Skip to main content
Dennies Quiatchon

Dennies Quiatchon

CIVIL ENGINEERING | PROJECT MANAGEMENT | DESIGN

Talent
Cabuyao, Laguna0Member since September 29, 2022
·

Hire this person

Send a job offer directly to this candidate

About

Deadline-driven and quality-focused team leader with more than 15 years of experience in construction/civil works/industrial design/engineering | Skilled interpersonal communicator able to successfully manage subcontractors and coordinate project management aspects | Fluent in English language, both written and oral, workflow supervisor who consistently accomplishes projects ahead of schedule and cost-efficiently

PROJECT HIGHLIGHTS (SUMMARIZED)

> Designed and built projects costing up to Php8Mil buildings across areas of Batangas, Laguna and Bulacan (Own Builds)

> Constructed/Supervised projects costing up to Php1.5Bil at NCR, Provinces of Bulacan, Batangas, Laguna & Quezon (Company hired)

> Can work with minimal supervision and in all aspects of engineering design / construction

> Use of latest structural analysis software

AREAS OF EXCELLENCE

Team Coordination | Scheduling | Cost Control | Field Review | Progress Billing | Billing Reconciliation | Technical Report | Document/Contract Review | Quality Control | Contracts and Specifications | Site Safety | Structural Engineering | Civil Works | Environmental Engineering | Concreting | Foundation | Bored Piles | Steelworks | Residences | Resorts | Commercial Buildings | Rental Spaces | Industrial Buildings and Structures | Topographic Surveys | CADD

SOFTWARE | DATA USED

AutoCAD | Civil3D | STAAD.Pro | Photoshop | MS Project | Primavera | Sketchup | Microsoft Office Applications

Experience

CONSTRUCTION MANAGER

AHNEX BUILDERS AND READY MIX CORP.

Cavite | Batangas

Jan22 to Jun22

Headed the control and responsibility of offsite projects by main HQ from a well-known Beach township developer | Manages and directs at most 150 personnel consisting of project/site/office engineers, surveyors, heavy equipment operators, construction workers, and other department’s personnel, subcontractors and suppliers to suite, resolve and address any issues regarding site operations and construction progress | Ability to address different aspects of the projects, its implementation, design, budgeting and technical reports | Instruct engineers and personnel on all aspects, construction methodologies, budget management, materials acquisition and technical reporting | Flexibility and workmanship having ability and technical knowledge to adapt/attend to needs of the projects in, but not limited to, design and cost estimation | Directly reporting to Top Management – EVP COO

ONGOING PROJECTS HANDLED

Land Development Works of Commercial Area | Balance of Works of Residential Area | Construction of Five (5) Sewage Treatment Plants | Beachfront township development | Php150Mil Cumulative | San Juan, Batangas | Jan ’22 – Jun ‘22

CIVIL/DESIGN ENGINEER

Calamba City 

Nov2O19 up to Nov2O21

Serves as main point-of-contact with clients/contractors, architects, consultants, suppliers, and subcontractors while overseeing construction personnel | Acts as Project Manager, monitoring workflow, subcontractors work and planning work schedule and supply/equipment delivery | Acts as structural engineer in both design aspects and on site implementation | Produces/procures technical drawings and supervises work programs and samples for client/main contractor | Conducts field review and site safety

WORKS AND ACCOMPLISHMENTS

Residential Apartment | Php5.7Mil | Design and Construction of 2-storey 6-unit Apartment Residences Later on Additional 3-bedroom Penthouse | Parian Calamba City | Nov ’19 – Nov ’21 | Diaz Residence | Php1.6Mil | Design of 1-storey Residence | Calamba Hills, Calamba City | Sep ‘2O

CONSTRUCTION MANAGER

HONEYCOMB BUILDERS, INC

Mandaluyong City | Quezon City

Dec18 to Nov19

Coordinates with the Planning and Design Department to discuss construction details, budgets, cost projections and scheduling | Attends MANCOMM to discuss developments of project/s | Serves as main point-of-contact with clients/contractors, architects, consultants, suppliers, and subcontractors while overseeing construction | Major redesign and revision to previous design/plan to update project with current situation, changes and contracts | Resolve boundary conflicts with respective concerned proponents and the barangay

