Karl holds a Bachelor of Science in Electrical Engineering and a Vocational Certificate in Industrial Instrumentation. He has 14 years of local work experience specializing in Construction Safety and is a DOLE Accredited OSH Practitioner. He passed the Lead Auditor Course of ISO 45001:2018, a CQI-IRCA accredited with Identification no 255975, as well as the Radiation Safety Officer examination under the Philippine National Research Institute and the International Safety Certification for Registered Safety Officer examination under the IBOESH United States.
I've worked on a variety of infrastructure projects. The Manila International Airport Land Reclamation, Angat Water Aqueduct Tunnelling, Novaliches to Balara Tunnelling, Leyte Geothermal Power Plant, NGCP Transmission Line Tower, and Manila International Airport Project are just a few of the notable projects I've worked on as a Safety Practitioner.
Experience
1. Surbana Jurong -Senior Safety Supervisor
Date of Employment: May 17,2021 – Present
- HSE Supervisor (Coastal Engineering/ Infrastructure Division) – Client Representative in the Project Development of Manila International Airport (MIA)
- Dredging and Sand Supply
- Land platform (land development and ground improvement work)
- Shoreline coastal protection (rock works) including coastal and river revetments
- River dredging areas
- Marine facilities
Date of Employment: November 11, 2019 – May 24, 2020
- Safety Lead – Site Preparation and Construction of Norwegian Cruise Line Project
- Pre-construction Site Preparation
Date of Employment: November 25, 2010 – October 15, 2019
Project handled during employment in First Balfour:
Date: August 2019 – Oct.15, 2019 ( ESH Lead - Erection and Construction for the HERMOSA – SAN JOSE 500kV Overhead Transmission Line Project)
- Foundation Works and Erection of Transmission Tower Line
- ESH Lead - Leyte Geothermal Business Unit (LGBU) Project – Geothermal Project ( Various Hook up and Landslide Mitigation Projects)
- Mechanical Works / Hook Up Project (300 meters 16 diameter pipeline)
- Pipe Bridges
- Landslide Mitigating Measure
- Mass Excavation Works for Outlet Structure and Road Preparation for Intake Structure
- Site Preparation for Tunnel Boring Machine Access including Railway
- Construction of Tunnel Boring Machine Launching Chamber
- Construction of Transition Basin & Conveyance Channel, Overpass Bridge, Reinforced Concrete Box Culvert
- Construction of 865 Linear Meter 2-Lane Road Row to Inlet Area
- Slope Protection of surface areas through rock bolt and soil nailing
- Site Preparation of FPIP-II and FPIP III Expansion
- Construction of VEHICULAR Subway & PEDESTRIAN Underpass
- Road Construction including utilities
- Site Preparation of TSI-CFPP Project
- Bridge Construction
- Construction of Water Tanks
- Construction of 5km River Improvement, Riprap and Gabions.
- Pile Driving and Pile Load Testing of up to 700 Tons applied load.
- Site Preparation of 27 Hectares Project Site and Construction of Manufacturing Plant Building, Warehouse, Roads, Canals.
- ESH Officer – FPIC WEST TOWER RESTORATION PROJECT
Date: November 25, 2010 – April 17, 2011 (Construction and Rehabilitation of FPIC Oil and Gas Pipeline Facility.)
4. KEPPEL BATANGAS SHIPYARD (ESH Officer in Ship Building, Design and Construction)
Date of Employment: November 2008 – March 2010
- Ship Building and Ship Repair
- Ship Building and Ship Repair
- Construction of Foot of Rig
- Sand Blasting and Painting
- Actual Fire Fighting experience.
- Handles LPG, Reefer, Cargo, Tug Boats, Barge and Oil Tanker Ships
- Commissioning and Repair of Barge Power Plant.