Skip to main content
Efren Binay

Efren Binay

Facade Designer

Talent
San MateoMember since August 25, 2026
Fabrication DrawingRFI/RFASite Verification LayoutMaterial Inspection and TestingFacade DesignWater Leakage InvestigationGlass CriteriaProject CoordinationSchedule Preparation
·

Hire this person

Send a job offer directly to this candidate

Fabrication DrawingRFI/RFASite Verification LayoutMaterial Inspection and TestingFacade Design

About

Almost 15 year of experience on Façade industry, from façade consultancy to façade contractor with different task involved, from design shop drawing up to fabrication and installation, including the site survey verification layout, has been develop on those years. During initial years on FAÇADE CONSULTANCY (ALT Cladding Inc.), was a Design Engineer in foreign project and eventually engage to local projects as a Façade Engineer. Over the years, involved in job site inspections, water leakage investigations and mock up test with corresponding reports.

After a few years was been assigned and was been involved with extensive exposure to plant visits in Asia and has given knowledge in material inspection and testing such as aluminum, sealant, gasket hardness, finish coating thickness and glass criteria. Eventually, was been assigned as a Consultant Client representative of full time QA/QC aluminum factory fabrication inspection in Beijing china (Jangho) and it has gave a great knowledge on the contractor's fabrication industry. Almost 10 years, by joining on façade contractor industry, the knowledge of problem solution has been developed on the fabrication and installation of the façade, such as installation of panel, installation of embedment and layout, site survey verification, fabrication drawing as per site condition, shop drawing RFI/RFA with including coordination to Site, Architect and Consultant.

Experience

Facade Designer - SINCERE FAÇADE INNOVATION INC. - 10th floor Unit 1003, One Corporate Center, Corner Doña Julia Vargas Meralco Avenue Ortigas Center, Pasig City, Philippi

(2017-01 - 2023-10)

  • SM MEGA TOWER - Edsa Ortigas Center Mandaluyong City Philippines - Architect: ARQUITECTONICA - Preparation of shop drawing, Fabrication Drawing, RFI / RFA, Site Verification layout and Involved in Coordination
  • ABENSON QUEZON AVE. - Quezon Avenue cor. Scout Albano Quezon City, Philippines - Architect: Leonardo A. Poco - Preparation of shop drawing, Fabrication Drawing, RFI / RFA, Site Verification layout and Involved in Coordination
  • ABENSON Greenhills - Ortigas Avenue Greenhills San Juan City, Philippines - Architect: WTA architecture + design studio - Preparation of shop drawing, Fabrication Drawing, RFI / RFA, Site Verification layout and Involved in Coordination
  • ABENSON Munoz - Lot9 blk b-3.Dangay st., Vetarans Village Project 7 Quezon City, Philippines - Architect: ADGO Architect - Fabrication Drawing, RFI / RFA, and Involved in Coordination

Facade Technician III - OVERGAARD TECHINICAL SERVICE INC - 6th floor Regis Bldg 327 Katipunan Avenue Loyola Heights Quezon City, Philippines

(2013-01 - 2016-12)

  • School of Music Replacement Facility - Iowa City, Iowa, USA - Architect: Neumann Monson - Preparation of shop drawing, assembly and Fabrication Drawing
  • River Edge Building - N. 42nd Street & Council Bluffs, Iowa, USA - Type: Aluminum Rain Screen Panel - Assembly and Fabrication Drawing
  • 4H Renovation and NIC Building - Nebraska Nova, Lincoln; NE, USA - Type: Unitize Curtain Wall - Assembly and Fabrication Drawing
  • Employers Mutual Casualty Company - 219 8 th Street Facility Des Moines, Iowa, USA - Type: Unitize Curtain Wall - Assembly and Fabrication Drawing
  • Marin Health care District Hospital Replacement Bldg - 250 Bon Air Road Green Brae; CA, USA - Type: Unitize Curtain Wall - Assembly and Fabrication Drawing

Facade Engineer / Design Engineer - ALT Cladding INC. - 8th floor Marajo Tower 312 26th street West corner 4th Fort Bonifacio Global City, Taguig City Philippines

(2007-01 - 2013-12)

