Skip to main content
Mehmood Nasir

Mehmood Nasir

Quantity Survey Specialist

Talent
Mohallah Baba Khail Yar Hussain, Tehsil Razar District Swabi KPK 23320 Yar Hussain, PakistanMember since July 4, 2026
Auto desk auto CADcivil 3dmonitor construction sitequantity surveyingMicrosoft ExcelMicrosoft Wordwrite Urdubuilding codes
·

Hire this person

Send a job offer directly to this candidate

Auto desk auto CADcivil 3dmonitor construction sitequantity surveyingMicrosoft Excel

About

National Assembly Nigeria National Assembly Building Extension Project Nigeria Multi Story Car Parking Project, Commission Building Project Recreation, National Judicial Institute Building Project

Experience

Quantity survey specialist at Strabic Construction Company (2024-01 – Present)

National Assembly Nigeria National Assembly Building Extension Project Nigeria Multi Story Car Parking Project, Commission Building Project Recreation, National Judicial Institute Building Project

  • Preparation of IPC's Preparation, Revise PC-I
  • Preparation of (VO) Variation Order
  • Escalation Claim & making C factor for Escalation Process of Mob Advance
  • Extension of time
  • Preparation of Bar Bending Schedule
  • Preparation of Estimates & rate analysis
  • Preparation of Sub Contractors RAR
  • Draw X-section Cut Fill Quantity CRM
  • Plum RCC Structure material estimation

Quantity survey professional at National Logistics Cell (2022-12 – 2024-11)

Remodeling of Defence Chowk Rawalpindi.

  • Processing Tender & Bidding documents Preparation of IPC's Preparation
  • Revise PC-I
  • Preparation of (VO) Variation Order
  • Escalation Claim & making C factor for Escalation Process of Mob Advance
  • Extension of time
  • Preparation of Bar Bending Schedule
  • Preparation of Estimates & rate analysis
  • Preparation of Sub Contractors RAR
  • Draw X-section Cut Fill Quantity CRM
  • Plum RCC Structure material estimation

Quantity surveyor at National Engineering Services Pakistan (NESPAK) (2021-06 – 2022-11)

School/Hospital Building Projects & RMK Road Project Murree. Cost Estimation. Supervision and coordination of the construction activities to achieve construction in Accordance with the Contract Documents, Report issues, status and progress of works on site Quality & Quantity

  • Preparation of Sub Contractors IPC's Preparation of Revise PC-I
  • Preparation of (VO) Variation Order
  • Extension of time
  • Preparation of Bar Bending Schedule
  • Preparation of Estimates & rate analysis
  • Preparation of Work Orders
  • Draw X section Cut Fill Quantity CRM
  • Plum RCC Structure material estimation

Quantity surveyor at National Engineering Services Pakistan NESPAK (2020-06 – 2021-05)

Dina to Mangla Road Dualization Project & C&W Complex Building Project.

  • Checking Quality & Quantity
  • Calculating all types of materials required as Per drawings
  • Preparation of BOQ as per given drawings
  • Draw X-section Cut Fill Quantity
  • Preparation of BBS related all kind of RCC Structures
  • Preparation of Estimates & rate analysis
  • CRM, Plum & RCC Structure material
  • Verifying Sub Contractors IPC's & Preparation of Monthly Progress Report

Quantity surveyor/Site Engineer at (MOL) MOL Pakistan Oil & Gas Co.B.V (2018-04 – 2020-05)

Ensuring that the Project Quality Plans interface satisfactorily with the requirements of the Contract and checking Quality & Quantity. The core activities of quantity surveyors include determining project budgets, measuring project quantities, preparing contract documentation such as Bills of Quantities and cost control documents, administering contracts, and preparing final Accounts.

  • Assisting project manager in establishing Client's requirements and undertaking scope of work analysis
  • RCC, UPVC, & Steel Piping estimation works
  • Bar Cutting Schedule
  • Dealing with Client and Contractors
  • Verifying IPC's & ensures that work is done According to the Specification of the project
  • Price/forecast the cost of the different materials needed for the project
  • Analyze outcomes and write detailed progress reports
  • Track changes to the design and/or construction work and adjusting budget projections

Quantity surveyor at Al Massad Construction Company (2016-03 – 2018-03)

Construction Building Project & Roads

  • Quantity Excavation for Structure
  • Concrete Of bottom Beam, Upper Beam blocks and finishing work
  • bar Bending & Bar Cutting Schedule
  • Verifying Sub Contractors IPC's & Preparation of Monthly Progress Report
  • Traveling from the office to various sites as required
  • liaising with the client and other construction professionals, such as project managers and site engineers

Quantity Surveyor at National Engineering Services Pakistan (2012-11 – 2016-03)

NHA (National Highway Authority) EPC/Turnkey Base FIDIC Project EPC Contract-Assistance Services to Employer for Verifying IPC's

  • Preparation of Revise PC-I
  • Preparation of (VO) Variation Order Client and Contractor
  • Preparation of NESPAK Monthly internal Invoice & Verifying IPC's & Preparation of Daily & Monthly Progress Report
  • Verifying IPC's & Preparation of Daily & Monthly Progress Report

Quantity Surveyor at (CRBC) CHINA ROAD & BRIDGES CORPORATION (Chinese Company) (2009-11 – 2012-11)

KKH Improvement Project Raikot to Khunjerab (335km) (Gilgit Baltistan). EPC/Turnkey base FIDIC Project Karakoram Highway (335km Road)

  • Retaining Walls, Brest Walls, Shoulder Protection
  • Drain, Center Stake, Culverts, Chutes
  • (102) Great and small Bridges, Girders
  • (18) Tunnels & Open Cut Tunnels
  • Snow corridor, Dame & Dikes, Duck
  • Earth Work & Draw X-Sections

Civil engineering technician at AA Associates (2008-03 – 2009-09)

Construction of 5 Numbers Bridges On Gilgit Skardu Road

  • Supervision of 05 Bridges on Gilgit – Skardu Road Structure
  • Dealing with client offices & preparation of bills
  • Preparation of Sites sketches
  • Preparation of technical site survey reports to layout plans

Assistant Quantity Surveyor at W.I.C (WAJID IQBAL & COMPANY) (2007-06 – 2008-03)

NOWSHEHRA Sheikh Maltoon Town (Mardan)

  • Technical work (design, estimation, implementation)
  • Dealing with client offices & preparation of bills
  • Preparation of Routine petty Contractor Bill
  • Preparation of Routine Contractor Bills

Education

Matric – The Scholor English School (1990-04 – 1999-08)

Civil Engineering Assistant in Civil Engineering – GCS Commerc collge Mardan (1999-09 – 2002-07)

Civil Engineering Assistant in Civil Engineering – Forward Technical Collge (2012-08 – 2016-10)

Quantity Survey in Quantity Survey – Frontier College (2009-01 – 2009-12)

Land Survey in Land Survey – Hira College (2009-01 – 2009-12)

Skills

Quantity Survey Specialist

Reviews