Site Engineer - CAVDEAL - Pasay City to Sucat, Parañaque
(2008-08 - 2009-01)
- Repair/Rehabilitation of SLEX East and West Service Road from Pasay City to Sucat, Parañaque - Contract Amount: P305,000,887.21 - Scope of Work: Road/Drainage/Sidewalk
ENGINEER I - DPWH-BOC
(2009-11 - 2012-08)
Review and recommend for approval of documents by the Department of Public Works and Highways thru Bureau of Construction (BOC) such as: Contract Agreement, Program of Work (POW) and Approved Budget for the Contract (ABC), Variation Order, Time Suspension/Resumption and Time Extension, PERT – CPM together with Bar Chart with S-Curve, Monthly Manpower and Equipment Utilization Schedule. Assist in the preparation of standard cost sheet/unit cost/cost estimation manual currently using by the Department of Public Works and Highways for Road and Bridges.
- Construction Improvement of Ternate Nasugbu Road (Km.94+112 – Km. 99+991), Ternate Cavite - Contract Amount: P745, 180,799.99 (2009-2012) - Scope of Work: Tunnel, Road and Bridge Project
Engineering Head/Operations/Project Manager - MSB Vitug Construction
(2012-08 - 2020-12)
Review documents prior to approval of General Manager such as Bidding Proposals, Cost Estimates and Project Implementation Schedule. In-charge on various project operations of Mark Stephen Basi Vitug Construction (MSB Vitug Construction) who's currently a Large B or Triple A Contractor.
- Dredging/Deepening of Napindan River along Napindan Hydraulic Control, Pasig City - Contract Amount: P46,585,281.46 (September 12, 2012 – January 17, 2012) - Scope of Work: Dredging/Desilting
- Proposed Dredging of Mouth of Buli Creek, Sta. 2+850 – Sta. 2+950, Cainta River, Sta. 4+400 – 4+450, Pasig City - Contract Amount: P46,095,326.64 (February 05, 2013 – June 05, 2013) - Scope of Work: Dredging/Desilting
- Propose Dredging/Deepening of Marikina River, Sta. 5+200 to Sta. 6+100, Upstream of Rosario Bridge - Contract Amount: P47,000,494.78 (May 16, 2013 – September 13, 2013) - Scope of Work: Dredging/Desilting
- Proposed Installation of Pumps and Its Facilities/Appurtenances @ Malcañang Compound, Manila - Contract Amount: P29,228,033.53 (March 26, 2013 – May 21, 2014) - Scope of Work: Pumping Station
- Proposed Construction of Revetment with Pile Cap along Pasig River at the Malacañang Palace Heroes Hall - Contract Amount: P51,447,464.63 (March 27, 2013 – June 21, 2014) - Scope of Work: Revetment Wall
- Dredging and Riprapping of Estero de Maypajo, Tondo, Manila - Contract Amount: P18,277,805.51 (November 28, 2013 – June 22, 2014) - Scope of Work: Dredging/Desilting/Slope Protection
- Dredging and Riprapping of Estero de Sunog Apog, District II from Sta, 0+525 to Sta. 1+200, Tondo, Manila - Contract Amount: P21,753,730.08 (December 03, 2013 – July 06, 2014) - Scope of Work: Dredging/Desilting/Slope Protection
- Proposed Excavation/Desilting of San Juan River, San Juan City, Sta. 0+350 – Sta. 0+700 - Contract Amount: P41,327,356.03 (December 22, 2013 – April 22, 2014) - Scope of Work: Dredging/Desilting
- Improvement/Desilting of Don Galo River Parañaque River South Junction (East Side), Parañaque City - Contract Amount: P44,390,115.90 (July 22, 2015 – April 17, 2016) - Scope of Work: Dredging/Desilting/Revetment Wall
- Kamanava Flood Control Project, Sealing/Raising of Riverwall Including Upgrading of Pumping Station and Flood Gate, Malabon City - Contract Amount: P44,008,121.88 (August 27, 2015 – January 24, 2016) - Scope of Work: Dredging/Desilting/Revetment Wall
- Upgrading of Luneta Pumping Station (Expansion Including Drainage Area Improvement, Manila - Contract Amount: P43,633,431.39 (November 02, 2015 – April 30, 2016) - Scope of Work: Pumping Station
