Skip to main content
Barkath Ulla

Barkath Ulla

Kiln Operator with 18 years of experience in cement manufacturing

Kajul, KachiaMember since January 1, 2026
Commissioning & stabilization of FLS Kiln, 4000TPD capacityOperation and optimization of Mills and KilnMonitoring Specific Heat & Power Consumption of entire PlantOperation and optimization of Coal mill VRM having Capacity of 75TPHPower reduction in ATOX 28.2 coal mill as Energy ChampionCapable to take right decision to avoid plant breakdownATOX-42.5+35 Raw Mill VRM operationLoesche Cement mill VRM operation
·

About

To continuously enhance skills in areas of Cement manufacturing and establish myself as an expert in Cement technology. Ability to move in any competitive field.

Experience

Kiln Operator - M/S Tabuk Cement Company - Saudi Arabia

(2024-01)

Associated with M/S Tabuk Cement Company-Saudi Arabia, having capacity of 5000 t/d. KILN D 4.8M, Length 72M With IKN GRATE COOLER AREA 134M2, (VRM)UM 46.4R(450TPH) RAW MILL AND 150 TPH *4 CEMENT BALL MILL GRINDING.

Kiln Operator - Production - M/S Riyadh Cement Company - Saudi Arabia

(2019-01 - 2024-12)

Worked as a Kiln Operator - Production in M/S Riyadh Cement Company -Saudi Arabia, having capacity of 5000*2 TPD two lines supplied by SINOMA. Kiln D4.85m, length 74m with IKN cooler, 170 TPH Raw and Cement Ball mills.

Senior Plant Engineer-Production - M/S Chettinad Cement Corporation Private Limited - Ariyalur, India

(2016-01 - 2019-12)

Worked as a Senior Plant Engineer-Production in M/S Chettinad Cement Corporation Private Limited, Ariyalur works, having capacity of 4000*2 TPD Two lines Supplied by FLS. Kiln D4.65 m, length 70 m with cross bar cooler SF 3x5F, 42.5 +3S Atox Raw mill, 28.2 Atox Coal Mill and 56.3+3S for Loesche Cement grinding.

Central Control Room Operator -Production - Chettinad Cements Corporation Private Limited - Karikali, India

(2008-01 - 2016-12)

Worked as a Central Control Room Operator -Production in Chettinad Cements Corporation Private Limited, karikali works having capacity of 4000 TPD & 3200 TPD fully atomized modern FLS plant. Kiln D 4.65 m, length 70 m and D 4.45 m, length 67 m with 125.4 grate Area cooler & Cross bar cooler, Loesche 46.4R Raw mill, coal mill Loesche 21.2R and OK Cement Mill 36.4R for Cement grinding.

Education

B.Tech/B.E - Chemical Engineering - Indian institute of Engineering (AMIIE) (2008-01 - 2011-12)

Diploma - Chemical Engineering (D.CH.E) - Kongu Polytechnic College (2005-01 - 2008-12)

Reviews