SUMMARY:
Construction Piping Foreman adept at finding engaging ways to motivate construction teams to exceed expectation and maintain high standards. Over 21 years of comprehensive piping experience in Oil & Gas, Power & Desalination Plant, Petrochemical Fields.
SKILLS:
Construction Skills, Communication Skills, Technical Skills, Management Skills.
WORK EXPERIENCES:
Position: Piping Foreman
June 2020 up to Present
Company Name: ABCD Saudi Bin laden Groups of Company
Project Name & Address: King Abdul-Aziz International Airport project
Jeddah, Saudi Arabia
DUTIES & RESPONSIBILITIES:
- Supervise & layout of chilled water line, water line, pumps, fire protection installtion and fabrication.
- To produce quality workmanship in accordance with specification as per plan.
- Responsible in the erection & installation of 6ӯ to 10ӯ carbon steel pipe of the Chilled water pipe at the pump area.
- Responsible in the erection & installation 2ӯ to 6ӯ of chilled water pipe at the AHU area.
- Responsible in the erection & installation of 1ӯ to 8ӯ carbon steel pipe of fire fighting pipe.
- Responsible in the installation of supports, clamps, brackets and hangers, and rigid supports
- Responsible to implement the safety rules and regulation
Position: Piping Foreman
August 2017 - May 2020
Company Name: Advance Vision Saudi Bin laden Groups of Company
Project Name & Address: King Abdul-Aziz International Airport project
Jeddah, Saudi Arabia
DUTIES & RESPONSIBILITIES:
- To produce quality workmanship in accordance with specification as per plan.
- Can read and interpret fire protection, architectural, and structural plants and specifications.
- Prepared and assembled for installation by cutting, threading. and grooved the pipe.
- Responsible for the erection & installation main chilled water pipe 8ӯ to 12ӯ to 20ӯ carbon steel pipe at the Main header room area.
- Responsible in the erection & installation of 4ӯ to 10ӯ carbon steel pipe of the fire fighting pipe.
- Responsible for the installation of the clamps, brackets and hangers support and rigid support.
- Responsible to implement the safety rules and regulations.
Position: Piping Foreman
October 2014 - October 2015
Company Name: Hyundai Engineering & Constructing
Project Name & Address: Borouge-3 Utilities & Offsite Project
Al- Ruwais Abu Dhabi, United Arab Emirates
DUTIES & RESPONSIBILITIES:
- Interpret & understanding stiches given by Supervisor indeed for fabrication or erection.
- To produce quality workmanship in accordance with specification as per plan.
- Responsible in the erection & installation of 6ӯ to 12ӯ stainless steel pipe at the pipe rack area.
- Responsible in the erection & installation of 10ӯ to 18ӯ chrome alloy steel pipe at the flare area.
- Responsible in the erection & installation of 4ӯ to 12ӯ carbon steel pipe at the pipe rack area.
- Fabrication & installing of small bore 1/2ӯ to 2ӯ pipe.
- Hoisted loads using slings, chains, shackles, hocks, cables, and other rigging equipment.
- Responsible to implement the safety rules and regulation.
Position: Piping Supervisor
October 2011 - September 2014
Company Name: KOAM Electromechanical L.L.C
Project Name & Address: Borouge-3 Utilities & Offsite Project
Al- Ruwais Abu Dhabi, United Arab Emirates
DUTIES & RESPONSIBILITIES:
- Supervise & layout of chilled water line, pumps, fire protection installtion and fabrication.
- To produce quality workmanship in accordance with specification as per plan.
- Measure, cut, thread and grooved pipes to required shape and size.
- Responsible in the erection & installation 6ӯ to 10ӯ carbon steel pipe at the Chillier area.
- Responsible in the erection & installation 4ӯ to 8ӯ carbon steel of Chilled water pipe at the AHU area,
- Responsible in the erection & installation 1ӯ to 6ӯ of fire fighting pipe.
- Responsible in the hydro test & flushing of fire fighting piping and chilled water piping.
- Responsible in the installation of the valves, supports, hangers, clamps, brackets and rigid supports.
- Responsible to implement the safety rules and regulation.
