Boiler Engineer at Gandhara Tyre and Rubber Company (2024-01 – Present)
- Responsible for operation and maintenance of two Steam boilers 35TPH at 18bar Gauge Pressure.
- LPG / SNG Plant 60 ton, Hot water Deaerators Capacity 50TPH at 100 PSI Gauge Pressure, Steam Chiller Broad 500 RFT, Air Compressors Atlas Capco/Compare 45 cu-m/min. Refrigerant Air Dryers, Rotary vanes Vacuum pump 70 cu-m/min. Ultra Filter Unit, RO Plant, Cooling Towers, Dehumidifier Diesel Generators Caterpillar
Boiler Engineer at Engro Polymer and Chemicals (2013-04 – 2023-09)
- Responsible for operation and maintenance of two HRSG 47 ton/hr WP 38 bar G and 02 Package type fire tube boiler 20 and 16 ton/hr WP 10 bar G, steam and condensate system, water treatment
- Operation of utilities Honeywell experion 502 distribution control system and Yamatake DCS that covers raw water management system of 6.5 million gallon, Fire water station, Carrier Centrifugal Water chillers 1200 refg ton/hr x 06, Demineralization plant 60x3 cu-m/hr, waste water treatment plant 350 cu-m /hr (Activated Sludge Process), RO Plant 100 m3/hr. Cooling towers(Induced draft type) 22500 cu-m flow at 6 degree C Delta x01 and 580 cu-m/hr flow 6 degree C delta x01.Air compressors Ingersoll ran capacity 43cu-m/hr at 8 bar g x 04,Ingersoll rand capacity 10cu-m/hr at 8 bar g x 01, Compare capacity 05cu-m/hr at 8 bar g x 01,Air dryers 600 NM3/hr x02 at -40 degree C dew point, PSA Nitrogen Generation unit 600 NM3 x 02 at 7 bar g, Emergency diesel engine generator 1500KW x 02, Develop daily production report.
- Central control operation CCR rack room, HVAC room, fire alarm panel, Uninterrupted power supply units
- Operation of 15 MW tandem extraction condensing steam turbine
- Operation of Startup/Shutdown/ Emergency Handling of Hitachi Gas Turbine 25 MW/ FGC, General Substation MV/LV
- Operations of SCADA, MV/LV breakers LOTOTO
- Attend unit control group, sub HSE process, Jab safety analysis. Process hazard analysis. Incident investigation meeting.
Deputy Manager Boilers at Yunus Textile Mills (2008-10 – 2012-05)
- Responsible for operation and maintenance of 01 Package type fire tube boiler 10 ton/hr WP 10 bar G make Descon, Package type fire tube boiler 08 ton/hr WP 08 bar G make DDFC, Package type fire tube boiler 05 ton/hr WP 6 bar g make Ruston Thermax, WHRB 08 ton/hr WP 8bar g make DDFC, WHRB 1.2 ton/hr WP 8 bar g make DDFC, steam and condensate system, water treatment system at dying and printing unit.
- Responsible for operation and maintenance of 01 Package type fire tube boiler 05 ton/hr WP 08 bar G make DDFC, WHRB 3.5 ton/hr x 02 WP 8bar g make DDFC, steam and condensate system, water treatment system at weaving unit.
Senior Boiler Engineer at Serena Hotel Islamabad (2006-05 – 2007-12)
- Responsible for operation and maintenance of 02 Package type fire tube boiler 10 ton/hr WP 06 bar G, Water heating unit of swimming pool, steam and condensate system, water treatment system.
- Operation and maintenance HVAC System of direct fire absorption chillers make LG capacity 1000 refg ton/hr x 03, Air handling units, Fan coil units, air compressors and cooling tower.
- Main control room operation, guest complaints, facility complaints and fire alarm system.
Boiler Engineer/Power house Incharge at United finishing Mills (2005-04 – 2006-05)
- Responsible for operation and maintenance of 01 Package type fire tube boiler 05 ton/hr WP 07 bar G, steam and condensate system, water treatment system
- 02 Gas Generators, Air compressors x 04, cooling tower etc.
Boiler Attendant at Manzoor sizing Industries (2002-03 – 2004-12)
- Responsible for operation and maintenance of 01 Package type fire tube boiler 06 ton/hr WP 07 bar G make Ruston Thermax
- Responsible for operation and maintenance of 01 Package type water tube boiler 05 ton/hr WP 07 bar G make Babcock and Wilcox
- Steam and condensate system.
- Water treatment system Ion exchange unit capacity 20 cu-m/hr.
Boiler Operator at Hamza Sugar Mills (2000-08 – 2002-03)
- Responsible for operation and maintenance of 80 ton/hr WP 23 bar g double drum D type water tube baggas,HFO and coal fired boiler make Heavy Mechanical Complex Texila
- Responsible for operation and maintenance of 60 ton/hr WP 23 bar g double drum D type water tube baggas,HFO and coal fired boiler make Ittefaq engineering
- Cleaning of heating surface, maintenance of primary secondary and induced draft fans, economizers, air heaters, main baggas carriers.
- Tubes replacements, refractory work, burner cleaning, Baggas feeders etc.
- Steam and condensate lines, pumps etc.
- Water treatment system Ion exchange unit capacity 200 cu-m/hr.
Boiler Operator at Kamalia Sugar Mills (1998-11 – 2000-08)
- Responsible for operation and maintenance of 80 ton/hr WP 23 bar g double drum D type water tubebaggas,HFO and coal fired boiler make Karachi Shipyard and engineering works Karachi.
- Responsible for operation and maintenance of 40 ton/hr WP 23 bar g double drum D type water tube baggas,HFO and coal fired boiler make Babcock and Wilcox United Kingdom.
- Cleaning of heating surface, maintenance of primary secondary and induced draft fans, economizers, air heaters, main baggas carriers.
- Tubes replacements, refractory work, burner cleaning, Baggas feeders etc.
- Steam and condensate lines, pumps etc.
- Water treatment system Ion exchange unit capacity 200 cu-m/hr.