
Silas B. Galadima
Installation and commissioning
Hire this person
Send a job offer directly to this candidate
About
The desire to contribute towards the growth, development and realization of goals of an organization through effective utilization of available resources, analytical skills and versatility.
Experience
Installation and commissioning - Nigeria Army training Depot Oshogbo
(2026-02)
Installation and commissioning of a 100kg/h medical waste incinerator
ROV Pilot Tech - London Offshore Consultants Limited - Etim and Inim Field (Mobil)
(2022-12)
Contractor: London Offshore Consultants Limited; Sub Contractor: Irentify Global Solutions Limited; ROV UWILD Survey; Seaeye Falcon; LB Cameron and LB Kylie
ROV Pilot Tech - Fadfae Engineering Limited - Okono field (Npdc)
(2022-07 - 2022-08)
Sub Contractor: Tallsea Integrated Services Limited; ROV Survey; Seaeye Falcon/ECA H1000; Mv Posideon
ROV Pilot - Irentify Global solutions Limited - Indoni River –Agip field
(2022-02)
Pipeline Inspection; Videoray Pro 4; Passport Boat
ROV Pilot - Tenoil - Ata field
(2021-10)
Sub Contractor: Tallsea Integrated Services Limited; Site survey and pipe tracking; Seaeye Tiger
Head of fabrication dept - OYA WASTE GROUP NIG. LTD - 6a Boskel rd off km16 ph/Aba rd
(2021-02 - 2021-11)
Supervision of civil constuctions of the waste management facility (office building and material processing area)( fabrication of a 500kg/h hazardous waste incinerator)
Materials Management Department - INDORAMA PETROCHEMICALS & FERTILIZER PLANT - ELEME PH
(2011-10 - 2021-01)
Duties: material handling technical maintenance supervisor - GOLDERN YEARS LIMITED - PORTHARCOURT
(2014-11 - 2016-03)
fabrication of a 500kg/h hazardous waste incinerator
Well intervention services - pamauto works - Total oml 58
(2013-10)
- Wells ob62/4 and ob63/5 replacement of raptured sdv shaft seals
- Wells ob 1/2 replacement of sdv, 104/5,5/4, wab valve passing, 5/5 96/5, 107/5master Valve passing, calibration of psl and psh on sdvwells ob89/4, 93/4.
Well intervention - pamauto works - Total oml58
(2012-01)
- Disconnection of sdv on well ob 45 and 46
Gate valves refurbishing - pamauto works
(2012-01 - 2012-05)
Refurbish of 30pcs fmc qate valves for Total e&p Nig. Ltd
ROV projects/missions - Tilon Subsea Nig Ltd - mpn yoho platform
(2011-04)
inspection of seabed, various locations snapping of pictures and video clips using the seaeye falcon.
Well intervention - pamauto works - total oml58
(2011-01)
- ob 114/5 repairs of swab valve, ob104/5 repairs of wing valve and replacement of bonnet, ob 04 replacement of swab cap & 0b31servircing of sdv and setting of psl/psh supervise frication, instalation and commissioning - Samtex ventures ph - mpn yoho yb platform offshore
(2009-10 - 2010-01)
oil well gas lift/injection: gaslift and injection project of eight wells on yoho yb cluster
Education
Industrial Technogy Education; Building tech - Federal university of technology minna (2006 - 2009)
NCE technical - Building tech - Kaduna polytechnic (2003 - 2005)
nabteb - Auto Mechanic - Government Techincal College Malali Kaduna (1993 - 1996)
Government College Kaduna (1991 - 1993)
