Wilmar Obejas Cabada
Piping Design Engineer
Hire this person
Send a job offer directly to this candidate
About
TO BECOME A RESPONSIBLE MEMBER OF THIS REPUTABLE OF THE COMPANY WHILE MAKING FULL USE OF MY KNOWLEDGE&EXPERIENCES GAINED IN THE FIELD OF ENGINEERING IN 2D AND 3D DRAWING
Experience
Piping Design Engineer - TECNICAS REUNIDAS - 7th Floor Capital Plaza Office Tower, PO BOX 55414, Abu Dhabi UAE
(2025-03 - 2026-02)
IGDE 2 - ADNOC GAS OFFSHORE PROJECTS - DAS Island - Abu Dhabi UAE
- Modify all the pipes in 3d model as per site comments or site conditions and extracted the ISOs.
- Reroute all the pipes in 3d model if there's a clashing in the structural and all other discipline as per site conditions.
- Preparing all Hook Up drain going to close drain.
- Preparing all the Sampling Cooler Assembly going to sampling bottle.
- Re-route all the PSV lines going to Atmosphere
- Site survey to check all the piping lines to implement or execute them for Issued for Construction.
- Create a Pipe Support Primary and Secondary as per Tag Standard
- Preparing and incorporate all the comments and additional in Test Package.
- Preparing all punch list as per site comments and site supervisor comments.
- Update the Process Data for As Buit drawings as per Summary Line List.
Senior Piping Designer - FLUOR DANIEL INC. - PHILIPPINES - 7th Floor Polaris Corporate Center Filinvest Corporate City, ALABANG MUNTINLUPA CITY 1781, PHILIPPINES
(2024-11 - 2025-02)
NUSCALE ROPOWER - ROMANIA
- Modify all the pipes in 3d models as per P&ID.
- Update the 3d model in all Area's as per site condition.
- Creating Pipe Support as per Stress Isometric and Company Standards.
- Coordinates to other Discipline for all the Details Drawing.
Piping Designer - TTSJV (Technip Energies ROC) - TTSJV W.L.L MUHARRAQ - KINGDOM OF BAHRAIN
(2023-03 - 2024-10)
BAPCO MODERNIZATION PROGRAM - BAHRAIN
- Modify all the pipes in 3d model as per site comments or site conditions and extracted the ISOs to reflect in the pdf master copy with marked ups for the new coordinate's lines, new elevation lines and new branches connection.
- Reroute all the pipes in 3d model if there's a clashing in the structural and all other discipline as per site conditions.
- Site survey to check all the piping lines to implement or execute them as built drawing or Isometric drawing.
- Preparing and incorporate all the comments and additional in Test Package.
- Preparing all punch list as per site comments and site supervisor comment
Piping Engineer/Modeler - ACE WATER PTE LTD - 9 JURONG TOWN HALL ROAD #02-15 JURONG TOWN HALL SINGAPORE (609431)
(2022-06 - 2022-11)
IWMF PROJECT, TUAS SOUTH 5 SINGAPORE
- Checking all the Isometric Drawing to Incorporate the Comment.
- Checking Model Integrity and Coordinates Issues with other Disciplines.
- Modified or revised all the Piping Details and Arrangement as per comment.
Piping Designer ll - FLUOR DANIEL INC. - PHILIPPINES - 7th Floor Polaris Corporate Center Filinvest Corporate City, ALABANG MUNTINLUPA CITY 1781, PHILIPPINES
(2020-07 - 2021-07)
LNG CANADA PROJECT KITIMAT, BRITISH COLUMBIA, CANADA
- Check all the Isometric Drawing to Incorporate the Mark-Up or Comment.
- Checking Model Integrity and Coordinates Issues with other Disciplines.
- Modified or revised all the Piping Support as per mark-up or comment.
- Check and analyze all the Piping Support in the production area.
- Preparing Piping Technical Procedures for the Piping Design Layout.
- We Revise as per Test Package Verification or Design Change Notification the 3D Model for As-Built Drawing.
- Updating S3D Model and Incorporate all the Comments from the other Discipline for ISO Issuance.
- Extract or generate the ISO to issue for Construction.
Piping Designer/Lead Pipe Support Designer - SEMBCORP MARINE LTD - 29 TANJONG KLING ROAD SINGAPORE 628054
(2016-11 - 2019-11)
- TOPSIDE AND HULL - KARISH & TANIN (ENERGEAN POWER FPSO PROJECT)
- Change all the Piping Support to Special Support using AVEVA MDS.
