Muhammad Imran
HVAC–MEP Intern
Hire this person
Send a job offer directly to this candidate
About
DHA Phase 5 Head Office Islamabad: Supported installation activities for a 900 TR HVAC system involving chillers pumps compressors piping networks and 22 and 24 gauge GI ducting while reviewing submittals and project documentation.
Zeta Mall Islamabad: Assisted in commissioning and maintenance of a 300 TR HVAC system including cooling towers heat exchangers valves and piping through system inspections testing and troubleshooting activities.
DoubleTree by Hilton Islamabad: Gained hands on experience with a 600 TR chilled water HVAC system including ducting piping pumps cooling towers insulation works shop drawings as built drawings and technical submittals.
Experience
HVAC–MEP Intern - Smart Climate Solutions Pvt Ltd
(2025-07 - 2025-08)
- DHA Phase 5 Head Office Islamabad: Supported installation activities for a 900 TR HVAC system involving chillers pumps compressors piping networks and 22 and 24 gauge GI ducting while reviewing submittals and project documentation.
- Zeta Mall Islamabad: Assisted in commissioning and maintenance of a 300 TR HVAC system including cooling towers heat exchangers valves and piping through system inspections testing and troubleshooting activities.
- DoubleTree by Hilton Islamabad: Gained hands on experience with a 600 TR chilled water HVAC system including ducting piping pumps cooling towers insulation works shop drawings as built drawings and technical submittals.
HVAC Operations and Maintenance Intern - NASTP Lahore
(2026-01 - 2026-01)
- Completed the internship at NASTP, working with 5 multi-zone HVAC units, 3 master-slave setups, and 24-hour system monitoring via web dashboards.
- Assisted in installation, commissioning, and servicing of HVAC systems including multi-unit and backup components, ensuring 100% operational readiness.
Education
BSc - Mechanical Engineering - University of Engineering and Technology (2022-12 - 2026-06)


