Mohammad Ilyas
Chief Engineer
Hire this person
Send a job offer directly to this candidate
About
Seeking for a position of a Chief Engineer in a multinational company where I am utilizing my technical skills and grow my career.
Experience
Chief Engineer - Space Crest Hotel Faisalabad
- Oversee all hotel engineering, maintenance, and technical operations.
- Manage electrical, HVAC, plumbing, generators, elevators, and other MEP systems.
- Supervise engineering staff, contractors, preventive maintenance, and emergency breakdowns.
- Ensure safety, energy efficiency, compliance, and proper maintenance of all equipment.
Chief Engineer - Best Western Plus Grand Hotel Multan
(2025-09 - 2026-07)
- System Oversight: Managing and repairing critical systems including HVAC, electrical, plumbing, mechanical, and fire safety systems.
- Preventative Maintenance: Developing and implementing schedules to prevent equipment breakdowns and maximize the lifespan of hotel assets.
- Budget & CAPEX: Managing the department’s operating budget, controlling repair and maintenance (R&M) costs, and overseeing Capital Expenditure (CAPEX) projects like renovations.
- Safety & Compliance: Ensuring the hotel meets all local building codes, safety regulations, and environmental standards.
- Team Leadership: Hiring, training, and supervising a team of technicians, plumbers, painters, and other specialized staff.
- Energy Management: Implementing conservation programs to reduce utility consumption and costs.
Assistant Chief Engineer - Avari Boutique Gujranwala Hotel
(2024-10 - 2025-10)
- Communicating the goals of the company to all engineers and professionals in the team.
- Supervising every phase of the project from start to completion.
- Calculating costs, material, labor, and time required for each project.
- Approving designs and budgets.
- Delegating tasks to engineering teams.
- Supervising staff training as well as equipment installation.
- Performing quality control checks on all systems and products.
- Quickly resolving disputes between staff.
- Acknowledging or rewarding good work.
- Analyzing data and drafting reports for review.
Sr. Electrical Supervisor - Faisalabad Serena Hotel
(2011-05 - 2024-09)
- Operation and maintenance of Generator, ATS, and Synchronizing system.
- Solar system operation and troubleshooting.
- Implementation of the preventive maintenance schedule.
- Yearly testing of transformers (2000KVA & 1000KVA).
- Earth pits testing.
- Maintenance of UPS and Troubleshooting.
- Operation and maintenance (2 Chillers of 350-RT & 1 of 170-RT), Boiler (2Ton).
- Operation and maintenance work of elevators, Road blocker and VFD.
- Installation and commissioning of new equipment.
- Operation and maintenance of Fire Fighting system and troubleshooting.
Sr. Electrical Technician, Working as Team Leader - Mobi Serve
(2010-03 - 2011-05)
- Work on power plant 3.2 MW capacity Perkins 400 Series.
- AC Stulz capacity 6-12 Ton/hr.
- Power rectifier, UPS, Battery bank on MSc, BSc.
- Work on ATS panel especially power control & Trouble Shooting.
Electrical Supervisor - Hitech Network Pvt
(2009-11 - 2010-03)
- Plan and schedule electrical maintenance and installation projects.
- Inspect completed work to ensure quality and adherence to specifications.
- Troubleshoot and resolve complex electrical issues.
- Maintain accurate records of work performed and materials used.
- Collaborate with other departments to support operational goals.
- Training and monitoring Electrical staff.
- Monitor inventory of Electrical supplies and order as needed.
- Participate in project planning and budgeting processes.
Electrical Forman in Bleaching Plant - Ehsan Sons Pvt
(2007-11 - 2009-11)
- Supervise and coordinate activities of electricians.
- Plan and layout wiring diagrams, conduit systems, and electrical panel locations.
- Ensure adherence to safety standards and procedures.
- Monitor the progress of projects to ensure they stay on schedule and within budget.
- Troubleshoot electrical problems and diagnose issues.
- Ensure that all materials and equipment are available for projects.
- To monitor work of electricians, ensure quality of work meets standards.
Assistant Electrical Forman - Ibrahim Fibers Pvt TP-III
(1993-05 - 2007-11)
- Work on power plant capacity 4 MW.
- Work on PLC and invertor and all electrical Control System in Spinning Unit.
- Work on LT/HT panel. Power control work and troubleshooting.
- Knowledge of Electrical Equipment wiring.
- Knowledge of NEC (national electric code).
- Knowledge of material safety data sheets (MSDS) preferred.
- Ability to read, write and perform basic mathematical functions.
- Ability to install and maintain electrical equipment.
- Ability to read and follow electrical diagrams, drawings and blueprints.
- Ability to operate computer and small office equipment.
- Ability to maintain inventory and property.
- Ability to make budget recommendations.
- Ability to use and repair small and heavy equipment or machinery.
Education
Matric - BISE Lahore (1992)