Estimator - Emapta Versatile Services Inc
(2025-11 - 2026-03)
- Review architectural and construction drawings to produce comprehensive cost estimates and project quotes.
- Bespoke quoting – generate detailed estimates for standard fixtures and specialized custom systems.
- Utilizing Hubspot, trainual, sharepoint for seamless quoting, data inout, and realtime job tracking.
- Partner with sales and project teams to clarify project scopes and align pricing with client expectations.
- Identify potential cost-saving opportunities and proactively flag risks or anomalies in technical specifications.
- Design washroom system in the web configure tool.
Estimator - Painting Company (AU)
(2024-10 - 2025-10)
- Reviews and interprets plans according to the project details, finishes and substrates
- Markup plans using Bluebeam – for painting, floor coating (epoxy, sealers), wallpaper and linemarking.
- Manually transfer quantities in MS Excel and input paint prices, spread and production rates
- Request Paint, Wallpaper and Floor Coating prices to suppliers
- Create a quotation email with list of quantities to be sent out
- Randomly participate on handover meetings with site supervisor
Estimator II (Waterproofing and Concrete Treatments) - Cloudstaff Philippines (AU/NZ Client)
(2020-07 - 2024-09)
- Reviews and interprets plans according to the product specifications and project requirements – covered Carparks, Warehouse, Aged Care, Childcare, Hotels, Apartments, etc.
- Prospecting projects in E1 (Australia) and BTSL (NZ).
- Prepares markup plans using Bluebeam Revu, identifying different types of floor covering/finishes for easier estimate and proposal.
- Prepares proposal suited to the clients' and projects' requirements.
- Manage and update project status using Pipedrive and Trello.
- Sending out proposals via Pandadoc and MS Office Suite.
- Submits a weekly and monthly report in Excel for the summary of priced projects per state.
Project Control Group Head/Scheduler - Phenix Garuda Construction & Devt Corp
(2017-03 - 2020-06)
- Responsible for the overall project planning and directing of the engineering execution aspect within the framework of the policies and objectives of the Company and the project to satisfy the customer's expectations.
- Coordinate the construction control effort between job site and project control staff about the schedule and progress of the project.
- Preparation of project correspondence.
- Performs estimates to determine project accomplishment, incorporating it with the bill of quantities.
- Preparation of project schedule, s-curve, progress reports and look-ahead schedules.
Planner/Scheduler - Meralco Industrial Engineering Services Corporation
(2016-06 - 2017-02)
- Prepares and manages overall master schedule integrating work breakdown structure using Primavera P6.
- Works with engineering management and PMO in the development of work breakdown structure for progress management, scheduling, cost estimating and project control.
- Prepares estimation and schedule bar chart plan considering all inputs (work force, equipment and materials) availability, production and construction sequences.
- Prepares and updates one-month look-ahead schedule that reflects the priority activities.
- Develops and implements plan versus actual progress charts (histograms/S-Curves). Reports and analyzes deviations from plan.
- Liaises with all team leaders and/or members to communicate required completion dates and interface between engineering team and the PMO.
Construction Superintendent Structural and Architectural - Hilmarc's Construction Corporation
(2013-08 - 2016-06)
- Prepare estimate for the materials needed – formwork, floor, wall and ceiling finishes
- Prepare request for the materials needed based on the approved master schedule.
- Regular coordination and reconciliation with site warehouse regarding actual delivery against the requirements/ordered materials.
- Implement plans on site.
- Supervise construction workers.