About

I have 13 years experience in the field of plant operation

Experience

PAChem Global Pvt Ltd , Plot# 25 M-3 Industrial City Faisalabad Road(07-08-2020 to till up now:

As a Cheif Operator PAchem Global Pvt Ltd,Faisalabad Petrochemical (Aromatics ) Production & Refining complex.

Process Summary

Partial oxidation of Ortho Xylene using BASF catalyst in Vertical Fixbed Tubular Reactors having 11000 tubes is produced Phthalic Anhydride as main product

Plant has a production capacity of,36000 tons p/a Phthalic Anhydride.The reaction is an exothermic one and heat produced is recovered by a Salt bath circulation system in reactors and then used to produced Steam.Phthalic Anhydride is purified by a contineous Vacuum Distillation in two columns and finally stored in the form of Flakes.

Monitor and Control the plants using the DCS systems and SUPCON ECS700.

Work on following Sections.

Erection & Comissioning PHTHALIC ANHYDRIDE PLANT:

I have doing Erection & Commissioning of Phthalic Anhydride Plant,

Following equipment,

A)Oxidation Section

Reactor(Vertical Fixbed,Tubular

Programmable Switch Condensers

Scrubber

B) Distillation section

Heat Pre-treatment Vessels

Distillation Columns

C )Boiler & Utilities section:

Double Drum D-type Boiler duel fuel(Diesel Natural Gas) having capacity 15 t/h @ 30 barg

Nitrogen Generator Capacity 40 m3 / h

Screw Compressors × 2 by Ingersoll rands

Reverse Osmosis Plant having capacity 12 m3 /h

Cooling Tower having Capacity 2000 m3

Thermal Oil Heater coal firing 3.7 KW

Nimir Chemicals Pkistan Ltd , Faisalabad Road Sheikhupura Pakistan.(12-02-2013 to 06-08-2020:

As a Plant Operator Nimir chemical Lahore Pakistan a Petrochemical (Aromatics ) Production & Refining complex.