Senior Draftsman currently working in the hydropower industry in Pakistan for the country's leading civil consulting companies in a joint venture with different Consultants working on Engineering Projects. Almost 20 years of work experience in the sectors of Hydropower and Structures Underground Tunneling. Hard working and quick learner, eager to join a progressive organization and work with professional teams. Also eager to learn new Skills and Technologies Advancements.
Chief CAD Draftsman - NEELUM JHELUM CONSULTANTS - Malik House lower Chatter Muzaffarabad
(2020-11)
Presently working at Neelum Jhelum Consultant (NJC) as Chief CAD Draftsman. Deputed at the project on behalf of National Development Consultants (NDC). NJC consortium is responsible for the design construction supervision of 969 MW Neelum Jhelum Hydropower Project.
Involved in Preparation of Architectural and Structural drawings for Colony Buildings, Plumbing, Surface Drainage Works, Road Layout, Spillway Structure, Sedimentation Basin, Debris Channel, Switchyard, Collecting Canal, Substation, Administration & Control Building, Tunnels, Access Tunnel, Adits Portal, Outlet Structure & Completed Record Drawings. Also controlled the Drawing Data Management System (DRPRO 2013) for the Neelum Jhelum Consultants.
CAD Draftsman - Construction Supervision Services for Six Numbers Gates Of Sukkur Barrage And Associated Works On Emergency Basis - D-288 KDA Scheme No. A1 Stadium Road Karachi
(2019-04 - 2020-05)
Sukkur Barrage is a barrage on the River Indus near the city of Sukkur in the Sindh province of Pakistan. The barrage was built during the British Raj from 1923 and was rehabilitated in November 2004. Located across River Indus, about 300 miles North East of Karachi.
CAD Technician - Punjab Intermediate City Improvement Improvement Program Phase II - 6th floor, Local Government Board Complex Sanda Road Lahore
(2018-10 - 2019-01)
The Punjab Intermediate Cities Improvement Investment Program, a $ 500 m Sector Lending Loan Facility ($ 500 Million ADB Load and $ 100 Million GoPB component) is funded by the Asian Development Bank (ADB) to be implemented over a period of 6 years. PICIIP aims to improve the efficiency and financial sustainability of five intermediate cities (Sialkot, Sahiwal, Rahim Yar Khan, Bahawalpur and Sargodha) and effectiveness of urban services including water supply, waste water project, treatment, solid waste management, transport infrastructure and up gradation of Punjab Local Government Academy Lalamusa.
Unit is the Technical Advisor on the Program design, planning, environmental compliance, urban planning and Capacity Building Components.
Sr. Draftsman / Cad Technician - NEELUM JHELUM CONSULTANTS - Malik House lower Chatter Muzaffarabad
(2008-09 - 2018-06)
Neelum Jhelum Hydroelectric Project is located in the vicinity Muzaffarabad (AJ&K). It envisages the diversion of Neelum river water through a tunnel out falling into Jhelum River. Project has installed capacity of 969 MW.
The total length of head race tunnel is 28.5 Km. A 15.1 Km stretch of the tunnel will be constructed as a twin tunnel system each with x-section of 53 Sq.m. The remaining head race tunnel down to the surge chamber will be a single tunnel having x-section of 114 Sq.m The tunnels are shotcrete lined with a concrete invert.
The tunnel crosses Jhelum River approximately 200 m below its bed. The tunnel will be accessed by 7 Adits for construction and rock support.
Draftsman / Cad Operator - Hingol Dam Consultant Joint Venture - 58-L Model Town Lahore
(2007-09 - 2008-09)
Hingol Dam Hydropower Project. The dam site is located in District Lasbela near Aghor on Hingol river in Balochistan Province at a distance of 233 Kms North West of Karachi and about 8 Kms North of Kund Malir where the river falls into the sea. Storage 0.78 MAF Area To Benefit 50000 Acres Power 300 KW Cost 206 Million US ($) Con. Spillway Capacity 209000 Cusecs Implementation ICB River Hingol Area Under Irrigation 50000 Acres.
Auto CAD Operator / CAD Technician - Mott MacDonald of Pakistan - 187-C Model Town Lahore
(2007-01 - 2007-09)
840 MW Sukki Kinari Hydropower project is the largest private sector hydropower initiative in Pakistan.
Kinari is arguably the best and highest ranked hydropower projects in the entire river system of Pakistan. Located in the peaceful district of Mansehra, this project had been studied in detail since 1960 by renowned international consultants like Chas T. Main, Montreal Engineering Company Limited, NESPAK and GTZ (Germany) when it was finally advertised for development in the private sector in 2005. SK Hydro hired Mott MacDonald Ltd to conduct the bankable feasibility study which confirmed the potential and benefits of this unique hydropower scheme.
Auto CAD Operator - Nazami Associates - 165 Pak Block Allama Iqbal Town, Lahore
(2003-02 - 2005-07)
Worked as Auto CAD Operator under Training of Senior Engineer of different Projects, Drainage Tunnels & Architecture, Mechanical, Electrical, Civil, Geological, and Geotechnical Drawings.
Intermediate of Commerce - Commerce - Board of Intermediate & Secondary Education (1996)
Matriculation - Science - Government Pilot Secondary School, Wahdat Road, Lahore