Project manager
Request a quote with no obligation
Hello Sir.
My name is Akwu Chigozie Franklin I am 29 years old.
I am applying for the position of an Engineer.
I have done Bsc in Building Engineering in October. 2019
I have 10 years experience in field. I have experience building and steel structures. Presently as I have worked in multi-million naira projects with good remarks, I am currently working as Resident Engineer in Abuja.
Find my CV bellow. Regards
080,6533,6502
Over 10 years of construction experience I will bring my creative motivational and strategic working skills to the client side with our company I have
Follow The Project According To Slandered (BS) Quantity Of All Material
Sub Structure And Super Structure As Per Design And Quality
Bricks & Plastering, Sewerage Pipe
Line And Manholes Works As Per Design & Quality
HConcrete Cube Test, Concrete Slump
ICP Piling, Shoulder Piling And Pile
Stone Piling, Column Beam & Slab
Concrete Works As Per Design & Quality
Bridge Structures, Piling, Foundation, Pile-Caps, Column, Beams
Quantity Survey And BOQ (Bill Of Quantity)
Strom Water Drainage, Concrete
Drainage, Open Channel Drains And Sub Soil Drains
Road Soil & Embankment and Earth Moving Works as Per Design &Quality.
Asphalt Works as Per Design & Quality.
Stone Pitching, Retaining Walls,
Cattle Creak, Street Light & Median Of Road As Per Design & Quality.
Cross Pipe Culverts, Pipe Drainage
Road Base & Aggregate, Road
Preparing Road X-section and Y-section drawings and daily progress report.
Getting a straight line allignments
Inspection the Drainage work, Box
Culvert work and survey work.
Inspection the Pile-cap, Column
Work and reinforcement and precast reinforcement.
Calculation of required material and inform to Site Engineer.
Providing technical advice to the Forman and worker.
Co-ordinate the setting-out and levelling.
Handling the equipment and material records.
Inspection the site & Planning for next day work.
Co-ordination with Consultants for inspections
Preparing Road X-section and Y-section drawings and daily progress report.
Getting a straight line allignments
Inspection the Drainage work, Box
Culvert work and survey work.
Inspection the Pile-cap, Column
Work and reinforcement and precast reinforcement.
Calculation of required material and inform to Site Engineer.
Providing technical advice to the Forman and worker.
Co-ordinate the setting-out and levelling.
Handling the equipment and material records.
Inspection the site & Planning for next day work.
Co-ordination with Consultants for inspections