PRODUCTION ENGINEER - FALCON PACKAGING GUJRANWALA - Gujranwala
(2026-01)
- PROCESS OPTIMIZATION
- PRODUCTION PLANNING
- QUALITY CONTROL
- SAFETY COMPLIANCE
- RESOURSCE MANAGEMENT
- VISCOSITY CHECKING
- CHECK BOILER TEMP
- MANAGE DAILY REPORTS
OUTAGE SHUTDOWN PROJECT 1 - 330MW PROJECT THAR NOVA ENERGY - Thar
(2025-01 - 2025-09)
- Motor yeraly maintenance
- Replace plug wires as needed
- testing
- cleaning
- lubrication
- connection check fitting fan cover checking
- tighting
TECHNICIAN - ENGRO FERTILIZER DAHARKI - Daharki
(2024-04 - 2024-12)
- ENVEN PLANT SHUTDOWN
- 6.6KV breaker room service and maintenance
- Vcv breaker
- Acb breaker
- testing (megger dector vidaar)
- lubrication
- tighting
- control work
- back site cable testing
- site motor maintenance
Techinician - ENGRO POLYMER &CHEMICAL KHI - Karachi
(2024-02 - 2024-02)
- lighting support service electrical work
- manage all site provide power
- breaker work like (elcb rcbo mcb)
Supervisor - K ELCTRIC 900MW COMBINE CYCLE PROJECT BQPS III
(2021-08 - 2023-12)
- Control Panel techincian they install'repair and maintenance of electrical control panels lv
- install maintain dbs and juntion box
- testing motor and site valve
- Read and interpret electrical schematics blue print diagram
- Ensure complaince with safety regulation and guideline
- Documents work performed and maintian accurate tools
- take and give permit to site install and repair equipments
- small dbs work
TRAINEE ENGINEER - 747MW CCPP GUDDU THERMAL POWER STATION - Guddu
(2020-01 - 2020-12)
TRAINEE ENGINEER ( O&M) COMBINED CYCLE THERMAL POWER PLANT
- Operated 243-2 MW GE Mark Victa gas turbine And 261MW hd turbine
- handied gad turbine steam turbine and boiler
- operation including hot and cold startups
- managed emergency sitauation and continously montiored operational efficency and others key matrics
- operated the 500kv switchyard co ordinated with NPPC ISLAMABAD
- Conducted testing and monitoring of various valve pumps fans and compressors