Chief Surveyor - Frontier Works Organization (FWO) - Bela, Balochistan, Pakistan
(2026-01)
- Project Scope: 131 km Highway Rehabilitation/Construction for National Highway Authority (NHA)
- Leading the senior survey engineering staff
- Conducting comprehensive design drawing reviews
- Identifying critical design gaps
- Correcting a large volume of missing data in Interim Payment Certificate (IPC) drawings
- Managing day-to-day coordination with clients, consultants, and design houses to finalize shop drawings
Chief Surveyor - Frontier Works Organization (FWO) - Gold Mine Project
(2023-09 - 2025-09)
- Project Scope: 67 km specialized road infrastructure project for Barrick Gold
- Directed all field survey layouts and setting-out operations
- Analyzed structural drawings
- Resolved deep technical layout/alignment discrepancies from designers
- Successfully implemented real-time corrections on-site
Chief Surveyor - Westcon Construction Pvt. Ltd. - Lahore, Pakistan
(2021-12 - 2022-10)
- Project Scope: University of Lahore (Hospital Buildings, Bridges, Roads, and Underground Utilities)
- Oversaw progress and structural quality control for diverse infrastructure layouts
- Led technical meetings with clients and consultants
- Managing and cross-checking field data from sub-survey teams to maintain design fidelity
Chief Surveyor - Gold Homes Real Estate (Local Contractor) - Rawalpindi, Pakistan
(2010-11 - 2021-09)
- Managed multi-site civil layout teams
- Checked design alignments
- Ensured strict quality compliance
- Established safety protocols while consistently meeting fast-tracked project timelines
Senior Surveyor - Ghantoot General Transport & Road Contracting Co. - Dubai, UAE
(2007-11 - 2010-05)
- Audited complex road and structural infrastructure designs to prepare flawless, construction-ready shop drawings for high-tier municipal execution in Dubai
Senior Surveyor - Mazyood Giga Construction Co. - Karachi, Pakistan
(2006-06 - 2007-11)
- Project Scope: Marine Water Protection Wall & 100-Acre Coastal Refill Project in the Arabian Sea (Base for EMAAR High-Rise Buildings)
- Handled complex maritime land-reclamation math
- Managed field teams
- Ran high-accuracy hydrographic/topographic calculations
- Coordinated directly with consultants
Senior Surveyor - Taisei Corporation (Tokyo, Japan) - Kandahar to Herat Highway Project, Afghanistan
(2005 - 2006)
- Project Scope: 115 km Highway Construction under a UNO-backed initiative in a highly volatile region
- Successfully shifted, verified, and closed high-order Benchmark (BM) networks across long distances
- Achieved minimal error margins under extreme environmental and security constraints
Senior Surveyor - Echowest International Construction Co.
(2005-05 - 2005-11)
- Project Scope: Mega Underground Water Pipeline Project
- Served as the primary technical surveyor for the entire project lifecycle
- Checking baseline design parameters
- Drafting precise shop drawings
Senior Surveyor - World Kaihatsu Kogyo Co., Ltd. (Japan) - Kandahar, Afghanistan
(2005-01 - 2005-04)
- Project Scope: Kandahar-Herat Highway Project (24 km Segment, UNO Client)
- Executed rigorous benchmark shifting and control checks
- Received an official Letter of Recommendation from the Project Manager for maintaining an unblemished, error-free construction progress track record under hazardous field conditions
Surveyor - Saita Gumi Co., Ltd. (Japan) - Kandahar to Kabul Road Project, Afghanistan
(2004-02 - 2005-04)
- Oversaw critical leveling control for premium asphalt paving
- Established the control lane markings that contributed to a company milestone of flawless high-thickness asphalt layer paving
Surveyor - Murshid Builders Pvt. Ltd. - Kohat, Pakistan
(2000 - 2002)
- Project Scope: Landmark Tunnel and Highway Infrastructure Project
- Handled foundational topographic mapping
- Structural center-line positioning using high-end laser technology
- Alignment marking for underground blasting operations
- Precise lean concrete leveling
- Collaborated heavily within a diverse, multinational engineering environment