ONGOING PROJECTS HANDLED

Urban Loft Congressional (21-Storey) | Php 9OO Mil | Constn Planning, Budgetary and Management | Congressional Ave., Quezon City | Mar ’19 – Nov ‘19 | ULC Showroom | Php 1 Mil | Constn /Renovation | Planning, Budgetary and Management | Congressional Ave., Quezon City | Jun ’19 – Nov ‘ 19 | Riprap along Pasong Tamo River | Design, Award and Monitoring | Congressional Ave., Quezon City | Dec ’18 – Jun ‘19

CIVIL/DESIGN ENGINEER

Calamba City 

Mar2O17 to Oct2O18

Serves as main point-of-contact with clients/contractors, architects, consultants, suppliers, and subcontractors while overseeing construction personnel | Acts as Project Manager, monitoring workflow, subcontractors work and planning work schedule and supply/equipment delivery | Acts as structural engineer in both design aspects and on site implementation | Produces/procures technical drawings and supervises work programs and samples for client/main contractor | Conducts field review and site safety

WORKS AND ACCOMPLISHMENTS

Hugo Residence | Php1.5Mil | Design and Construction of 2-storey 4-unit Apt Residence | Loma De Gato | Marilao, Bulacan | May–Oct’17 | Guipit Residence | Planning and Design | Calamba City | Ancero Home Improvement | Planning and Design

PROJECT ENGINEER

JRP DESIGN | SOUTHCALL BUILDERS CORP.

Muntinlupa City 

Nov2O15 to Feb2O17

Performs site assessment and deploys best engineering practices while overseeing multiple residential projects totaling around Php12OMil projects with team of contractors, sub-contractors and architects and engineers in their respective discipline | Perform project monitoring, accomplishments, billing assessment and reporting | Provide essential bill of quotations and CADD works | Performs structural analysis | Perform necessary quotations and progress billing reviews prior to endorsement | Perform appropriate action according to site to site situations

PROJECT HIGHLIGHTS

Successfully assumed responsibility of, at most, four (4) on-going residential projects in Cavite and Manila areas | Improvement of Bill of quotations (BOQs), Progress billing assessment and documentation | Design and Implementation of sound engineering methods to conflicting design-versus-actual details on site/s

WORKS AND ACCOMPLISHMENTS

Various Residential Houses – Ayala Westgrove Heights | Silang, Cavite | Php2O-6OMil each | Two-storey Residence with Attic and basement | AWH | Two-storey Residence with basement | AWH | Two-storey Residence with Attic and basement | AWH | Two-storey Residence with Roof deck and basement | Paranaque City | Two-storey Residence with Attic | AWH | Two-storey Residence with Attic and basement | AWH

CIVIL/DESIGN ENGINEER

Calamba City 

Oct2O13 to Aug2O15

Serves as main point-of-contact with clients/contractors, architects, consultants, suppliers, and subcontractors while overseeing construction personnel | Acts as Project Manager, monitoring workflow, subcontractors work and planning work schedule and supply/equipment delivery | Acts as structural engineer in both design aspects and on site implementation | Produces/procures technical drawings and supervises work programs and samples for client/main contractor | Conducts field review and site safety

WORKS AND ACCOMPLISHMENTS

Escueta Residence | Php1.6Mil | Design and Construction of Two-storey Residence | Gran Seville Cabuyao City | Mar – Aug ’15 | Two-storey Velasco Residence | Planning and Design | Sta.

Cecilia Village Calamba

City | SRI Office | Renovation Works | Sta. Anastacia, Santo Tomas Batangas | Home Improvement | Calamba Hills | Calamba City | Nov ‘14-Jan ’15 | Dela Cruz Residence | Php1.2Mil | Spring Homes, Calamba City | Oct ‘13-May ’14

PROJECT CIVIL ENGINEER

DERMPHARMA, INC.