- Create Piping Support as per Standard for Non-Critical and Critical lines.
- Checking and analyzing all the Piping Support using NAVISWORK.
- Modify in Outfitting Drafting Detail of all the Tag Support Number.
- Preparing in Excel file of Piping Support List and Piping Support MTO.
- Preparing the General Arrangement of Piping Line and Piping Support.
- Updating the Excel file of Piping Support name as per markup.
- Preparing the Piping Support details for Construction.
- Updating isometric drawing as per mark-up to prepare the pipe spool.
- Preparing all the Piping Support to Submit to the Client.
- Lead all the Support Designer/Modeler.
- P-68 TOPSIDE AND HULL PETROBRAS BRASIL (PRESALT FPSO's PROJECT)
- Checking all the Isometric Drawing to Incorporate the Mark-Up or Revision.
- Checking Model Integrity and Coordinates Issues with other Disciplines.
- Preparing Piping Technical Procedures for the Piping Design Layout.
- Preparing in Excel file if there's a New Piping line or Updated line.
- Change all the Tubing line to Pipeline as per client comment.
- Change all the Piping Support to Standard Special Support.
- We Revise as per Test Package Verification or Design Change Notification the 3D Model for As-Built Drawing
SP3D Piping Designer - FLUOR DANIEL INC. - PHILIPPINES - Asian Star Building 2402-2404 ASEAN DRIVE FILINVEST CORPORATE CITY, ALABANG MUNTINLUPA CITY, PHILIPPINES
(2013-05 - 2016-10)
- NEXUS GAS TRANSMISSION (PIPELINE PROJECT) OHIO AND MICHIGAN, USA
- We Design to route the Pipe, Large Bore and Small Bore from all Equipment (Compressor and Metering Station) going to the Pipeline.
- Developing 3D models of Process Skid Piping Layouts for Compressors at designated temporary locations for vendor guidelines.
- Checking the Piping Routine against the latest line, P&ID, Vendor Drawing and all the latest information from the other Discipline.
- Updating SP3D Model as per 30% Model Review and Incorporate all the Comments from the other Discipline.
- Updating SP3D Model as per 60% Model Review and Incorporate all the Comments from the other Discipline.
- Updating SP3D Model as per 90% Model Review and Incorporate all the Comments from the other Discipline for ISO Issuance.
- SHELL AQUARIUS (BROWNFIELD PROJECT) THE NETHERLAND
- We Design and We Revise to update all the Isometric Drawing to incorporate all the Drawings, Demolition and Pre-Fabrication in accordance to P&ID from information provided of Lead Engineer to Check and Analyze.
- ExxonMobil Chemical Company MONT BELVIEU Plant, BAYTOWN, TEXAS, USA.
- We Draw the Detail and we locate the exact Coordinates of Special Pipe Support and Calculate the weight load of Pipe Run, if Water or Chemical flow
- Incorporate all the Drawing from information provided of Lead Engineer to Check and Analyze.
- Updating SP3D Model as per 60% Model Review and Incorporate.
- Marathon FAR, (REVAMP PROJECT) HOUSTON TEXAS USA
- We updated the 3DModel for Line Checking, Clashing and (MTO) Material Take Off using SP3D and SPR, according to P&ID to incorporate all the Plan Layout and Isometric plan from information provided of Lead Engineer.
Designer 1 - JGC PHILIPPINES - 2109 Prime Street Madrigal Business Park, AYALA ALABANG MUNTINLUPA CITY, PHILIPPINES 1780
(2010-04 - 2013-04)
- BARZAN Onshore Project, (RASGAS) State of Qatar.
- Petronas, MNLG TIGA PLANT & FLOATING LNG 2 TRAIN 9 PROJECT Malaysia.
- NIPPON SHOKUBAI CO., LTD. (ARAMCO PROJECT) AL-KHOBAR 31952, K.S.A.
- USGC Petrochemicals Project for Chevron Phillips, Baytown, Texas, USA.
- Draft, Modify and Update the Piping and Instrument Diagram using Smart Plant, AutoCAD and MICROSTATION V8i.
- Drafting P&ID using SP P&ID as per Process mark-ups.
- Preparation of Process Flow drawin
Education
B.S - ELECTRONICS & COMMUNICATION ENGINEERING - UNIVERSITY OF PERPETUAL HELP SYSTEM DALTA (1998 - 2006)
