Skip to main content
Amir Latif

Amir Latif

Project Management & Electrical Engineering Professional

Talent
IslamabadMember since January 1, 2026
Instrumentation and calibrationAnalogue/Digital signal checkingPLC systemHardware InstallationFinancial Analysis
·

Hire this person

Send a job offer directly to this candidate

Instrumentation and calibrationAnalogue/Digital signal checkingPLC systemHardware InstallationFinancial Analysis

About

PLC controlled Projects executed by Heavy mechanical Complex on Turn Key /Commissioning based. Complete electrical /instrumentations installation / As built Drawings. P & I Drawings / hook up drawings regarding instruments installation.

Experience

Manager (Project Management Department) at Heavy Mechanical Complex (1989-01 – 2012-12)

PLC controlled Projects executed by Heavy mechanical Complex on Turn Key /Commissioning based. Complete electrical /instrumentations installation / As built Drawings. P & I Drawings / hook up drawings regarding instruments installation.

  • Basic Chromium Sulphate Plant Rawat (Rawalpindi) by Attock Group - Complete electrical work including Cable Trenches, Motors installation and Power/control Cables
  • PLC (Allen Bradely) installation, including signal list, Digital/analogue details, Starting/stopping sequence and tripping sequence
  • Instruments hook up including level transmitter, Pressure transmitter and Temperature Transmitter etc. Pressure switches, Temperature switch and level switches etc.
  • Commissioning of variable speed drives (Vendor Lorey Somer France)
  • 100 ton/hr Asphalt Plant for Hyderabad Development Hyderabad - Installation of MCCs, Control Panels, PLC Panel (vendor Solution Engg; Lahore)
  • Electric Motors installation, Burners (Vendor Weishput Germany) for Asphalt melting
  • Instruments installation i.e Level switches, Burner Temperature control and weigh feeders
  • Installation of 15/7.5 Ton Portal Crane for Pakistan Navy at Dockyard Karachi and Jinnah Naval Base Ormara. Successfully completed Commissioning of Portal Crane and trial run/load test. Saved £100,000/- (Rs. 10,000,000/- approx.) against commission in the absence of Stother& Pitt U.K experts
  • Installation and commissioning of more than 10 Nos. of EOT Cranes including Explosion Proof Cranes ranging from 5 Ton to 20 Ton at PMO Turnawa, Taxila
  • Installation and Commissioning of approximately 02 Nos. 5 & 10 Ton EOT Cranes at AWC Hassanabdal
  • Installation and Commissioning of 01 No. of 15/03 Ton EOT Crane for PAEC
  • Installation and commissioning of 30 Nos. of EOT Cranes ranging from 5 Ton to 30 Ton at NDC Islamabad
  • Installation and commissioning of 02 Nos. 70/10 Ton EOT Cranes for GhaziBarotha Power house (WAPDA) Attock
  • Installation and commissioning of 02 Nos. 100 Ton EOT Cranes at Wapda foundation Lahore (WAPDA)
  • Installation and commissioning of 01 No. 5 Ton EOT Crane for Pakistan Petroleum Limited (PPL) Sui site
  • Installation and commissioning of 01 No. 40 Ton EOT Crane at SGM Sugar Mill Sukker (Gotki Site)
  • Installation and commissioning of 01 No. 40/5 Ton EOT Crane at ETIHAD Sugar mill (Rahim Yar khan)
  • Installation and commissioning of 01 No. 20/5 Ton EOT Crane at Bestway cement Kallarkahar
  • Installation and commissioning of 01 No. 20/5 Ton EOT Crane at Pioneer Cement Johar Abad
  • Installation and commissioning of 01 No. 20/5 Ton EOT Crane at Maple leaf Mianwali
  • Installation and commissioning of 02 No. 01 Ton/hr Boilers at ENAR PETROTECH Karachi (KRL Project)
  • Installation and commissioning of 02 Nos. 07 Ton/hr Boilers for PAK SUZUKI at Steel Mill Site Karachi
  • Installation/commissioning of ABB supplied instruments for Industrial Boilers 80 T/hr for sugar Mills
  • Installation and commissioning of 01X4 MW Hydel Project for NAPWD (WAPDA) at Kargah (Gilgit)
  • Installation of 04 MW (01 MW each) Generators supplied by Reliance Electric Germany
  • Installation of Generators control Panels of 400V generation voltage
  • Installation of Governers supplied by M/s BIWATER UK
  • Installation of lube system for Governers to control flow of Water
  • Installation of DC batteries/Thyristers for 110v DC control Voltage
  • Installation of 1000 KVA Transformers 400 volts/11000 volts
  • Installation of 11 KV Vaccum circuit Breaker of M/s AEG Karachi
  • Synchronization of all four Generators at same Voltage, Frequence & Power factos
  • Load testing of 11 KV HT lines for Local Gilgit areas

Deputy General Manager (Maintenance) at Heavy Mechanical Complex (2012-01 – 2022-12)

  • Supervising Preventive and Breakdown maintenance of Transformers/Power House/Machines/Cranes
  • Planning and leading the technical team of sub-ordinates for timely and effective maintenance
  • Effective decision making in technical scrutiny of newly procurement of machine/items/spare parts for satisfactory operation of Machines
  • Supervising the sub-ordinates regarding Electricity/Oxygen/Sui-gas Billing and consumption

Project Lead at Heavy Mechanical Complex (2022-01 – 2024-12)

1MW Solar Project installed/Commissioned At Heavy Mechanical Complex Taxila

Education

BSc. in Electrical Engineering (Hons.) – UET, Peshawar (1989-01)

FSc. in Pre-Engineering – BISE Peshawar (1983-01)

Matric. in Science – BISE Peshawar (1980-01)

Reviews