Makati City | Tanauan City 

Sep2O12 to Sep2O13

Perform project engineering and cost control while overseeing multiple contractors totaling around 15O to 4OO personnel for a Php16Mil project | Perform project accomplishments/monitoring, billing assessment and reporting | Provide essential bill of quotations and CADD works | Perform subcontractors’ billing reconciliation and design and implementation review | Determine appropriate action according to RFIs

PROJECT HIGHLIGHTS

> Successfully assumed responsibility of, at most, nine (9) on-going projects, even when two project engineers left the company

> Consolidated company engineering files and documentation by implementing own format; and, this is due to the fact that,

> Attended managers’ meeting and presented EPM report

WORKS AND ACCOMPLISHMENTS | Renovation/Rehabilitation/Repair works of Christian College of Tanauan | Tanauan City | Php16Mil | Main building general works | Construction of Gymnasium | Entrance walkway renovation | Unified School building | Interior covered walkway Main building rear canopy | Parking space |Façade fence | Perimeter fence | Unified school walkway

CIVIL/DESIGN ENGINEER

Calamba City 

Feb2O12 to Jun2O12

Serves as main point-of-contact with clients/contractors, architects, consultants, suppliers, and subcontractors while overseeing construction personnel | Acts as Project Manager, monitoring workflow, subcontractors work and planning work schedule and supply/equipment delivery | Acts as structural engineer in both design aspects and on site implementation | Produces/procures technical drawings and supervises work programs and samples for client/main contractor | Conducts field review and site safety

WORKS AND ACCOMPLISHMENTS | Two-storey Toledano Residence | Php2.4Mil | Calamba Hills Calamba City | Feb-Jun ’12

SENIOR CIVIL ENGINEER

BRYANT CONCEPTS, INC.

Makati City

Aug2O11 to Nov2O11

Assesses and design large civil engineering and environmental works on commercial lots pre-planned with architectural and pre-discussed site development works from other departments within the company based in Australia

WORKS AND ACCOMPLISHMENTS | Proposed Offices and Warehouse | T & J Construction | Design / Proposal | South Australia | Proposed Offices and Warehouse | Toll Contract Logistics | Design/Proposal | South Australia

PROJECT/DESIGN/SITE/CIVIL ENGINEER

Calamba City

Aug 2010 - Jul 2011

Provide engineering design and construction works | Design spatial floor layout and structural design | Procure materials, labor and necessary documentation for the project/s to progress

PROJECTS COMPLETED: (1) Two-storey Villamarin Home Improvement | Fortezza Cabuyao City | May-Jul ’11 | (2) Sunscape Bay Resort | Php8Mil | Two-storey resort plus residence combination, with pools | South Spring Villas Calamba City | Aug ‘1O-Feb ’11

PLANNING & DESIGN ENGINEER

STO.NIÑO DE CEBU RESOURCES & DEVELOPMENT CORP.

Calamba City

Feb2OO8 to Apr2O11

(1) As ENVIRONMENTAL PLANNER | Design subdivisions from raw lands to saleable lots based on implementing guidelines of PD957 and BP22O, with amendments and resolutions | Plan out land development projects ranging from Php3OMil to Php8OMil to cater people safety and convenience through utilities and road networks placement | Sign and seal pertinent documents/plans/designs

WORKS AND ACCOMPLISHMENTS | BULACAN : Canyon Valley | Bulac Sta. Maria | LAGUNA : Palmsville | Banlic | Cabuyao City | Residenza de Alaminos | Alaminos | Cliffview II and III | Concepcion SPC | Creek Side Park III | SPC | St.

