Clement Maduagwuna
HVAC Technician
Hire this person
Send a job offer directly to this candidate
About
To become one of the leading technicians in the field of HVAC installation and technology. I aspire to be able to troubleshoot any fault conditions as well as maintain a rigid and excellent maintenance plan.
Experience
HVAC Technician - TEKNITECH ENGINEERING LTD
(2025)
- Worked on complete overhaul of compressors for Chillers, DX systems etc.
- Servicing and replacement of compressor oil heaters & key component parts.
- Installation of pipe sleeves for Split AC’s, Cassette units and so on.
- Troubleshooting of faulty chillers to narrow down and identify possible faults.
- Replacement of low side suction transducers & faulty solenoid valves.
- Vacuuming and gasing the refrigerant system of the Chillers & DX systems
- Careful ruting of refrigerant pipes through pipe sleeves
- Installation of FCU’s, AHU’s, Split units for several AC systems such as DX systems, Chiller systems and VRF systems.
- Testing of refrigerant lines for leakages before commissioning or in order to identify leaks in the system.
- Refitting and replacement of key component parts in VRF’s, DX and Chilled water systems.
- Hanging and positioning of supports while routing refrigerant pipes in the top false ceiling.
- Commissioning and isntallation of numerous kinds of AC systems - Split units, VRF systems, Chilled water systems etc.
HVAC Technician - RITE FOODs - Along Sagamu - Benin Expressway, Ososa, Ogun state
(2024 - 2025)
KKT Chillers; Husky Chillers
- KKT Chillers: Worked on complete overhaul of the Chillers compressors
- KKT Chillers: Servicing and replacement of compressor oil heaters
- KKT Chillers: Replacement of burnt compressors
- KKT Chillers: Troubleshooting of faulty chillers to narrow down and identify possible faults.
- KKT Chillers: Replacement of low side suction transducers.
- KKT Chillers: Vacuuming and gasing the refrigerant system of the Chillers.
- KKT Chillers: Replacement of faulty solenoid valves.
- KKT Chillers: Documentation of key parameters and variables to measure the Chillers performaces over time.
- Husky Chillers: Servicing of the Chillers and identifying faults in the system and narrowing it down to faulty component parts.
- Husky Chillers: Performed routine checks on the industrial chiller system, pumps and fluid coolers.
- Husky Chillers: Troubleshooting mechanical, electrical, and refrigeration faults—including compressor issues, refrigerant leaks, or low water flow rates.
- Husky Chillers: Replacement of burnt compressors
- Husky Chillers: Vacuuming the system and re-gassing the refrigerant system.
HVAC Technician - PROMASIDOR NIGERIA LTD - 3A/B Cowbell way, Isolo, Lagos state
(2018 - 2024)
- Complied with all applicable standards, policies, and procedures, including safety procedures and the maintenance of a clean work area.
- Tested electrical circuits and components for continuity, using electrical test equipment.
- Inspected and test system to verify system compliance with plans and specifications and to detect and locate malfunctions.
- Discussed heating-cooling system malfunctions with users to isolate problems or to verify that malfunctions have been corrected.
- Recorded and report all faults, deficiencies, and other unusual occurrences, as well as the time and materials expended on work orders.
- Tested pipe or tubing joints and connections for leaks, using pressure gauge or soap-and-water solution.
- Adjusted the system controls to setting recommended by the manufacturer to balance system, using hand tools.
- Recommended, developed, and performed preventive and general maintenance procedures such as cleaning, power-washing and vacuuming equipment, oiling parts, and changing filters.
- Conversant with refrigerant gas systems and their respective applications (R410a, R134a etc.)
- DX Systems: Responsible for the installation of many Window units and Split unit AC systems of different brands (Panasonic, Diakin, LG etc.).
- DX Systems: Responsible for the installation and commissioning of numerous Floor standing AC units of different brands (Panasonic, Diakin, LG etc.)
- DX Systems: Responsible for diagnosing faults and the repair of numerous Window, Split units and Floor standing units. Maintenance activities might include compressor replacement, checking for leakages in copper pipes and bracing them, servicing and cleaning of entire AC units.
- DX Systems: Developed Maintenance plans for different AC systems in each department of the company and ensured that they are strictly adhered to.
- DX Systems: Experience in troubleshooting for faults in split and window unit AC units.
- Chilled Water System: Championed the installation of a new Chiller system for our EVAP Can sterilizing machine.
- Chilled Water System: Performed periodic maintenance and cleaning of AHU’s as per maintenance plan.
- Chilled Water System: Performed maintenance repaires and bracing of copper pipes for refigerant piping.
- Chilled Water System: Performed troubleshooting checks and diagnosis on Chilled water systems.
- Chilled Water System: Responsible for the insulation of of Chilled water lines.
- Chilled Water System: Responsible for the routing of new chilled water routes to new FCU’s and AHU’s.
- Chilled Water System: Responsible for the installation of FCU’s and AHU’s and pressure testing their connections.
Part-time experience
- Repair and servicing of refrigerators and freezers.
- Diagnosis and repair of faulty Window and Split AC units.
- Reconstruction of refrigerant and freezer refrigerant lines.
- Replacement of faulty compressors in refrigerators, freezers and AC units.
- Electrical diagnosis of electrical faults in AC units and refrigerant systems.
Education
Modular Trades Technical Certificate - NABTEB/MTC/T (2010 - 2011)
RA - Lagos state Ministry of Women Affairs (2010 - 2011)
West African Senior Secondary Certificate (WASSC) - Barek Memorial High School, Iba new town, Lagos (2002 - 2007)
Primary School Leaving Certificate - Mafoluku Primary School, Oshodi, Lagos (1996 - 2002)