CAD Operator (Structural) - Katahira & Engineers International - 21F, Unit 2103 T Podium West Tower, J. Vargas Ave. Ortigas Center Mandaluyong City
(2026-02 - 2026-04)
- Preparation of drawings and detailing for Bridges to be submitted as Design Drawings for 'as Issued For Construction' as well as the schedule of reinforcements and rebar quantities of each bridge.
AutoCAD Operator/Draftsman - Sta. Clara International Corporation - 2nd Flr. Highway 54 Bldg. No. 986 Stanford, EDSA Mandaluyong, City
(2023-09 - 2026-01)
Name of Project: Construction of Roads, Building Offices, Utilities (Drainage System, Sewer, Water & Fire Protection System, Power Distribution System, Road Lighting System) & Preparatory Works at Morong Discovery Technology Park. Municipality of Morong, Bataan Philippines
- Preparation of shop drawings and detailing for Architectural works such as Façade, Aluminum Cladding's Doors & Windows and Fit-out works.
- Civil works such as coordinates and setting-out points, horizontal and vertical alignments for roads.
- Structural works with Reinforcing Schedules (Bar Cutting List) and Provide plans with coordination to other disciplines to be submitted and approved for site executions/constructions.
- Gathers data from survey team or provide coordinates for setting out points location of the structures to be submitted and approved as Shop Drawings and provide for site construction.
- Assisting for Quantity Take-offs.
AutoCAD Operator - Midmac Contracting Company W.L.L. - P.O. Box 1758, Doha Qatar
(2013-09 - 2023-07)
Multiple projects including: Construction of Qatar Distribution Company Retail &
• Warehouse Facility (October 2022 to August 2023)
• Design and Construction of Industrial &
• Mubaireek Interchange (September 2020 to October 2022)
• Lusail Development Primary Infrastructure and Landscaping Construction CP08A-1 &
• CP08A-2 (May 2016 to September 2020)
• Renovation of Khalifa International Stadium (March 2014 to April 2016)
• Workers Hospital and Integrated Health Center (September 2013 to February 2014)
- Preparation of shop drawings and detailing for Architectural, Civil, Structural & Mechanical-Electrical works.
- Provide plans with coordination with other disciplines submitted and approved for site construction.
- Gathers data from survey team or provide coordinates for setting out points location of the structures and submitted and approved as Shop Drawings and provide for site construction.
- Preparation of Shop Drawings for Structural Reinforcement with BBS (Bar Bending Schedule) Cutting List.
- Preparation of AS Built Drawings, Red Lines as requirements of the Projects.
- Quantity Take-offs.
AutoCAD Operator - Sta. Clara International Corporation - 2nd Flr. Highway 54 Bldg. No. 986 Stanford, EDSA Mandaluyong, City
(2011-06 - 2013-09)
Multiple projects: 14-Megawatts Hydro Electric Power Plant Project (Sabangan, Mountain Province); MSI Cignal Head-End Building Project (Sta. Cruz, Porac, Pampanga); Highway 54 Building General Renovation Construction Project (EDSA Mandaluyong, City); S&R Membership Shopping Pampanga (Olongapo-Gapan Road)
- Gathers data from survey team or provide coordinates for setting out points location of the structures to be submitted and approved as Shop Drawings and provide for site construction.
- Prepares Shop drawings for reviews and approved by the consultant as requirements for site construction.
- Preparation of Shop Drawings for architecture and Structural disciplines as well as shop drawings for Reinforcement with Bar Bending schedules or cutting list.
- Preparation of AS Built Drawings and submissions as a requirement for completion of the projects.
- Assisting for Quantity Take-offs.
AutoCAD Operator - Hanjin Heavy Industries & Construction Co. Ltd. - 1128 University Parkway North Bonifacio Global City Taguig 1634
(2009-11 - 2011-06)
Name of Project: MICT (Manila International Container Terminal) Bert 6 Project Hanjin HIC - EEI Corp. Joint Venture, North Harbor, South Access Road, Manila
- Preparation of Shop drawings as requirements for site construction.
- Preparation & Detailing shop drawings for Drainage Systems and Plumbing works for Sewer lines, Coordinating with other services.
- Preparation of Shop Drawings, Civil works and Structural Reinforcement with Bar Bending Schedule or Cutting List.
- Quantity Take-offs for all pay items such as excavation and embankment, reinforcements & concreting Computations.
AutoCAD Operator/Draftsman - Obayashi Corporation - 9th Floor, National Life Insurance Bldg. Ayala Ave. Makati City
(2007-02 - 2009-09)
Name of Project: SCTEX (Subic-Clark-Tarlac Expressway Project, Subic-Clark Section) KOJM (KAJIMA-OBAYASHI-JFE-MITSUBISHI) Joint Venture
- Gathers Data from the surveyor, analyzed and interprets structural design drawings in order to produce accurate and checked/detailed shop drawings for AS-Staked/AS Built, Cross Sections, Plan & Profile for Earthworks Layout Plan for Toll Offices.
- Prepares Shop drawings for reviews and approved by the consultant as requirements for construction.
- Prepares Shop drawings of structures, Steel Bridge, Bridges PSCG/RCDG, Underpass, RC Box/Pipe culverts, with steel reinforcements and complete instructions for cutting, punching, welding and bolt requirement based on the given criteria in the structural design standards and erection processes.
- Updates Drawing, for Shop Drawing on the Structural Shop drawings including revisions for AS Built.
- Quantity take-offs and Calculations of all pay items such as excavation and embankment, concrete and reinforcement bar cutting list computations.
Safety Officer - Italian-Thai Development Public Co. Ltd. - Suit 1418 14th Floor, Tektite Tower, Ortigas Center, Pasig City
(2000-01 - 2006-03)
Name of Project: Lilo-an – San Ricardo Arterial Road Link Project (Lilo-an, Southern, Leyte)
- Safety Procedures in all aspects of works, especially in works at excavated area confined space, hot works and works at height, using (PPE's) Personal Protective Equipment.
- Risk assessment Inspection and Checklist of areas prone to accident or near misses.
- Discuss the whereabouts procedures using safety tools and techniques during tool box meeting.
- Strictly complied with working without PPE's and submissions of reports ahead of the schedule.