Skip to main content
Muhammad Abdullah Akram

Muhammad Abdullah Akram

Chemical Engineer having experience more than 10 years in the field of Water Treatment

Talent
KarachiMember since April 13, 2026
Water TreatmentReverse Osmosis (RO)Ultra FiltrationWastewater TreatmentSea Water DesalinationRO Pre-treatment System DesignMembrane Fouling ProcessesInstallation & CommissioningOperation & MaintenanceProject ManagementBusiness DevelopmentClient CoordinationLine SizingHydraulics and Pump HydraulicsAspen HysysGE WinflowsDOW RosaHYDRANAUTICS IMS DesignWinCapsAutoCADProcess Flow Diagram (PFD)Piping & Instrumentation Diagram (P&ID)MS WordMS ExcelMS PowerPointProblem SolvingPlanning and Organizational AbilityCommunication SkillsTeam LeadershipTroubleshootingProcess MonitoringPreventive Maintenance ChemicalsChemical Sales
·

Hire this person

Send a job offer directly to this candidate

Water TreatmentReverse Osmosis (RO)Ultra FiltrationWastewater TreatmentSea Water Desalination

About

Seeking a Mid-Level position in a reputable organization. More than 10 years of total experience in water treatment field including design, installation, testing, commissioning, operation & maintenance across Chemical Industries, Refineries, Textiles, Pharmaceutical and FMCGs. Over 5 years providing field services of chemicals for maintaining systems including Ultra Filtration, Reverse Osmosis, Wastewater Treatment, Boilers, and Cooling Towers.

Expertise in RO/RO pre-treatment system design, membrane fouling processes, and cleaning/maintenance chemical programs.

Experience in sales of preventive maintenance chemicals and water treatment chemicals for open and closed circulation systems.

Experience

Technical Manager at RCB Chemicals & Services (2021-01 – Present)

Managing Business development, planning and coordinating the operation & Installation Activities, adjustment and maintenance of water treatment Plants and chemical treatment programs for systems.

  • Supervising and inspecting water treatment units including Reverse Osmosis, de-ionized water, Purified water & wastewater and their related processes
  • Liaising with both current and potential clients to develop existing and new business opportunities
  • Identifying opportunities for improving water treatment procedures and provide recommendations on process changes
  • Operation Management with troubleshooting monitoring. Project Management commissioning and process monitoring
  • Putting together technical instruction for customers in relation to the use, operation and maintenance of products
  • Responsible for installation and commissioning of inline water treatment Controllers (Flow, pH, TDS, ORP, Level) and calibration

Process Application Engineer at RCB Chemicals & Services (2017-04 – 2020-12)

Technical capabilities of Water treatment, Product applications and functionalities before selection of equipment.

  • To prepare Commercial/Technical proposals, Operational Costs, Tender submission of proposed plants & to undertake technical evaluation of the bids
  • To prepare Capex proposals and estimation of projects, Budgeting & forecasting before project execution and sourcing from different manufacturers as per project requirement
  • To prepare & review of Process Flow, Process & Instrumentation Diagram & General arrangement of Equipment in Layout Diagram and preparation of BOQ lists accordingly
  • Experience in RO/RO pre-treatment system design and understanding of membrane fouling processes, and cleaning/maintenance chemical programs
  • Deals in the sales of preventive maintenance chemicals, water treatment chemicals for open circulation and closed circulation systems
  • To supervise the installation, analysis, and commissioning of equipment and projects acquired from the clients

Project Engineer at So-Safe Water Technologies (2015-12 – 2017-03)

Supervising, planning, and coordinating the installation, commissioning and operation & maintenance of all water treatment units (Reverse Osmosis, Ultra Filtration, Softeners, Deionization, and Filtration Plants) and their related equipment while ensuring water treatment processes and performance are in compliance with set standards of safety, quality and efficiency.

  • Operation & Maintenance Project
  • Installation & Commissioning Project
  • Water Production
  • Successfully installed and Commissioned 150K GPD Brackish Water RO Plant Getz Pharma Ltd
  • Successfully installed and Commissioned 2400 m3/day Sea Water Desalination Plant (DAF followed by Ultrafiltration followed by Sea Water RO) National Refinery Ltd

Application Engineer at Fluid Technology International Pvt Ltd (2013-04 – 2015-11)

Technical capabilities of Water treatment, Product applications and functionalities before selection of equipment. Prepare Commercial/Technical proposals, Operational Costs, and Tender submissions.

  • Technical capabilities of Water treatment, Product applications and functionalities before selection of equipment
  • To prepare Commercial/Technical proposals, Operational Costs, Tender submission of proposed plants & to undertake technical evaluation of the bids
  • To prepare Capex proposals and estimation of projects, Budgeting & forecasting before project execution and sourcing from different manufacturers as per project requirement
  • To prepare & review of Process Flow, Process & Instrumentation Diagram & General arrangement of Equipment in Layout Diagram and preparation of BOQ lists accordingly
  • Experience in RO/RO pre-treatment system design and understanding of membrane fouling processes, and cleaning/maintenance chemical programs
  • Deals in the sales of preventive maintenance chemicals, water treatment chemicals for open circulation and closed circulation systems
  • To supervise the installation, analysis, and commissioning of equipment and projects acquired from the clients
  • Involved in Several Projects of Brackish & Sea Water Treatment Plants through Design, Engineering, Installation & Commissioning
  • 30 m3/hr RO followed by Electro-Deionization System (Pakistan Petroleum Limited)
  • 25 m3/hr SWRO & 50 m3/hr BWRO (Al-Karam Textile Industries)
  • 3000 m3/day Ultra Filtration System followed by SWRO, BWRO Two Pass System (K-Electric Limited Bin Qasim)

Education

Master's Degree in Environmental Engineering (Water & Wastewater Treatment) – NED University of Engineering & Technology (2017)

Bachelor's Degree in Chemical Engineering – NED University of Engineering & Technology (2012)

Higher Secondary School Degree in Pre-Engineering Grade – DJ Science College

Reviews