Skip to main content
Paolo Esconde

Paolo Esconde

Field Supervisor / Autocad Operator

Talent
Work from HomeMember since June 1, 2026
Autocad 2D&3DMS OfficeSketch UpCanvaInstrument/Device/Pipe Fit UpInstrument/Equipment Installation LayoutP&ID Layout and InspectionVisual checking and plan development
·

Hire this person

Send a job offer directly to this candidate

Autocad 2D&3DMS OfficeSketch UpCanvaInstrument/Device/Pipe Fit Up

About

Project: Additional Boiler Cleaning Devices

Experience

Field Supervisor / Autocad Operator - EPC & I Corporation / B&W (Babcock & Wilcox) Project - Cabuyao City, Laguna / GNPD, Mariveles Bataan

(2024-08)

Project: Additional Boiler Cleaning Devices

  • Preparation of drawings for mechanical, civil/structural design and lifting plan.
  • Equipment Layout for Additional Sootblower, Steam Pipe Line for Sootblower.
  • Maintenance Platform for Additional Sootblower, Rear Support for Additional Sootblower.
  • Service Air and Instrument Air Pipe line for Hydrojet & Hydrojet Retractable.
  • Maintenance Platform and Rear support for the Additional Hydrojet/Hydrojet Retractable.
  • Lifting plan for Sootblowers, Hydrojet/Hydrojet Retractable and Structural Materials.
  • Shop drawing, IFC(issued for construction) drawings and as-built drawings as required during project construction, visits construction sites to perform measurements and calculate dimensions as needed.
  • Leading the team for the layout of the centerline and elevation of lance tube and poppet valve of sootblower for installation of additional sootblower considering the hot and cold condition of the boiler before the installation.
  • Layout for the rear support of the additional sootblowers.
  • Spearheaded the installation of additional sootblowers.
  • Installation of additional sootblower and hydrojet/hydrojet retractable maintenance platform.
  • Installation of Rear Support for additional sootblower and hydrojet retractable.

AutoCad Operator - Elmec Construction and Inc. - Los Baños, Laguna / Sampaloc, Tanay, Rizal

(2024-04 - 2024-08)

Project: Housing Renovation

  • Preparation of drawings for mechanical, electrical civil/structural and architectural design.

AutoCad Operator - Mecel Construction & Electrical Inc. - Los Baños, Laguna / Sampaloc, Tanay, Rizal

(2022-11 - 2024-04)

Project: Tanay E-beam and Cold Storage Facility

  • Preparation of shop and as-built drawings as required during project construction.
  • Mechanical, Fire Protection, Plumbing and HVAC
  • Electrical (Auxiliary, Power, and Lightings)
  • Civil, Structural and Architectural
  • Provides and secures signed drawings for future reference.
  • Visits construction sites to perform measurements and calculate dimensions as needed.
  • Assist Site Engineers in equipment fit outs.
  • Perform other duties as assigned relevant to the role.

Education

Bachelor of Science - Civil Engineering - Technological Institute of the Philippines (2022-06)

Skills

Field Supervisor / Autocad Operator

Reviews