Kash Bashir
Fiber Optics Supervisor
Hire this person
Send a job offer directly to this candidate
About
Strongly Dependable And Skilled Fiber Optics Supervisor And D Broad and Deep Knowledge Based In All Aspects Of Fiber Optic And Electrical Circuit Installation Maintenance And Repair. Flexible Scheduling Availability To Include Weekends And Emergency Situations As Required.
Experience
Supervisor ISP & OSP at Rapid Fiber Sargodha (2019-03 – Present)
- Working As A Network Superviser For Copper Ethernet Cable Optical Fiber Cable Network.
- Maintenance And Installation Of All Kinds Of Equipment Used For Ethernet And Optical Fiber Network (Copper Boxes, ODF,s, OLT,s Used For EPON And GPON, Switches And Nords 1G And 10G, Media Converters.
- Using Spicing Machines Comwave A3 And Exfo OTDR For Installation And Maintenance Of Whole Network.
- Configuration Of All Kinds Of Internet Routers And Modems Using For EPON And GPON i-e Huawei Tenda Tplink Netis Dlink ChinaNet Totolink etc.
- Termination And Patching Of ODF OLT MSAG ONU And All kinds Of Switches.
- Supervise All The Assigned Work In The Region 24*7 Nights And/Or Weekends, as Necessary.
- Document Plans, Requests, Activities And Specifications And Report On Them.
- Oversee And Coordinate Telecommunications Activities.
Network Technician And Supervisor at Al MASHARIQ Company Dammam (2015-07 – 2018-08)
- Worked As A Optical Fiber Technician In Development Department As A Third Party In STC.
- Installation And Testing Of New FDT,S, TB,s FTB,s And ODF,s.
- All Kinds Of Installation Of Optical Fiber Equipment Inside Plant And Outside Plant (ISP & OSP)
- Reading STC FTTH Plans And According To STC Plans Done All Programmes.
- Handling Termination And Splicing Of All Kinds Of FTTH And Straight Joints By Using Spicing Machines 50S 60S 70S And 80S For 12, 24, 48, 96, 144 And 288 Fiber Cables
- Collecting Data About Materials Used And Locations GPS Coordinates.
- Worked As A Team Leader In Corrective And Preventive Maintinence in Dammam On STC Maintinence Projects.
- Trouble Shooting Fault Locating And Maintenance By Using OTDR AFL FLX380 And Splicing Machine 70S And Power Meter Source Meter Optical Fiber Identifier And VFL.
- Worked As A Superviser In Al Dawiat And ITC Project Dammam As A Third Party By MOBILY. Worked On Corning NEW Equipment Joint Enclosures FDT,s TB,s And ODF,s. Also Supervision OF Pulling Cable.
- Attending Weekly & Monthly Meetings With STC, Huawei Management's.
- Coordination with STC District Network design, Engineering and New Implementation teams for day to day tasks.
- End to End Dark fiber Testing and Optical Power measurements at required wavelengths (1350,1550,1510)
- Working with centralized management ticketing system for updating the faults.
General Electrician at KohiMoor Textiles Mills Rawalpindi (2015-04 – 2015-07)
- Worked As A General Electrician.
- Installation And Maintenance Of Electrical Circuits Using 220v AC.
- Wiring Testing And Maintenance Of Buildings.
Optical Fiber Cable Splicer And Technician For Metro Project Islamabad at Pakistan Telecommunications Company Limited (PTCL) (2014-02 – 2015-04)
- Optical Fiber Splicing 12, 24, 36, 48, 72 And 96 Fibers Cable With Fujikura 60S And 80S.
- Handling, Termination And Splicing Of All Kinds Of Joint Enclosures For 12, 24, 36, 48, 72 And 96 Fibers Cable.
- Installation And Splicing Of All Kinds Of ODF,s With LC, FC And SC Male And Female Connecters (Slidable ODF, Patch Only ODF, Fixed ODF, ODF 3u_type HD, Rack-Mounted ODF And Wall-Mounted ODF) For 12 Fibers, 24Fibers, 48 Fibers, 72 Fibers And 96 Fibers Cable.
- Using OTDR ( AFL FLX280 And FLX380, Exfo FTB 2000, Yokogawa AQ 1210) Power Meter, Source Meter And VFL.
- Supervision For Digging To Find Damaged Or Cut Cables And Joint Enclosures.
- Well Relations And Coordination Qith Metro Project All Departments Teams.
- Shifting Cables, Joint Enclosures And MainHoles And HandHoles To Other Locations Before Metro Project Teams Worked On That Place.
Trainy And Network Technician at Real Solution G8 Markaz Islamabad (2011-01 – 2014-01)
- Optical Fiber Splicing And Termination Of All Kinds Of ODF,MSAG, And ONU.
- PTCL Copper Cable Splicing (10 To 1800 Pairs)
- Installation Of Microwave Links (Huawei,NEERA, NLC And ZTE) On Towers And Inside PTCL Exchanges.
- Installation Of All Kinds Of Pools And Towers On All Heights.
- Installation, Termination And Testing Of DC And DP.
- Testing And Trouble Shooting Of Optical Fiber Cable Using OTDR And VFL.
- Installation, Termination And Testing Of MDF (Main Distribution Frame) In PTCL Exchanges.
Education
Diploma Of Associate Engineer – Trendsetter Technical College And Vocational Centre Mansehra (2012)
Matric – Oxford System Of Education Baffa Mansehra (2009)
Optical Fiber Splicing Short Course – Telecom Foundation Islamabad (2011)
English Language Course – English Language Course Rawalpindi (2012)

