Planning Engineer at Timeline Project Management (2025-07 – Present)
Working as a Planning Engineer on Different UAE Based projects.
- Assisted in Preparation of Project Baseline Programs and Extension of Time Claims (EOT's)
- Supported senior planners in project planning, scheduling, and progress tracking using Primavera P6
- Monitored project progress, updated schedules, and analyzed variances against approved baselines
- Reviewed contractor's submitted programs, method statements, and recovery schedules for compliance with contract and project milestones
- Coordinated with site engineers and contractors to collect progress data, verify quantities, and update schedules accordingly
- Maintained planning records, correspondence logs, and document control related to schedules and progress reports
- Assisted in the review, monitoring of baseline and updated project schedules in line with contract requirements
Urban Planning Intern at The Urban Unit (2024-06 – 2024-07)
Worked as an Urban Planning Intern on Different Public Sector projects.
- Data collection, sorting, and organization for urban infrastructure projects
- Assessment and documentation of existing urban facilities and their conditions
- Identification of missing infrastructure elements and gaps in provided data
- Proposal of improvement plans and future development interventions
- Preparation of categorized datasets and visual representation through graphs
- Formatting and rewriting of technical reports to meet organizational standards
- Submission of processed and verified data for digital mapping
- Consistent contribution to both office-based and remote assignments to maintain workflow continuity
Civil Architectural Engineer at Yanal Building Contracting L.L.C (2023-06 – Present)
Working as a Civil Architectural Engineer on Different International Projects.
- Prepared architectural and engineering drawings using AutoCAD and related software
- Developed layout plans, sections, elevations, and detail drawings for projects
- Assisted in design revisions based on client feedback and technical requirements
- Ensured drawings met quality standards and international best practices
- Produced construction-ready drawings for contractor and consultant use
- Submission of processed and verified data for digital mapping
- Consistent contribution to both office-based and remote assignments to maintain workflow continuity