Michael

Village | Sto. Angel SPC | BATANGAS : Greenville III | Sabang and San Jose Lipa City | Miracle Heights III | Kayumanggi Lipa City | Hillcrest II | Malvar Batangas | Corinthian South IV | Lipa City | QUEZON : Highland Park II | Tiaong | Easter Mansion II | Candelaria

(2) As CIVIL ENGINEER | Works with project engineers at various North and South projects to provide plans and designs for on-site Implementation | Civil works design | Structural design and detailing | Visits sites, when needed dependent on the severity and nature of the structures and/or subdivisions to be designed | Signs and seals civil works designs

CIVIL DESIGN AND OTHER WORKS | Madison Gardens | Santo Tomas Batangas | Community drainage improvement | Stormwater drainage design | Reinforced/Modified perimeter fence design | Hill Crest | Malvar Batangas | Open space design | Slope protection | Storm/ wastewater drainage design | Shangri-La Place | Bocaue Bulacan | Slope protection | Storm and wastewater drainage design | Road Profiling | Tierra Allegra | San Isidro Cabuyao City | Storm/wastewater drainage design | Perimeter fence | Indigo Bay | Bagong Kalsada | Calamba City | Main Storm wastewater drainage design | Strengthen/flood-fortified perimeter fence | Palmsville | Banlic, Cabuyao City | Barangay Community Storm and wastewater drainage improvement | Six (6) Model houses | Ciudad Verde | Padre Garcia Batangas | Slope Protection | Providence Memorial Park | San Jose del Monte Bulacan | Line canal | Reinforced perimeter fence | Dasmarinas Cavite | Parking Spaces | Highland Park II | San Agustin Tiaong Quezon | Barangay drainage improvement | Reinforced concrete box culvert

(3) As SPECIAL PROJECTS ENGINEER | Project design within the company grounds | Site/space planning to cope up with company’s expansion/growth necessity | Monitor constructions adhere to design specifications, cost and time constraints

SPECIAL PROJECTS | Container van Main office extension, warehouse and file storage | Service entrance (5OkVA) improvement | Motor pool

PROJECT ENGINEER

TRANSASIA CONSTRUCTION DEV’T. CORP.

Muntinlupa City

Aug2OO7 to Jan2OO8

Conference with clients about construction/renovation works, designs and specifications | Supervises the project from start to completion located in different locations in Laguna and Manila areas | Recruit and build construction teams for various projects of the company

WORKS AND ACCOMPLISHMENTS | Tan Residence | Sta. Rosa Estates 2A Sta. Rosa City | Aug ‘O7-Jan ’O8 | Alvarez Residence | Sta. Rosa Estates 2A | Sta. Rosa City | Sep ‘O7-Jan ’O8 | Balani Residence | Php1.2Mil | Bel-Air Village Makati City | cont.-Jan ’O8 | Adoration Chapel | Our Lady of the Abandoned Parish Muntinlupa | Oct ‘O7-Jan ’O8 | Various Renovation & Expansion | Php12Mil | PDM Philippines | San Pedro Laguna | Sep ‘O7-Jan ’O8 | Morning Queen Laundry and Dry Cleaning Services | 1O12-C Level 1 Wing B Festival Mall Muntinlupa City | Sep-Oct ’O7 | Administration Office | Fontamara Subdivision | Brittany Sta.

Rosa City | Aug-Oct ‘O7

PROJECT / SITE / DESIGN ENGINEER

A-BROTHERS CONSTN AND DESIGNS

Sta. Rosa City

Jul2OO6 to Aug2OO7

Provide technical/structural design and site works for commercial, residential and industrial Buildings | Prepares CAD plans for permit and bill of quotations | Supervises the project from start to completion | There are several on-going projects on different places in Laguna, Batangas and Cavite area | Provides complete plans for some projects with compensation separate from salary

WORKS AND ACCOMPLISHMENTS | Two-storey Sho Residence | Php7Mil | Sta. Rosa Estates 2A Sta. Rosa City | Jul-Dec ’O6 | Native Food and Grill | SM Lipa City | Aug-Sep ’O6 | Warehouse docking bay | NEP Logistics Laguna Technopark | Sta.

Rosa City | Php1Mil | Sep-Nov ’O6 | Gallega Home Improvement | Php1Mil+ | Sta. Rosa Estates | Sta. Rosa City | Oct ’O6-Mar ’O7 | Aquino Home Improvement | San Rafael Estates | Santo Tomas Batangas | Mar-Apr ’O7 | Catapang Home Improvement | Sta.

