Sector G-8 Islamabad. (Pakistan)
+92-312-9121472
+92-301-5393242
+92-334-5393242 whattapp johnimalik@gmail.com mr.gm25@yahoo.com gmmalik5
Education: Diploma of Associate Engineer Petroleum
Board of Technical & Professional Education
Computer Skill: ICS in computer Science
Languages: English, Arabic,
Urdu, Hindi.
Date of Birth: 20th May 1975
I am interested in working as Drilling supervisor. I am motivated by- challenge and opportunity and with my analytical, problem-solving skills and critical thinking, Believe that this position would be to our mutual benefit. With my experience, more than 22 years in the oil field drilling, I am looking for career growth and advancement.
I am accustomed to fast- paced environments where deadlines, safety and handling multiple jobs simultaneously are normal. I am willing to travel and my communication skills and work ethics with coworkers and supervisors are Excellent.
My work ethics are strong either as a team player or working alone without supervision. I have the ability to competently read and interpret any orders, etc. I am highly-Productive, quality conscious, competent, punctual, honest, hardworking and eager to better myself and –Increase my skills and knowledge.
I take great pride in my performance and initiative. I have over 8640 Safety days, and believe that safety is important to myself and all others around me. For your convenience, I have enclosed my resume’ which will provide you with a more thorough look at my qualifications.
I am confident that my skills and abilities are well matched for this position and would be happy to meet with you at your convenience, to discuss my qualifications. Please feel free to contact me at the above address and/or phone number.
I am Looking Forward to hearing from you.
Sincerely and faithfully.
IWCF (Supervisor Level4) (VALID) Date 01st Nov, 2021. Certificate Number DL4S-00041761-SA-BS8T from Kasco Centre Pakistan.
Date From - To15th Jan 2013 – September 24th 2021 ( Due to Covid-19, Waiting at home)Name of CompanyUnited Energy Pakistan Ex BP. PakistanNature of BusinessExploration, Develop well, Re-Entry Wells, Relief Well. Position HeldWell Site Leader / Drilling SupervisorJob Responsibility’s
We were plugged water formation and sometime plug the well.
Recommend promotion, development or disciplinary action.
Rig Type = Joy Stick Cyber Chair, Anti Collision System.
Draw works: LTI 2000HP, MAST: LTI Cantilever Mast Hydraulically Raised,
Mast Hight:148ft Static Hook Load Capacity:1,000,000lb, Drilling Line:1 ½, Top Drive: LTI/L-DDTD-500, Rotary Table:37 1/2, Engines:4XCaterpiller D-3512C SCAC, SCR:AC VFD System, BOP: GK 13 5/8 5000 PSI ,21 ¼ 2000 Psi, Mud Pumps:2XWH-1600HP, Total Drilling Depth Capacity:20800 ft,6340m.
Date From - To20th June 2010 - 20th May 2012Name of CompanyIraqi Drilling Company (Iraq) Ltd, joint advancer with Schlumberger IraqNature of BusinessCommissioning new rigs, Drilling, Work over & Exploration wells. Re-Entry Wells, Window cut Position HeldSr. Tool PusherJob Responsibility’s
Monitoring invoicing thread.
Swabbing wells
Position HeldDrillerEquipment Description Gross Nominal Capacity= 1,100,000 lbs with 12 lines, clear height142 FT. Draw works= NOV 2000EDB, 2000HP Disc brakes, and Electronic Drilling System EDS-3, Pipe CAT= automatic pipe handler Engines= 4xCAT3512B 1476 BHP, 60 Hz Generators, Model 1400 Ross hill SCR system, TDS= NOV -11SA 500 ton, with A/C motor, 5000 PSI rated with pipe handlers, Rotary table= NOV 37-1/2” W/GE752 independent drive. Mud Pump= Oil well 1700PT.BOP= EQUPMENT 21-1/4” 5000PSI and 13-5/8” 10,000 PSI.Pipe and casing handling Equipment =ST-80 Iron Roughneck, PS-21 power slips, power tongs. 500-ton spider elevators, Casing power tongs, tubing tongs, CRT (Casing Running Tool 350 / 500 NOV, Traveling Block = 500 Ton American, Drilling Capacity = 15000 Ft to 20000 ft, Rig Type = Joy Stick Cyber Chair, Anti Collision System. Job Responsibility’s
Motor, T/Block = 400 Ton, TDS = VARCO 11S, Total Drilling Capacity = 4000 Meter,
Engine = Caterpillar = Model No, D398, D399.