- Proposed Sump Pit Construction and Installation of Pumps and Its Facilities/Appurtenances @ Harborview, Manila - Contract Amount: P43,147, 996.21 (November 02, 2015 – April 30, 2016) - Scope of Work: Pumping Station
- Improvement/Desilting of Mangahan Floodway, From Km. 00001+485 to Km. 0001+185, Pasig City - Contract Amount: P86,802,112.90 (December 01, 2015 – September 16, 2016) - Scope of Work: Dredging/Desilting
- Proposed Drainage Improvement Works Around Area 4 (PSG Compound, Paco, Manila) - Contract Amount: P87,762,497.69 (January 08, 2016 – October 04, 2016) - Scope of Work: Drainage/Pumping Station
- Construction of Pumping Station @ Barangay Salapan, San Juan City - Contract Amount: P36,630,910.58 (January 04, 2017 – October 31, 2016)
- Construction/Improvement of Catbalogan City Drainage System, Including Antiao River Control, Catbalogan City, Samar - Contract Amount: P178,954,077.69 (February 06, 2017 – March 04, 2019) - Scope of Work: Drainage/Desilting/Revetment Wall
- Construction of Revetment along Angat River Caniogan Section, Calumpit, Bulacan - Contract Amount: P32,531,622.48 (March 12, 2017 – August 17, 2017) - Scope of Work: Drainage/Revetment Wall
- Agno River Basin Flood Control Project (Phase I) – Construction of Protection Works Using Gabions and Mattresses, Pangasinan - Contract Amount: P363, 199,980.52 (February 06, 2017 – October 16, 2018) - Scope of Work: Slope Protection/Dike
- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Completion of Flood Mitigation Structure along Laoag-Bongo River, Laoag city Section and San Nicolas Section, Ilocos Norte - Contract Amount: P96,499,329.74 (April 19, 2017 – December 12, 2017) - Scope of Work: Drainage/Slope Protection
- Construction of DSWD (Main Building) - Contract Amount: P155, 000,000.00 (August 14, 2017 – March 15, 2021) - Scope of Work: Building
- Construction of Estero de Sunog Apog Pumping Station, Hermosa Street, Tondo Manila - Contract Amount: P640,668,231.00 (January 16, 2018 – August 14, 2019) - Scope of Work: Pumping Station
- Pasig-Marikina River Channel, Improvement Project, Phase V Contract Package 2 and 3 Improvement Works along Upper Marikina River Upstream of Marikina Bridge, Sta. 14+1000 to Sta. 15+450, Marikina City - Contract Amount: P714,732,784.62 (February 08, 2018 – January 22, 2021) - Scope of Work: Dredging/Desilting/Slope Protection/Revetment Wall
- Construction/Improvement of Catbalogan City Drainage System, Including Antiao River Control, Catbalogan City, Samar - Contract Amount: P440,240,301.92 (July 06, 2018 – November 09, 2019) - Scope of Work: Dredging/Desilting/Drainage/Revetment Wall
- Construction/Improvement of Catbalogan City Drainage System, Including Antiao River Control, Catbalogan City, Samar - Contract Amount: P445,294,256.15 (March 04, 2019 – December 22, 2020) - Scope of Work: Protection Dike/Seawall/Breakwater
Freelance contractor - Freelance - Region 8
(2020-01 - 2021-12)
- Various towers/cellsite in Region 8 and Certain Building Project and Flood Control projects under NIA
Marketing and Operations - Supersystems Tooling and Metal Fabrication (STMFI), Worthwinning Construction and Development Corporation (WCDC), Quick Safe Travel and Logistics (QSTL)
(2022-01)
- Construction of Sky City Hall Building (Phase 1) Barangay San Andres, Catbalogan City, Samar - Contract Amount: P139,000,000.00 - Scope of Work: City Hall (Building) - Status: Completed
- Antiao Riwarwalk (Ecolearning Center and Community Park, Barangay San Pablo, Catbalogan City, Samar) - Contract Amount: P16,315,760.00 - Scope of Work: Concrete Pavement (Linear Park) Metal Fabication, Solar Ligting Installation and Riverwall Concreting - Status: Completed