  • Rockwell Center - Makati City, Philippines - Glass unitized curtain wall and unitized window wall system - Architect: Skidmore Owings & Merrill LLP
  • The Residences at Greenbelt - Makati City, Philippines - Residential - Architect: GF & Partners, Architects Philippines
  • Ocean Star Building - Manila, Philippines - 1 Commercial/ Office Tower - Architect: Aidea
  • CVC LAW - Manila, Philippines - Office Towers - Architect: PRSP
  • Gateway Tower 2 - Manila, Philippines - Mixed Use Development - Architect: Araneta Center Inc.
  • Sunlife Building - Manila, Philippines - Office Tower - Architect: GF & Partners, Architects Philippines
  • Commercial Market Authority - Riyad, Saudi Ariabia - Office Tower - Architect: Pelli Clarke Pelli Architect
  • One Central Macau - Lot B Zone B, Nape Macau - Office Tower - Architect: Kohn Pedersen Fox Associates
  • Eton Dalian II - Dalian China - Mixed Use Development - Architect: NBBJ Architect
  • Shanghai Jin Hongqiao International Center - Shanghai China - Office Tower - Architect: John Portman and Associates
  • Civic Cultural Retail Complex - Suntel City, Singapore - Mixed Use Development - Architect: Aedas

Space Planner - Design By E.B.D. Interior Inc. - Unit 317-A LRI Business Plaza, 210 N. Garcia St., Bel-Air Village Makati City

(2006-01 - 2007-12)

Design and Construction w/ Involve in Office partition and Furniture

Curtain Wall Cad Designer - UNIWORLD DESIGN CONCEPT - 77 Arcade Bldg., Lot 6, Blk.8 Felix Avenue, Cainta, Rizal

(2004-01 - 2005-12)

Façade Contractor (base on dubai)

  • Dubai International Airports. Dubail U.A.E.
  • Al Kharafi Office Bldg.. Al-Qibla, Kuwait

Project in Charge - ACECOM Builder Inc. - Unit 203, Richworld Bldg. 8060 Estrella St. San Antonio Makati City

(2001-01 - 2002-12)

Glass, Aluminum, Composite panel fabrication and installation, Stainless steel and Metal works

  • Ferndale Homes Phase 3 with 72 housing units - Brgy. Pasong Tamo Quezon City
  • MRT Ayala Terminal - Edsa Makati City
  • Macea walk way - Dela Rosa street Makati City
  • Jade Computer Center - Katarungan street Mandaluyong City
  • Ayala Underpass - Ayala avenue Makati City
  • Two Storey Residence - Block 4, Lot 20,22,24,26 Rambutan Street Ayala Westgrove Heights, SilangCavite
  • Project coordination, Estimating of materials, Preparation of Schedule, Preparation of Shop Drawing, Supervision of worker and Quality Control

Assistant Project Architect - GEORGE'S EMPIRE GLASS and ALUMINUM Inc. - Cordillera Street Quezon City

(2000-01 - 2001-12)

Glass, Aluminum and Composite panel fabrication and installation

  • Philips Semiconductors, Phase 2 LISP 2 - Calamba, Laguna - Preparation of Shop Drawing, Estimating of materials, Supervision of worker and Quality Control

Design Coordinator, Cadd Detailer - HELDEN CONSTRUCTION CORPORATION. - Unit 4 & 6 2nd Flr. Facilities Centre 548 Shaw Blvd. Highway hills Mandaluyong City

(1999-01 - 2000-12)

Construction Firm

  • Design coordination, Preparation of Shop Drawing and Supervision

Structural Cad Detailer - NIC Corporation - 21st Floor Citiland 10 Tower 2, H.V. Dela Costa street cor. Valero street Salcedo Vill. Makati City

(1998-01 - 1999-12)

Fabrication of Structural Metal works

  • Preparation of Shop Drawing and Detailing

Auto Cad Designer - ARADS and ASSOCIATE - 4th Floor Strata 200 Bldg., .Ortigas Complex Pasig City

(1997-01 - 1998-12)

Architectural Design Firm

Auto Cad Designer - ALBERT S YU and ASSOCIATE - Protacio street, Pasay City

(1996-01 - 1997-12)

Architectural Design Firm

  • Design coordination, Preparation of Architectural plans and Details

Education

Bachelor of Science - Architecture - Central Colleges of the Philippines (1989-01 - 1996-12)

Secondary - Marikina High School (1985-01 - 1989-12)

Elementary - Sto. Nino Elementary School (1979-01 - 1985-12)

Skills

Facade Designer

Reviews