Skip to main content
Adil Afridi

Adil Afridi

Professional Civil Engineer

Talent
PeshawarMember since October 23, 2026
Professional Civil EngineerMS OfficeAutoCAD
·

Hire their services

Request a quote with no obligation

Civil Engineering,Hydropower,Power-energy sector,building/infrastructure and wat

About

Dedicated and Professional Civil Engineer with a Master’s degree in Civil Engineering (Construction Engineering & Management) and a Bachelor’s degree in Civil Engineering, with 11 years of experience in the planning, execution, and supervision of dams & hydropower, energy & power-sector, infrastructure/building projects and water resources projects. Proven expertise in project management, construction supervision, quality assurance and quality control (QA/QC), and team leadership, with a strong commitment to design standards, safety regulations, quality requirements, and project schedules.

Experience

Deputy Director (Civil), BPS-18 | Project Management Organization (PMO), KHRE - Pakhtunkhwa Energy Development Organization (PEDO), Energy & Power Department of Govt.KPK - KPK, Pakistan

(2025-09)

Projects financed by the World Bank:

  • Gabral Kalam Hydropower Project (GKHPP), (88 MW) Project Cost: PKR 84.37 Billion) (12% progress)
  • Madyan Hydropower Project (MHPP), (216 MW) Project Cost: PKR 185 Billion)
  • Batakundi Naran HPP, (236 MW) (Under feasibility Stage) (55% progress)
  • Kondia-I HPP, (545 MW) (Under feasibility Stage) (45% progress)
  • Kondia-II HPP, (181 MW) (Under feasibility Stage) (25 % progress)
  • Middle SPAT-GAH HPP, (174 MW) (Under feasibility Stage) (60 %)
  • Supervising projects under the Khyber Pakhtunkhwa Hydropower & Renewable Energy Development Program (KHRE) funded by the World Bank.
  • Conducting weekly meetings with consultants and contractors to identify challenges, bottlenecks, and issues while formulating solutions.
  • Engaging in meetings with government officials to brief them on the progress of civil components of hydropower projects.
  • Coordinate and liaise with local administration, government authorities, and local communities to facilitate feasibility studies, land-related matters, and field activities, ensuring stakeholder coordination and timely resolution of community and site-related issues.
  • Reviewing tender, construction, and shop drawings for Gabral Kalam Hydropower Project (88 MW) & Madyan Hydropower Project (216 MW).
  • Preparing technical sanctions and collaborating with various authorities for approval. Facilitating correspondence with the consultants and contractors.
  • Tracking and monitoring project schedules, timelines, and milestones.
  • Monitoring the daily, weekly, and monthly progress reports submitted by the consultants and contractors.
  • Reviewing and processing the Interim Payment Certificates (IPCs) from the Consultants and Contractors.

Assistant Resident Engineer Structures & Acting-Resident Engineer Structures - NESPAK (Mohmand Dam Consultant Group) - KPK, Pakistan

(2022-11 - 2025-09)

Mohmand Dam Hydropower Project, 800 MW. Project Cost: PKR 224 Billion | Financed by the Islamic Development Bank (IsDB), OPEC Fund for International Development (OFID), Kuwait Fund for Arab Economic Development (KFAED), and Saudi Fund for Development (SFD)

  • Oversaw construction supervision and monitoring of structures, including diversion tunnels outlet & inlet structures, dyke walls, upstream coffer dam, powerhouse, and power intake, as per specifications, drawings/design.
  • Evaluated construction activities including mass concrete, drilling of holes, grouting and installation of ground anchor bars and wire mesh, pile load test, and piling works ensuring compliance with contract documents.
  • Reviewed relevant construction & shop drawings to execute project activities in line with project specifications and standards.
  • Ensured compliance with Health, Safety and Environmental (HSE) requirements and safety measures at work sites, including PPE & safe working platforms.
  • Identified and reported unsafe acts and hazards to the HSE teams.
  • Reviewed Method Statements and Test Plans for each activity ensuring thorough preparation of daily and monthly progress reports.
  • Tracked & controlled project schedules, budgets, and progress milestones.

