Programmer at Teligent Services Incorporated (2024-12 – 2026-04)
Client: Security Bank in Ayala, Makati. Environment: AS/400, OS/400, RPG/400, CL/400. Application System: FBEQ RBS – Retail Banking System
- Handle and assist change request for SBC Employee tagging– Parameter change and assist on the testing
- Handle change request for moneysend – With parameter setup and minor program modification and assist on the testing
- Handle Change request for Instapay Waived Fee for SBC Clients – Create a design and system flow to be able to waived the instapay fee for Payroll companies enrolled in SBC. Create several program to Extract the instapay fee transaction and reverse it when qualified for reversal. Assist on the testing from start to end
Programmer (2013 -2022), System Analyst (2022-2023) at Banco de Oro Incorporated (2013-02 – 2023-04-15)
Environment: AS/400, OS/400, RPG/400, CL/400. Application System: International Comprehensive Banking System (ICBS), Loans/CIF Subsystem
- Handle projects for BSP reporting related to Non-resident clients
- Enhancement of Credit Risk Data Mart (CRDM)
- Enhancement of Negative List Database System
- Handle FISERV projects - Digital Infrastructure and Data Repository
- Handle FISERV projects - Auto Interest Repricing
- Handle FISERV projects - Implementation of Business Line Product
- Handle FISERV projects - Auto Tagging to PDL
- Ideal wealth system
- Modify and create program related to Risk Management and AMLA requirement
- Handle General Ledger System enhancement and maintenance
- Handle 24x7 project
- Handle ICBS upgrade
IT Consultant / Senior Software Engineer at Misys International Banking System (2010-07 – 2012-11)
Environment: AS/400, OS/400, RPG/400, CL/400. Application System: Equation Banking System. Handle Module: Retail Lending. Duration: July 2010 – September 2011 and April 2012 – November 2012. Achievement: Consistent top fixer and was able to break the record for the number of fix done in a month.
- Developed and modified several programs/utilities in area of L3 maintenance to resolve bugs/errors in Equation which are reported by Misys Client
- Recreation of problems/error reported
- Preparation of local units that is suitable to client's level
- Technical analysis which includes debugging of programs affected
- Coding of changes to programs/files using Aldon Development Cycle Manager Platform
- Unit testing and documentation
- Create analysis for difficult case and design program fix for the problem
IT Consultant at Banco de Oro Incorporated (2011-10 – 2012-03)
Environment: AS/400, OS/400, RPG/400, CL/400. Application System: International Comprehensive Banking System (ICBS), Deposits 1. Handle Module: CASA and TIME Accounts. Achievement: Was able to create several program report provided to the user.
- Been part of the development of Private banking project
- Support user queries and provide reports
- Fix the bugs encountered by user
IT Consultant / Programmer Analyst at Futaba Corporation of the Philippines (FCP) (2008-10 – 2010-07)
Environment: AS/400, OS/400, RPG/400, CL/400, Visual Basic 6.0. Application System: HR and Payroll system, General Ledger System, Fix Asset System, Production System, Utility System, Evaluation System. Achievement: Able to make the HR and Payroll System stable.
- HR Enhancement Project (Project Leader) – Conduct system analysis and determine all programs that are needed for enhancement. Create program specification and modified the most of the programs. Create user and technical manuals
- Utility System Phase 1 and Phase 2 (Member) – Contribute ideas and create most of the program inside the Utility System
- Fix Asset System Project (Assistant Project Leader) – Contribute ideas and design some of the program. Create most of the program
- Evaluation System Enhancement Project (Project Leader) – Design and create specs for the project. Create user and technical manuals
Programmer Trainee at Radix System Services Incorporated
Environment: AS/400, OS/400, RPG/400, CL/400
On the Job Trainee at Integrated Microelectronics Incorporated (IMI) (2007-04 – 2007-05)
- Check the number of dust particle, moist content and check the condition of the facilities daily