Vincent Okereke
Power plant operator.
Talent
Port Harcourt, Port-Harcourt1736.5 NGN/hourMember since May 4, 2025
·
Hire their services
Request a quote with no obligation
About
Operate and maintain Combine Cycle and thermal plant to generate power for utility above 600 Mega Watts. I have 10 year experience doing this.
Experience
- Netcodietsmann JV(NNPC/SPDC)OML11 2015-2022.
- Netcodietsmann JV(NNPC/ NEPL) 2022-2024.
- Netcodietsmann JV(NNPC/ NEPL/ WAGL) 2024-2025. Start up and shut down of gas turbine. Performance guarantee test. Online and Offline Compressor wash. Synchronization of Generator. Balance of Plant Operation. Rotor barring. Water Steam Conditioning. Heat Recovery Steam Generation. Steam turbine run up. Turning gear operation. Over speed and safety test. Routine oil test run.
Education
Mechanical Engineering
Chukwuemeka Odumegwu Ojukwu University. Uli Second Class Upper Division 2004-2009.