Position: Piping Supervisor
May 2008 - August 2011
Company Name: ZENER Kiddie Fire & Security L.L.C
Project Name & Address: Dubai Electric Water & Authority Desalination Power Project
( Station “M“) Jebel Ali Dubai, United Arab emirates
DUTIES & RESPONSIBILITIES:
- To produce quality workmanship in accordance with specification as per DEWA requirement.
- Can read and interpret fire protection, architectural, and structural plants and specifications.
- Supervise & layouts of fire pumps, fire protection pipe and fabrication.
- Responsible on manpower assignment together with its proper resignation.
- Responsible in the erection & installation 2ӯ to 10ӯ of fire fighting pipe at the DFO tank area.
- Responsible in the erection & installation 1ӯ to 6ӯ of fire fighting pipe at the CCB & Tunnel area.
- Responsible for the pneumatic test & flushing of Co2 & FM200 fire suppression system.
- Responsible in the hydro test & flushing of fire fighting pipe
- Responsible in the installation of supports, hangers, clamps, brackets, and rigid supports.
- Responsible to implement the safety rules and regulation.
Piping: Piping Foreman
January 2007 - March 2008
Company Name: SAMHO Korem Tech. L.L.C
Project Name & Address: Dubai Electric Water & Authority Desalination Power Project
( Station “ L2 “) Jebel Ali Dubai, United Arab emirates
DUTIES & RESPONSIBILITIES:
- To produce quality workmanship in accordance with specification as per plan.
- Can read and interpret fire protection, architectural, and structural plants and specifications.
- Responsible in the erection & installation of 10ӯ carbon steel pipe of the Chilled water pipe line at the pipe rack area.
- Responsible in the erection & installation 4ӯ to 8ӯ of chilled water pipe at the Chiller & AHU area.
- Responsible in the erection & installation of 1ӯ to 6ӯ carbon steel pipe of fire fighting pipe.
- Responsible in the installation of supports, clamps, brackets and hangers, and rigid supports
- Responsible to implement the safety rules and regulation.
Position: Pipe Fitter
February 2005 - January 2007
Company Name: HCCT Contractor Company / SHIN Nippon Tech. L.L.C
Project Name & Address: Dubai Electric Water & Authority Desalination Power Project
( Station “ L1 “) Jebel Ali Dubai, United Arab emirates
DUTIES & RESPONSIBILITIES:
- To produce quality workmanship in accordance with specification as per plan.
- Erection & installation 6ӯ to 10ӯ carbon steel pipe of chilled water piping at the chiller area.
- Erection & installation 4ӯ to 6ӯ carbon steel pipe at the AHU units.
- Measure, cut, thread and pipes to required shape and size.
- Pneumatic test & flushing of refrigerant pipe.
- Hydro test & flushing of chilled water pipe.
- Fabrication & installation of supports, hangers, clamps, brackets, and rigid supports.
- Most work safety and efficiency.
Piping: Piping Foreman
September 2004 t - January 2005
Company Name: D+G Contractor Company
Project Name & Address: Air Liquid Philippine, Oil & Gas project
Baunoy, Balamban Cebu, Philippines
DUTIES & RESPONSIBILITIES:
- To produce quality workmanship in accordance with specification as per plan.
- Identify of materials and be able locate it’s size.
- Double checked all coordinates and elevations.
- Responsible for the erection & installation of 4” Ø to 24”Ø pipe at the pen fan cooling tower area.
- Responsible for the fabrication & installation of all small bore pipe.
- Responsible for the erection & installation of 6” Ø to 10”Ø gas line at the pipe rack area.
- Install of the dummy leg supports, and rigid supports.
- Most work safety and efficiency.
Position: Pipe Fitter
February 2003 - August2004
Company Name: Consolidated Contractors Company W.L.L / SNAMPROJITTE Engineering
Project Name & Address: Qatif Gosp-1 Refinery Oil and Gas Project
Rahema Rastanura, Saudi Arabia
DUTIES & RESPONSIBILITIES:
- Interpret & understanding stitches given by Foreman and indeed for fabrication and erection.
- To produce quality workmanship in accordance with specification as per plan.
- Identify of materials and be able to locate it’s size.
- Erection & installation of 56ӯ carbon steel pipe at the pipe main rack area.
- Erection & installation of 24ӯ alloy steel pipe at the pipe rack area.
- Erection & installation of 32ӯ heavy wall steel pipe at the pipe rack area.
- Install of the dummy leg supports, and rigid supports.