Rosa Estates 2A | Sta. Rosa City | Bennett Residence | Cuta Batangas City | Agtay Residence | Pallocan West Batangas City | Commercial Building | Balibago Sta. Rosa City | Jan-Apr ’O7 | Atienza Home Improvement | Sta.

Rosa Estates I | Sta. Rosa City | Apr-Aug ’O7 | Four storey 34-unit Apartments | Php25Mil | Balibago | Sta. Rosa City | Jan-Aug ’O7 | De Lara Home Improvement | Sta. Rosa Estates 2A | Sta.

Rosa City | Apr-Aug ’O7 | Tan Residence | Sta. Rosa Estates 2A | Sta. Rosa City | May-Aug ’O7 | Chua Home Improvement | Php2Mil+ | Sta. Rosa Estates 2A | Sta. Rosa City | Oct ’O6-Aug ‘O7

PROJECT ENGINEER

WISEHILL BUSINESS CORPORATION

Quezon City 

Jan2OO6 to Jun2OO6

Provides Design expertise | Together with a team of architects, lowered cost of restaurant/store franchises of the company's donut chain stores for almost 50%, from Php 7OOk to around Php 4OOk | Served for Product development of prototype booths for new market strategy of the company | Assists design team in the CAD design and Structural design analysis manually and/or computer-aided | Prepare estimates of warehouse/plant renovations/special projects | Coordinates with specialty trade contractors and different company department heads regarding site, contractors' issues, production site, materials acquisition

WORKS AND ACCOMPLISHMENTS | One-Eyed Baker Booth | Enchanted Kingdom | Sta. Rosa City | Bite Donut Booth | Star Mall Alabang | Muntinlupa City | Large Booth | Special Franchise | Taytay Rizal | Van-on-the-Go | MRT Booth | Small Booth | Manggahan Plant Renovation | Manggahan Pasig City | E.

Rodriguez Plant

Renovation | Quezon City

CIVIL/DESIGN ENGINEER

Calamba City 

Aug2OO2 to Dec2OO5

Roles in the Project, as is with any other Projects I have handled from past to present, but not limited to the following:

PRE-CONSTRUCTION PHASE: (a) Provide floor layout | and, (b) Calculate structural analysis | (c) Provide complete structural plans and designs | (d) Provide pertinent documents necessary for the project/s, i.e., complete Bill of Quantities/Materials (BOQs/BOQs), Materials Specifications and any and the like | (e) Do projection/timelines | (f) Consult/Finalize any/all contract-basis works of suppliers/contractors.

CONSTRUCTION PHASE: (a) Check site/perimeter of site for possible conflicts and assurance of correct layout and placement of structure | (b) Predetermine areas at job-site for particular construction needs, i.e., materials stockpiling, barracks area, site enclosure / protection, etc. | (c) Provide technical expertise on site layout, structural details and proper construction methodologies | (d) Monitor project progress in terms of budget and/or actual completion | (e) Provide timely assessment, and/or later on, billings to contractors, subcontractors and/or owners, whichever the case may be

POST-CONSTRUCTION PHASE: (a) Do a final check | (b) Secure pertinent papers,i.e., turnover documents, government permits | (c) Provide assistance and/or assess works at timely manner to assure works done properly and no problem arises | (d) If problem arises, remedy/repair quickly and orderly | (e) Finalize filing of project documents.i.e., as-built plans, budgetaries vs. construction

WORKS AND ACCOMPLISHMENTS

Three unit Two-storey Baroro Apartment | Php1.5Mil | Brgy 7 Calamba City | Apr-Dec ‘O5 | Four unit Two-storey Apartment | Parian Calamba City | Jan-Jul ‘O4 | Two-storey Meneses Residence | Construction plans | Barandal Calamba City | Jun 'O3 | Two-storey Residence | Php2Mil | Parian Calamba City | Aug ’O2-Mar ‘O3

Education

BACHELOR OF SCIENCE IN CIVIL ENGINEERING | University of Perpetual Help System – Laguna | Mar 2OO1

Reviews