Cnc laser programmer - Awal Refrigeration Conditioning Repair - Bahrain, sitra
(2025-01)
- Evaluated and developed existing engineering systems and executed various engineering experiments
- Increased production efficiency by 15% through strategic minimization of bottlenecks
- Ensured timeliness of projects and strict adherence to government safety guidelines
Cnc laser programmer/operator - JMT modular interior - Genti deleon Valenzuela
(2024-07)
- Nesting
- Cad
- Operating
- Simulation
- Programming
Laser machine programmer/operator - Gomeco metal corporation - Malinta Valenzuela manila Philippines
(2023-12 - 2024-07)
- Programming
- Nesting
- Cad
- Operating cnc laser machine
Designer/Autocad - Trend technologies - Malaysia
(2020-03 - 2023-11)
- Evaluated and developed existing engineering systems and executed various engineering experiments
- Increased production efficiency by 15% through strategic minimization of bottlenecks
- Ensured timeliness of projects and strict adherence to government safety guidelines
- Liaised between design, production, and quality control teams to ensure that the highest standard of quality was met at each stage of development
- Consistently maintained a record of <%5 production error through the expert care and precise handling of equipment
- Researched new developments and innovations, compiling and distributing an average of 3 reports/year to the team
Programmer - Modern steel world - Saudi Arabia
(2012-06 - 2019-11)
- Increased production efficiency by 15% through strategic minimization of bottlenecks
- Ensured timeliness of projects and strict adherence to government safety guidelines
- Liaised between design, production, and quality control teams to ensure that the highest standard of quality was met at each stage of development
- Consistently maintained a record of <%5 production error through the expert care and precise handling of equipment
- Researched new developments and innovations, compiling and distributing an average of 3 reports/year to the team
Cadcam Programmer - Galva coat industries - United arab emirates
(2010-03 - 2012-04)
- Create 2d cad drawings, simulation
- Increased production efficiency by 15% through strategic minimization of bottlenecks
- Ensured timeliness of projects and strict adherence to government safety guidelines
- Liaised between design, production, and quality control teams to ensure that the highest standard of quality was met at each stage of development
- Consistently maintained a record of <%5 production error through the expert care and precise handling of equipment
- Researched new developments and innovations, compiling and distributing an average of 3 reports/year to the team