Langkau ke kandungan utama
Viknesh Punichelvan

Viknesh Punichelvan

Sr. Mechanical Engineer (Project)

Bakat
Gelang Patah, JohorAhli sejak 1 November 2026
AutoCAD (AutoDesk AutoCAD 2012, Certified Associate)
·

Sewa orang ini

Hantar tawaran kerja terus kepada calon ini

AutoCAD (AutoDesk AutoCAD 2012, Certified Associate)

Tentang

Mechanical Engineer with more than 11 years of experience in project engineering and boiler operations within the oleochemical industry. Experienced in managing utility systems including steam boilers, natural gas systems, storage tanks, piping networks, and cogeneration facilities from planning and installation through operation and maintenance.

Qualified First Grade Steam

Engineer with strong technical expertise in boiler operation, boiler house management, preventive maintenance, energy optimization, DOSH regulatory compliance, and process safety management. Proven track record in managing CAPEX projects, supervising contractors and utility operations, coordinating DOSH inspections, and supporting ISO 50001 implementation while ensuring safe, reliable, and efficient plant operation.

Pengalaman

Sr. Mechanical Engineer (Project) at Pacificoleo Chemicals Sdn. Bhd (2014-12 – Present)

Employment: 11 Years 5 Months [December 2014 - Present]

  • Assist Technical Manager in evaluating new projects, plant modifications, and improvement proposals.
  • Manage CAPEX projects from planning, budgeting, procurement, installation, and commissioning until project completion.
  • Prepare project schedules, budgetary cost estimates, technical evaluations, and contractor comparison summaries.
  • Carry out Management of Change, Management Program, and CAPEX for new projects.
  • Coordinate technical discussions, negotiations, and project meetings with consultants, contractors, vendors, and management.
  • Monitor project safety, quality, progress, budget, and compliance with engineering specifications.
  • Review P&IDs, piping layouts, C&S drawings, and technical documents before project execution.
  • Coordinate piping installation, equipment installation, and plant modification activities with production and maintenance teams.
  • Prepare isometric drawings and bills of quantities for piping works.
  • Work closely with EHS team in reviewing Job Safety Analysis (JSA), Method Statements, HIRARC, and critical work activities.
  • Participate in commissioning, startup activities, troubleshooting, and plant handover.
  • Support site facilities maintenance activities including utility pipe racks, drainage systems, firefighting systems, warehouses, and general infrastructure.
  • Lead and supervise daily operation, maintenance, and reliability of steam boilers and utility systems to ensure continuous and safe plant operation.
  • Supervise utility personnel, boilermen, contractors, and maintenance activities related to utility and facility systems.
  • Train and supervise boilermen to ensure compliance with operational and safety procedures.
  • Maintain operational records, utility consumption reports, and boiler performance data.
  • Coordinate boiler inspections, preventive maintenance, pressure vessel inspections, DOSH.
  • Prepare and report the daily COGEN operation savings report to the Managing Director.
  • Update and generate monthly reports on steam and other utilities (electricity, water, and natural gas).
  • Liaise with chemical suppliers to maintain boiler water treatment quality within recommended limits.
  • Prepare daily cogeneration operational savings reports and monthly utilities performance reports.
  • Conduct troubleshooting and coordinate corrective actions for boiler system abnormalities.
  • Prepare MOC, CAPEX proposals, ROI calculations, SOPs, and work instructions for utility improvement projects.
  • Work closely with the EHS teams in HAZOP, HIRARC, and risk control activities.
  • Support ISO 50001 energy management compliance and energy performance monitoring.
  • Improved boiler thermal efficiency from evaporation ratio of 11.5 kg/Sm³ to 12.5 kg/Sm³.
  • Reduced fuel gas consumption by approximately 5% through condensate recovery system implementation.
  • Reduced fuel gas consumption by approximately 5% through economizer installation for HP boilers.
  • Proposed and implemented continuous hardness analyzer system to improve boiler feed water quality control.
  • Proposed installation of air preheater for 3,000 kW thermal oil heater with estimated fuel savings of 7%.

R&D Engineer at Oriental Metal Industries Alloy (M) Sdn. Bhd. (2013-09 – 2014-11)

Employment: 1 Year 2 Months [September 2013 – November 2014]

  • Led OEM and aftermarket project activities as Project Leader.
  • Prepared CNC lathe and drilling programs for new alloy wheel designs.
  • Reviewed concept drawings and prototype designs prepared by draftsmen.
  • Updated PFMEA documentation and prepared technical reports for prototype division.
  • Coordinated prototype preparation and customer approval processes before mass production.
  • Participated in tooling reviews, process improvement activities, and new process implementation.
  • Conducted alloy wheel testing according to ISO standards and customer specifications.
  • Coordinated maintenance activities for CNC lathe and drilling machines.

Pendidikan

Master of Science in Mechanical – Universiti Teknologi Malaysia (2019 – 2021)

Bachelor of Engineering in Mechatronics – Universiti Malaysia Pahang (2009 – 2013)

Sijil Tinggi Pelajaran Tinggi, STPM – SMK Seri Garing Rawang (2008)

Kemahiran

Sr. Mechanical Engineer (Project)

Ulasan