- Most work safety and efficiency.
Position: Pipe Fitter
October 2001 - November 2002
Company Name: DOTANAH Engineering & Constructing SDN. BHD
JGC / KELLOGG (Slime Consortium)
Project Name & Address: MLNG Refinery Oil and Gas Project
Bintulo, Malaysia
DUTIES & RESPONSIBILITIES:
- To produce quality workmanship in accordance with specification as per plan.
- Erection & installation of 10ӯ to 36ӯ seamless carbon steel pipe at the pen fan cooling tower area.
- Erection & installation of 8ӯ to 20ӯ stainless steel pipe at compressor area.
- Hoisted loads using slings, chains, shackles, hocks, cables, and other rigging equipment.
- Fabrication & installing of small bore 1/2ӯ to 2ӯ pipe.
- Installing of the variable spring hanger supports dummy leg supports.
- Most work safety and efficiency.
Position: Pipe Fitter
February 1999 - December 1999
Company Name: DAELIM Industrial Co. LTD
Project Name & Address: Formosa plastic Corporation / Petroleum company
Mailiao Taiwan , R.O.C
DUTIES & RESPONSIBILITIES:
- Interpret & understanding stiches given by Foreman or Supervisor indeed for fabrication or erection.
- Identify of materials and be able to locate it’s size.
- Erection & installation of 24ӯ & 30ӯ heavy wall steel pipe at the pipe rack area. And going to the guard reactor and feed furnace.
- Erection & installation of 8ӯ to 24ӯ alloy steel pipe at pipe rack area
- Erection & installation of 10ӯ to 18ӯ stainless steel pipe at pipe rack area.
- Most work safety and efficiency.
Position: Piping Foreman
October 1997 - February 1998
Company Name: EEI Corporation Inc. Philippines
Project Name & Address: J.J Summit plastic corporation / Petrochem project.
Simlong Batangas , Philippines
DUTIES & RESPONSIBILITIES:
- Interpret & understanding stiches given by Supervisor indeed for fabrication or erection.
- To produce quality workmanship in accordance with specification as per plan.
- Responsible in the erection & installation of 10ӯ to 24ӯ chrome alloy steel pipe at the flare area.
- Responsible in the erection & installation of 18ӯ seamless carbon steel pipe at the pipe rack area.
- Responsible in the erection & installation of 8ӯ to 24ӯ pipe at the compressor area.
- Most work safety and efficiency.
Position: Piping Foreman
May 1996 - September 1997
Company Name: ALC Company / Kiewit Holt Philippines
Project Name & Address: 180 Mega Watts ( 1X3 ) Luzon Geothermal power plant project.
PNOC – Mahanagdong Ormoc Leyte, Philippines
DUTIES & RESPONSIBILITIES:
- Interpret & understanding stiches given by supervisor indeed for fabrication or erection.
- Prepared welded, fabricated, installed and fit. Pipe to specifications needed to complete the works.
- Identify of materials and be able to locate it’s size.
- Calculating the cut off for fittings.
- Responsible in the installation of 3ӯ to 8ӯ stainless pipe in the lube oil line turbine generator.
- Responsible for the erection & installation of 24ӯ 30ӯ main steam pipe line, at the steam turbine generator.
- Responsible in the erection & installation of 6ӯ to 18ӯ stainless pipe at the vacuum pump to condenser area.
- Responsible in the installation of variable spring hanger supports, dummy leg supports.
- Most work safety and efficiency.
Position: Piping Foreman
December 1995 - May 1996
Company Name: ALLTECH Contractor Company / Marubeni TDK / Fuji Electric Philippines
Project Name & Address: 232.5 Mega watts (1X3) Visayas Geothermal power plant project
PNOC - Malitbog Ormoc Leyte, Philippines
DUTIES & RESPONSIBILITIES:
- Interpret & understanding stiches given by supervisor indeed for fabrication or erection.
- Identify of materials and be able to locate it’s size.
- Double checked all coordinates and elevations.
- Responsible for the erection & installation of 20ӯ to 24ӯ main steam pipe, at the steam purifier to the steam turbine generator.
- Responsible in the erection & installation of 4” Ø to 12”Ø stainless pipe at the cooling tower area.
- Responsible in the fabrication & installation of the small bore 1ӯ to 2ӯ pipe.
- Most work safety and efficiency.