C E K
Civil Engineer
Hire this person
Send a job offer directly to this candidate
About
Highly skilled and knowledgeable Civil Engineer with a strong record of sound and safe public works construction projects with proper management. Adept at coordinating with building and engineering professionals for every project stage. Strong multitasker with exceptional skill in functioning well in a high-pressure work environment.
Experience
Pavement Data Collection Engineer at Engineering Consultants International (Pvt.) Ltd (2024-05 – 2025-03)
Data Collection and Analysis for the Preparation of Road Asset Management Plan (2024) for the Directorate of Road Asset Management in Communication & Works Department (Government of Punjab, Lahore, Pakistan). Communication and Works Department (CWD) Punjab, Pakistan desires to restructure its organization to achieve the highest standards which shall be based on best international practices regarding maintenance management of Road Assets. CWD intends to have a robust and effective Road Asset Management System so that all the incongruent and disparate assets can be monitored and managed within the same system, which shall be based on the ArcGIS database.
This will facilitate CWD in making informed decisions regarding maintenance management of its Roads and Infrastructure Assets.
- Complete the road network definition i.e., developing a complete inventory of the road network in the Geographical Information System (GIS), (81,000 Kilometre Carriageway Length)
- Development of location referencing and geocoding of all the Road Assets included in the scope of the Project, (81,000 Kilometre Carriageway Length)
- Conducting data collection for the evaluation of Road Network and recording all the pavement associated deteriorations. (81,000 Kilometre Carriageway Length)
- Conducting roughness surveys by making use of the appropriate technology. (81,000 Kilometre Carriageway Length)
- Determining pavement functional life by conducting falling weight deflectometer testing for Arterial Roads at 3km Interval, (8,000 Kilometre Carriageway Length)
- Geo – Tagging of Bridge Structure with basic information, (81,000 Kilometre Carriageway Length)
- A complete dataset is required for the analysis in HDM – 4 software
- Development of asset management plan
- Condition evaluation of complete road network of Punjab within the scope of work i.e 81,000 Kilometre Carriageway Length
- Computing Pavement Condition Index (PCI) – Flexible Pavement, ASTM D 6433-20 Standard Practice for Roads, and Parking lots Pavement Condition Index Survey Using Paver 7.0.9
- Efficient adaptation of ASTM & AASHTO code
SITE ENGINEER at (DESCON) ENGINEERING (Pvt.) Ltd (2018-08 – 2024-01)
Interloop Apparel Project
- Prepare all the documents related to office like Quality Control inspection on Site, account details, details record, staff attendance records etc.
- Confidently consulting with clients and other professional subcontractors
- Inspection of the work on site to Client and providing estimates for projects
- Determined project feasibility by estimating the quantities and cost of labour, equipment, and materials
Education
B.Sc. in Civil Engineering Technology – MNS University of Engineering & Technology MULTAN (2018)