Job Responsibility’s
• Work over wells
Position HeldDerrick manJob Responsibility’s• Exploration Wells
Position HeldDerrick manJob Responsibility’s• Exploration Wells
Position HeldFloor manJob Responsibility’s• Exploration Wells
Position HeldRoustaboutJob Responsibility’sSchlumberger Drilling International Weatherford Drilling International
2020 Project Management Professional. (UEP)
2019 UEP Safety expectation. (UEP)
2019 Safety Observation & Conversation. (UEP)
2012 Amphion Rigs Training (WDI Abu Dhabi)
2012 Stuck Pipe. (WDI Abu Dhabi)
2012 Rig Asset Management System (RAMS) (WDI Abu Dhabi)
2012 Right Start prevention. (WDI Abu Dhabi)
2012 Safe Start. (WDI Abu Dhabi)
2012 Manual Handling Awareness. (WDI Abu Dhabi)
2012 Drilling Assessment. (WDI Abu Dhabi)
2012 Business Management System. (WDI Abu Dhabi)
2012 TOFS (Time out for Safety). (WDI Abu Dhabi)
2012 Basic Safety Rules and 8 GEMS. (WDI Abu Dhabi)
2012 Task Risk Assessment. (TRA) (WDI Abu Dhabi)
2012 Standard Operating Practices. (WDI Abu Dhabi)
2012 Control of Substances Hazardous to Health (COSHH). (WDI Abu Dhabi)
2012 Basic life Support (CPR). (WDI Abu Dhabi)
2012 Certificate of Appreciation (IDC IRAQ)
2011 10 HSE Golden Rules (SLB IRAQ)
2011 PTW L-2 (SLB IRAQ)
2011 Mechanical Lifting Workshop (SLB IRAQ)
2008 HSE Induction with JO (Joint Operation Kuwait)
2008 Basic Fire Fighting with (Proximity Kuwait by KDC)
2008 H2S with (Proximity Kuwait by KDC)
2008 Breathing Apparatus Basic Procedure (Proximity- Kuwait)
2008 Drilling Waste Management System with (Scomi Kuwait)
2008 Safety Leadership. (Saudi Arabia)
2008 JSA (Job Safety Analysis). (Saudi Arabia)
2007 Advance First Aid. (Saudi Arabia)
2007 Hazard Identification. (Saudi Arabia)
2007 Advance Fire Fighting. (Saudi Arabia)
2006 Safety Training Observation Program (Stop Course). (Saudi Arabia)
2001 H2S & SCBA (Self Contained Breathing Apparatus) (Total UAE)
Drilling Supervisor Onshore Drilling Project
Date From - To15th Jan 2013 – September 24th 2021 ( Due to Covid-19, Waiting at home)Name of CompanyUnited Energy Pakistan Ex BP. PakistanNature of BusinessExploration, Develop well, Re-Entry Wells, Relief Well. Position HeldWell Site Leader / Drilling SupervisorJob Responsibility’s
We were plugged water formation and sometime plug the well.
Recommend promotion, development or disciplinary action.
Rig Type = Joy Stick Cyber Chair, Anti Collision System.
Draw works: LTI 2000HP, MAST: LTI Cantilever Mast Hydraulically Raised,
Mast Hight:148ft Static Hook Load Capacity:1,000,000lb, Drilling Line:1 ½, Top Drive: LTI/L-DDTD-500, Rotary Table:37 1/2, Engines:4XCaterpiller D-3512C SCAC, SCR:AC VFD System, BOP: GK 13 5/8 5000 PSI ,21 ¼ 2000 Psi, Mud Pumps:2XWH-1600HP, Total Drilling Depth Capacity:20800 ft,6340m.
Date From - To20th June 2010 - 20th May 2012Name of CompanyIraqi Drilling Company (Iraq) Ltd, joint advancer with Schlumberger IraqNature of BusinessCommissioning new rigs, Drilling, Work over & Exploration wells. Re-Entry Wells, Window cut Position HeldSr. Tool PusherJob Responsibility’s
Monitoring invoicing thread.
Swabbing wells
Position HeldDrillerEquipment Description Gross Nominal Capacity= 1,100,000 lbs with 12 lines, clear height142 FT. Draw works= NOV 2000EDB, 2000HP Disc brakes, and Electronic Drilling System EDS-3, Pipe CAT= automatic pipe handler Engines= 4xCAT3512B 1476 BHP, 60 Hz Generators, Model 1400 Ross hill SCR system, TDS= NOV -11SA 500 ton, with A/C motor, 5000 PSI rated with pipe handlers, Rotary table= NOV 37-1/2” W/GE752 independent drive. Mud Pump= Oil well 1700PT.BOP= EQUPMENT 21-1/4” 5000PSI and 13-5/8” 10,000 PSI.Pipe and casing handling Equipment =ST-80 Iron Roughneck, PS-21 power slips, power tongs. 500-ton spider elevators, Casing power tongs, tubing tongs, CRT (Casing Running Tool 350 / 500 NOV, Traveling Block = 500 Ton American, Drilling Capacity = 15000 Ft to 20000 ft, Rig Type = Joy Stick Cyber Chair, Anti Collision System. Job Responsibility’s
Motor, T/Block = 400 Ton, TDS = VARCO 11S, Total Drilling Capacity = 4000 Meter,
Engine = Caterpillar = Model No, D398, D399.
Job Responsibility’s
• Work over wells
Position HeldDerrick manJob Responsibility’s• Exploration Wells
Position HeldDerrick manJob Responsibility’s• Exploration Wells
Position HeldFloor manJob Responsibility’s• Exploration Wells
Position HeldRoustaboutJob Responsibility’sDiploma of Associate Engineer Petroleum Board of Technical & Professional Education