Rope Access Technician Level 3 Supervisor - RUSSELSMITH NIGERIA LIMITED - USAN FPSO/ERHA FPSO
(2022-01)
- Visual inspection and photographic survey on mooring chain and structural beams using Rope Access Techniques
- Conduct (MPI and LPT) and work with the DRT team for Radiographic testing on welded joints
- Installation and dismantling of Rigging gears on structural beams
- Removal and installation of new security razor wire on the mooring chain, risers and overboard structures
- Perform thickness measurement/Corrosion monitoring on Piping, Exchangers and pressure vessels
- Installation of Anodes in sludge Tank (Confine space entry)
- Tying of potential drop object at height with the aid of Rope Access
- Installation of cable trays, pulling of cables and securing of cables in the tray using cable ties
- Removal and installation of insulation from Corroded pipes with the aid of Rope Access
- Act as a member of the emergency rescue team to ensure safety of personnel's working in the confine space
- AUT inspection with photographic survey on vessels
- Full visual inspection on structures, Pipings and Equipment
- Installation of heat sensitive cables on the FPSO
- Unblocking of pipes at height with the aid of Rope Access
- Confined space entry into void tank for photographic survey with NDT UTG inspection
- Pulse Eddy Current (PEC) inspection on Risers and Pipings
- Carry out ultrasonic testing on fire water line pipe with the aid of Rope Access
- Carry out Magnetic particle inspection on welded
- Carry out Housekeeping before, during and after the task
Rope Access Technician Level 3 - ALTRAD PREZICON NIGERIA LIMITED - EGINA FPSO, UNITY FSO
- Installation of V-deck for painting and blasting activities inside the water ballast tank
- Installation of rigging gears
- Replacement of 36" damaged spool
- Fabrication of pipe Support
- Installation of Tarpaulin for diversion of deluge spray to Equipment
Rope Access Technician - DORMANLONG ENGINEERING LIMITED - BONGA FPSO
- Replacement of Corroded pipe support
- Touch up painting of structures and piping
- SBM buoy receiver line replacement of 10" and 12" lines
- Modification and replacement of pipe support
- Modification of 16" pipe and supports
- Painting of structures (beams, walkway and supports)
- Passivation
- Removal and Replacement of water treatment plant
- Modification of 8" ,10" and 14" pipe support
- Touch up painting on beams, various installed STP pools and tanks
- Painting of handrails
- Signage maintenance
Rope Access Technician - DBN NIGERIA LIMITED ENTREPOSE - EGINA FPSO, AMENAM FSO
- Installation of rigging at various locations on the FSO
Rope Access Technician - QUADRANT ENERGY NIGERIA LIMITED - OSO RX, EAP
- Carrying out insulation test on power and instrument cables
- Cable tray installation
- Tracing of Cables from designated junction box to the control room
- Pulling of cables and securing of cables in the tray using cable ties
- Splicing of cables/shrink wrapping of cables using propane touch and heat gun
- Bending and cutting of tubings / Securing of tubings in the tray
Rope Access Technician - NIGSA ENERGY NIGERIA LIMITED
- Installation of AHMS (Sensor) in the 35 metres water ballast tank
Rope Access Technician - DORMANLONG ENGINEERING LIMITED
- Surface preparation and painting using hand brush and rollers
Rope Access Technician - DOUMICON ENGINEERING LIMITED
- Cable tray installation
- Pulling of cables and laying of cables in the tray
- Securing of cables in the tray using cable ties
- Installation of cameras
- Alignment and simulation of open path Gas detectors
- Close loop checks on hoist
- Inspection of junction boxes
- Replacement of faulty junction boxes
- Termination of cables of cables at designated junction boxes
- Replacement of faulty Electrical fittings
Rope Access Technician - FAWEL ENGINEERING LIMITED
- Installation of fire wire on the main deck
- Magnetic particle inspection on pad eye
- Splicing of cables/shrink wrapping of cables using propane touch and heat gun
- Replacement of faulty instruments
Rope Access Technician - FAWEL ENGINEERING LIMITED
- Installation of tubings in the slope tank
- Replacement of bad tubings in the slope tank
- Installation of fire wire on the main deck
- Installation of heat tracing cable on the main deck
- Cable tray installation/Pulling of cables and securing of cables in the tray
Rope Access Technician - DBN ENTREPOSE NIGERIA LIMITED
- Drilling, installation of pipe support and spool for Acetic Acid injection connection
- Cable laying, cable dressing and securing of cables in the tray
- Cutting of tubings, bending of tubings, laying and securing of tubings in the cable tray