- Ensure that the project is executed in accordance with the Project Specification.
- Coordinate, maintain, and update all documentation.
- Ensuring the implementation of approved work procedures.
- Ensure document control and traceability.
- Reviewing material certification and test data from suppliers/subcontractors - Report to Scaffolding, Painting & Insulation Superintendent.
Painting & Insulation QC Inspector - Foster Wheeler Worley Parsons (FWW) - Liam Chabang, Thailand
(2008-12 - 2010-02)
Project: Pluto LNG Project, Liam Chabang, Thailand. Client: Woodside Burrup Pty Ltd, Australia.
- Ensure that the project is executed in accordance with the Project Specification & QA/QC requirements.
- Prepare and implement the project quality plan.
- Coordinate, maintain, and update all quality documentation records.
- Ensuring the implementation of approved work procedures.
- Issue non-conformance reports and recommend resolutions for corrective actions.
- Raised inspection reports and review as per requirements in the ITP.
- Ensure document control and traceability.
- Development of ITP and finalize the QA/QC Report
- Reviewing material certifications and test data from suppliers/sub-contractors - Report to Primary Yard Manager.
QC Supervisor (Steel Structure Fabrication) - Sumatec Corporation Sdn Bhd - Malaysia
(2008-04 - 2008-11)
Project: Petronas Revamp Project PSR2 (Package Steel Structural & Pipe Rack Fabrication – 2200 metric tons). Client: Petronas Penapisan, Melaka, Malaysia.
- Monitoring structure and pipe rack fabrication activities.
- QC inspection on structure welding.
- Prepare daily progress reports.
- Inspect Hot Dip Galvanizing activities and prepare a packing list for delivery.
- Coordinate transportation for steel structures from fabrication, Hot-Dip Company, and shipping agency.
QA/QC Supervisor (Static & Rotary Equipment) - Sumatec Corporation Sdn Bhd - Melaka, Malaysia
(2007-04 - 2008-03)
Project: Petronas MG3 Lube Oil Project, Melaka (Package Equipment Erection). Client: Petronas, Malaysia.
- Ensure that the project is executed in accordance with the Project QA/QC requirements.
- Prepare and implement the project quality plan.