SAP Online Work Permit System (PTW/WCM) creation, tracking, and safety complianc
·

Hire this person

Send a job offer directly to this candidate

SAP Online Work Permit System (PTW/WCM) creation, tracking, and safety complianc

About

Dedicated and skilled Site Engineer with 7 year of experience in site layout, construction supervision, DPR preparation, and project coordination. Committed to delivering quality work, maintaining safety, and ensuring timely project completion.

Experience

Site Engineer - Mass N Void Design Consultants (A Pranav Group) - Nagar Nigam Korba (Chhattisagarh)

(2019-07 - 2024-02)

Project - PRADHAN MANTRI AWAS YOJNA. Experience : 6 Year

  • Executed site layout and level marking as per drawings.
  • Supervised RCC, shuttering, brickwork, plastering, and finishing works.
  • Prepared and submitted Daily Progress Reports (DPR).
  • Coordinated with contractors, workers, and management teams.
  • Ensured adherence to quality and safety standards.
  • Monitored material usage and maintained proper site documentation.
  • Assisted in resolving technical issues and supported smooth site operations.

Site Engineer - M/s spargeo infra - Korba

(2024-08 - 2026-03)

  • Deployed at 2*660 MW super critical thermal power project located in korba
  • End to end responsible for the exception of 600 and 760mm Dia. Cast-in-situ piling activity for boiler TG MPH and other auxiliary buildings

Execution Engineer - TRADE & INDUSTRIAL SYNDICATE - BALCO (Bharat Aluminium Company) and Vedanta plant

(2026-04)

  • Potline-3 Section 2,3,5 & 8 Busbar Repair
  • Led the structural rehabilitation and repair works of Potline-3 Section 2,3,5 & 8 Busbars using specialized techniques including Injection Grouting, Polymer Modified Mortar (PMM), and Carbon Fiber Reinforced Polymer (CFRP) wrapping.
  • Executed heavy structural lifting operations using hydraulic jack lifting systems to facilitate precise regrouting and alignment of load-bearing sections.
  • Ensured high-strength retrofitting and load stabilization of critical industrial components, significantly extending the service life of the busbar foundations.
  • FTP Chimney-02 Repair
  • Headed the structural repair and retrofitting project for FTP Chimney-02, addressing structural distress through targeted nozzle epoxy grouting and Polymer Modified Mortar (PMM) application.
  • Implemented advanced Carbon Fiber Wrapping (CFRP) systems to enhance the shear strength, seismic resistance, and load-bearing capacity of the chimney shell.
  • Conducted thorough pre-repair assessments and post-application quality checks to ensure seamless bonding and long-term durability against thermal and environmental stress.
  • CHIMNEY RCC CORBEL WORK
  • Formwork & Reinforcement Supervision : Managed formwork fixing, bar bending schedule (BBS) verification, and steel tying for heavy load-bearing cantilever RCC corbels at designated lift intervals inside the RCC chimney shell.
  • Concreting & Curing : Ensured proper concrete placement, compaction via mechanical vibrators, and standard curing routines to maintain structural integrity and load-carrying capacity for brick lining support.
  • REFRACTORY BRICK LINING & THERMAL INSULATION
  • Brick Lining Execution: Directed the laying of refractory fire bricks / acid-resistant bricks over corbel supports along the internal perimeter of the chimney shell.
  • Specialized Mortar Application: Ensured correct mixing ratios and continuous application of specialized chemical/fire-resistant mortars (sodium silicate / potassium silicate / resin mortars) maintaining strict joint thickness.
  • Air Gap & Insulation Wall: Supervised placement of high-density rockwool / mineral wool insulation blankets behind the brick lining to prevent thermal transfer to the main RCC shell.
  • Quality Control & JMR Verification
  • Conducted QA/QC inspections using standard site checklists for reinforcement, shuttering, and concrete pouring.
  • Prepared, verified, and finalized Joint Measurement Records (JMR) with client and consultant representatives for timely billing.
  • Maintained essential site documentation, including signed JMRs, daily progress reports (DPR), and quality checklists
  • Experienced in SAP Online Work Permit System (PTW/WCM) creation, tracking, and safety compliance

Education

MASTER OF ART'S - ATAL BIHARI VAJPAYEE VISHVAVIDYALAY BILASAPUR (2022)

POST GRADUATE DIPLOMA IN COMPUTER APPLICATION - DR. CV RAMAN UNIVERSITY (2021)

BACHOLER OF ART'S - ATAL BIHARI VAJPAYEE VISHWAVIDYALAYA BILASPUR (2020)

DIPLOMA IN CIVIL ENGINEERING - CHHATTISGARH SWAMI VIVEKANAND TECHNICAL UNIVERSITY BHILAI (2018)

12TH - CGBSE (2013)

10TH - CGBSE (2011)