North Baharya Petroleum company Norpetco, Karama Fields, Egypt
Maintenance Engineer April 2019- June 2022
Duties:
- Leading Mechanical crew consists of 8 technicians.
- Responsible for making and building Maintenance plans & schedules, Technical reports, work procedures and work schedules.
- Responsible for maintaining the machines reliability.
- Responsible for making maintenance department daily report.
- Responsible for technical evaluation of tenders.
- Work with Safety standards & Precautions (PPE, PTW, Work procedures, Risk assessment, Toolbox talk, mechanical isolation, Elec isolation, and LOTO).
- I was responsible for following up the status, and PM scheduling more than 100 diesel generators, 30 shipping pumps, 10 firefighting pumps and 10 cars in the company field.
- Responsible for making MRs (material requirement) alongside with the material department and warehouse for the mechanical section.
- Diesel Generators, & Pumps (Centrifugal, positive displacement, diaphragm, firefighting) troubleshooting and Repair.
- HPS (High Pressure System), & Pipeline troubleshooting.
- Making Calculations for pump selection.
Achievements:
- Repair 5 Caterpillar Diesel Generators 3406 292KW out of service having a serious problem that they can’t share load more than 36 KW and after repair works normally.
- Change more than 30 mechanical seals and Couplings for Goulds Pump 3196 i-frame.
- Adding the Concept of periodic check-up and survey for the assets by visually inspection, vibration metering, & thermal measuring.
- Contribute to the design and execution of 4 Clusters.
- Experience with Deep Sea & comAp synchronizing systems.
- Witnessing 5 ESP string assemblies and 1 pull-out.
- Perform Diesel Generator PMs for ESP Wells.
- Prepare training materials and I was responsible for trainin 10 groups of undergrads in the company field.
El-Awaam Pumping station EC Program, Menya City, Egypt
Mechanical Engineer November 2018- March 2019
- Calculate and make the hydraulic design of the pumping station.
Industrial Development Of Automotive Components IDACO, October industrial area.
QC engineer. January 2018- October 2018
- Leading QC crew consists of 2 supervisors and 5 technicians.
- Troubleshooting and resolve problems related to Harness manufacturing process.
- Make Five-whys & Cause analyses procedures to determine the root cause of the problem exists.