Executive Engineer (Civil) (BPS-18) (Addl.Charge) - Northern Power Generation Company Ltd (GENCO-III), Federal Ministry: Energy-Power Division - Muzaffargarh, Pakistan

(2021-06 - 2022-10)

  • Issued work orders to successful bidders’ post-tender process.
  • Initiated, discussed, and finalized criteria for bid solicitation documents for civil works.
  • Prepared Request for Proposal (RFP) and Post Qualification Documents (PQD).
  • Drafted Notice Inviting Tender (NIT) for publication in National Newspapers when bid price exceeded PPRA/KPPRA thresholds.
  • Participated in pre-bid meetings with consultants and contractors to address queries and facilitated proposal openings.
  • Ensured maintenance of cleanliness and compliance with regulations in the Thermal power station Colony and Powerhouse areas.
  • Managed annual repair and maintenance work of the Colony and power house.
  • Liaised with stakeholders and contractors to expedite project completion.
  • Reviewed cost estimates against drawings and WAPDA designs, presenting them for approvals.
  • Monitored overall project financials, including audit responsibilities and clearance processes.
  • Ensured compliance with safety protocols, fire-fighting equipment, first aid kits, PPE, and welfare facilities.

Sub-Divisional Officer (Civil) (BPS-17) - Northern Power Generation Company Ltd (GENCO-III), Federal Ministry: Energy-Power Division - Muzaffargarh, Pakistan

(2020-10 - 2022-10)

  • Supervised work progress to ensure adherence to the annual work program.
  • Conducted technical and financial evaluations for various bidding methods (single-stage single envelope, single stage two envelope, QCBS).
  • Negotiated and issued letters of award to the successful bidders.
  • Reviewed, negotiated, and procured goods as necessary; chaired procurement committee meetings.
  • Successfully resolved several grievances raised by bidders.
  • Inspected construction works for compliance with WAPDA Standards.
  • Checked sites and prepared estimates in alignment with the master plan for residential/non-residential buildings.
  • Monitored health and safety compliance measures at the power plant.

Asst. Resident Engineer / Jr. Engineer (Civil) - NESPAK - Pesh, KPK

(2018-04 - 2020-10)

Construction of Flats at Civil Quarters, Phase-II. Project Cost:886 Million & Financed by Provisional Govt.

  • Oversaw construction supervision of all works and ensured material quality adhered to specifications.
  • Supervised the reinforcement of infrastructure including heavy beams and concrete execution.
  • Expedited the work processes against the approved construction schedule through diligent oversight.
  • Generated monthly progress reports detailing project advancements.
  • Managed quality control & assurance in line with specified drawings and specifications.
  • Verified interim payment certificates including final bills, variation orders & any other advances.
  • Monitored contractor submissions, technical reports, and letters regarding site-related issues.
  • Organized and planned workmanship duties and reviewed subcontractor performance.

Asst. Resident Engineer / Jr. Engineer (Civil) - NESPAK - Swabi, KPK

(2016-05 - 2018-04)

Up-gradation of Bacha Khan Medical Complex. Project Cost:1136 Million & Financed by Provisional Govt.

  • Supervised all construction activities at the project site according to Specifications/Standards (Volume-II).
  • Monitored construction supervision of mass concrete for raft footings; studied and implemented architectural/structural drawings.
  • Compiled project progress reports and documentation.
  • Ensured all construction sources received approval from the Material Engineer.
  • Verified and checked IPCs ensuring compliance with current MRS.
  • Supervised field density tests (FDT) prior to executing lean concrete works.
  • Conducted pre-qualification and post-qualification evaluations of contractor’s bids.
  • Conferred with C&W department and contractor on contractual matters under FIDIC conditions.
  • Engaged site staff regarding construction drawings (Volume-III) and detailed drawings (Volume-IV) to clarify ambiguities.

Project Engineer (Civil) - M/S CEMCON (Pvt.) Limited - Peshawar & Nowshera, KPK

(2016-01 - 2016-04)

Remodeling of Warsak Canal. Project Cost: PKR 1620 Million; 50% Financed by the Provincial Government and 50% by the Federal Government

  • Reviewed and interpreted civil drawings, specifications, BOQs, and technical documents.
  • Conducted site inspections for excavation, concreting, reinforcement, formwork, embankment, and structural works.
  • Approved materials per specifications, ensuring adherence to testing frequencies.
  • Coordinated effectively with contractors, consultants, government agencies, and local authorities.
  • Prepared Daily Inspection Reports (DIR) and tracked Request for Inspection (RFI) logs.
  • Composed QA/QC compliance reports for consultants and clients.
  • Monitored project progress against established timelines, milestones, and budgets.
  • Supervised the construction of various structures including canals, culverts, intake structures, reservoirs, pipelines, and embankments.

Education

M.Sc - Civil Engineering (Construction Engineering & Management) - Iqra National University, Peshawar (2017)

B.Sc - Civil Engineering - Iqra National University, Peshawar (2015)